Mobile Air Traffic Control Towers (MATCT) Request for Information (RFI)
Solicitation number
F3YCBJAB999
Issued by

About this file

This is a Request for Information (RFI) issued by the Air Force Life Cycle Management Center's Electronic Systems Directorate, Aerospace Management Systems Division (AFLCMC/ESA), located at Tinker Air Force Base, Oklahoma. The RFI seeks industry information for market research purposes to support potential future acquisition of Mobile Air Traffic Control Tower (MATCT) systems. This is not a solicitation and no contract will result; participation is limited to U.S.-registered contractors, and vendors will not be compensated for responses. The Air Force plans to procure up to 18 MATCT systems to replace legacy AN/MSN-7 Tower Restoral Vehicles across the Air National Guard, Air Combat Command, and United States Air Forces in Europe. The RFI is restricted to Traditional Tower solutions, excluding Digital or Remote Tower submissions.

The MATCT must provide robust, globally deployable Air Traffic Control capability supporting both military and civilian operations and enabling the Agile Combat Employment Concept of Operations. Technical requirements include climatic and environmental operation across -32°F to +120°F ambient temperatures, 360-degree cab visibility with adjustable tinting, height-extensibility up to 12 feet, and fail-safe mechanical locking systems. The system must accommodate three dedicated operator positions (or four as objective) with NVG-compatible lighting and ruggedized touchscreen terminals displaying Voice Switch Subsystem, AFAS/IDS5, and meteorological data. Communications requirements include simultaneous access to 12–16 UHF/VHF radio frequencies, 14–28 telephone lines per position, and ED-137C VoIP support. The system must feature a 72-channel voice recording subsystem, Electro-Optical/Infrared sensor suite with automatic slew-to-cue integration, Counter-Small Unmanned Aerial Systems integration, and wireless Airfield Lighting Control and Monitoring System capability. Power requirements specify automatic voltage transfer switches, ruggedized UPS maintaining 20–30 minutes backup during power loss, ultra-quiet diesel generator/APU operating on JP-8/F-24 fuel providing 72–96 hours continuous operation, and modular ballistic armor mounting brackets. The entire packaged system must fit within a single C-130 aircraft, support setup and teardown within 90 minutes by four trained personnel, incorporate electro-hydraulic auto-leveling on unprepared surfaces with up to 10-degree inclines, and include secure tactical cab storage for weapons and protective equipment. Reliability metrics require Mean Time Between Critical Failure of 2,000–5,000 hours, Mean Time to Repair of 30 minutes or less, and Mean Time to Restore System of 2 hours for unscheduled downing events. Vendors are requested to provide responses addressing company expertise, capability assessments, existing systems meeting requirements with C-130 transportability details, Technology and Manufacturing Readiness Level assessments per DoD guidance, commercial product classification analysis per FAR 2.101, rough order magnitude cost and schedule, and any additional relevant information.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information Mobile Air Traffic Control Towers (MATCT)

CUI

This is a Request for Information (RFI) only, issued as part of market research in accordance with (IAW) Federal Acquisition Regulation (FAR) subpart 15.201(e). This is not a solicitation/Request for Proposal (RFP), a Request for Quotation (RFQ), an Invitation for Bids (IFB), or a solicitation, and no contract shall be resultant from this synopsis. Aerospace Management Systems Division (AFLCMC/ESA) will not pay respondents for information provided in response to this RFI. Participation is limited to contractors registered in the United States. Submissions from non-U.S. contractors will not be considered. The Air Force Life Cycle Management Center's (AFLCMC) Electronic Systems Directorate, Aerospace Management Systems Division (ESA), Air Traffic Systems Branch (ESAA) Program Management Office (PMO), located at Tinker Air Force Base (AFB), Oklahoma, is requesting information from industry to assist in planning for the potential future acquisition of a Mobile Air Traffic Control Tower, hereafter referred to as MATCT.

This RFI is limited to Traditional Tower solutions. Submissions concerning Digital or Remote Towers will be excluded from review.

DESCRIPTION:

The MATCT must offer a robust, dependable Air Traffic Control (ATC) capability, deployable globally under any environmental conditions. It will support both military and civilian air operations, with a specific focus on enabling the Agile Combat Employment (ACE) Concept of Operations (CONOPS). The current acquisition planning strategy is to procure up to eighteen (18) MATCT systems to be distributed throughout the Department of the Air Force, replacing the Air National Guard (ANG), Air Combat Command (ACC), and United States Air Forces in Europe (USAFE) legacy AN/MSN-7 Tower Restoral Vehicles.

TECHNICAL REQUIREMENT:

(T) = Threshold (minimum requirement); (O) = Objective (desired capability)

2.1 Climatic & Environmental Conditions

• Ambient Temperature (Outdoor):

o Operating: -32 ⁰F to +120 ⁰F (T=O) o Non-operating: -4 ⁰F to +140 ⁰F (T=O)

• Cab Internal Temperature:

o Operating: 45 ⁰F to +88 ⁰F (T=O) o Non-operating: -4 ⁰F to +140 ⁰F (T=O)

• Relative Humidity: Up to 95% operating and non-operating (T=O)

• Barometric Pressure:

o Operating: 30.02 to 21.23 inches of mercury (altitude from 100’ below to 9,200’ above sea level) (T=O) o Non-operating: 30.02 to 4.38 inches of mercury (altitude from 100’ below to 45,000’ above sea level) (T=O) o Ascent/Descent Rate: Up to 10,000 ft/minute (T=O)

• Wind Velocity:

o Operating (Extended): 40 knots continuous with up to 70-knot gusts (5–10 second duration) from any direction without degradation in performance; maximum slope of ±10⁰ (T=O) o Non-operating (Retracted): 118 knots continuous with up to 130-knot gusts (5–10 second duration) from any direction (T=O)

• Icing & Hail:

o Operating: Up to 0.25 inches of glazed ice on any exposed surface in 40-knot winds, and hailstones up to 0.5 inches in diameter without performance degradation (T=O) o Non-operating: Up to 2.0 inches of glazed ice on any exposed surface in 70-knot winds

(T=O)

• Snow Accumulation: Up to 20 lb./ft² of total accumulation on horizontal surfaces without degradation (T=O)

• Sand, Dust, and Fog: Highly resistant to sand, dust, salt-fog, rust, corrosion, and fungus growth

(T=O)

• Shock & Vibration: No degradation in performance during ground transport or C-130 airlift

(T=O)

Tower Cab Design

• Cab Windows:

o Designed with a 15-degree outward angle (T=O) o Feature adjustable, user-controlled tinting (T=O) o Provide an unobstructed 360-degree view of the airfield and flight operations (T=O)

• Egress & Security:

o Primary and alternate means of egress (T=O) o Securely lockable from both inside and outside via a cipher lock system (T=O)

• Tower Cab Elevation: Height-extendable up to 12 feet (T) or higher (O)

• Fail-Safe Mechanisms: Incorporate a mechanical fail-safe locking system to prevent tower cab collapse in the event of hydraulic pressure loss, pneumatic failure, severed electrical circuits, or combat battle damage (T=O)

Operating Positions & Cab Equipment

• Operating Positions: Three (3) dedicated operator positions (T); four (4) positions(O). One position in both cases shall be designated as a supervisor position

• Lighting: Each position shall have an individually adjustable, dedicated light source that is Night

Vision Goggle (NVG) compatible (red and green) and does not obstruct the operator’s view (T=O)

• Touchscreen Terminals: Each position shall include a ruggedized, NVG-compatible touchscreen computer connected to the MATCT Uninterruptible Power Supply (UPS). It must display:

o Voice Switch Subsystem (VSS) interface o AFAS/IDS5 application interface (including all required hardware/software routing) o Meteorological subsystem data o GPS clock application (12-hour and 24-hour formats synched to a GPS source)

• Signal Light Guns: Include two (2) Government Furnished Equipment (GFE) SLG LED UK (or current FAA standard) signal light guns with accompanying cab mounts (T=O)

• Flight Progress Strip Bays: Flight progress strip holders angled at 55 degrees (T=O), capable of holding ten (10) strips (T) or twenty (20) strips (O) of standard FAA dimensions (1" x 10") per position

Communications, Networking, & Sensors

• Network Redundancy: Integrated redundant Local Area Networks (LAN) (T=O)

• Voice Switch Subsystem (VSS):

o Provide simultaneous access, operation, and control of 12 (T) or 16 (O) UHF/VHF radio frequencies (channels) from all positions o Provide access to 14 (T) or 28 (O) telephone lines from each position o Support ED-137C VoIP communication, IP, and latency requirements (T=O) o Each workstation must support two audio jacks (primary and trainee) and a single parallel

PTT footswitch (T=O)

• Radio Communications:

o Ground-to-Air (G/A) and Ground-to-Ground (G/G) half-duplex, line-of-sight voice communications complying with FAA and ICAO standards (T=O) o Include 8 (T) to 10 (O) URC-300 VHF/UHF radios for ATC communications o Include 3 (T) to 6 (O) PRC-158 secure voice VHF/UHF radios (T=O) o Support simultaneous operation of 10 radios on any combination of frequencies, with up to 6 (T) or 10 (O) radios transmitting simultaneously o Fully meet all COMSEC requirements (cryptographic, physical, and emissions security)

(T=O)

• RF Emissions Control (EMCON): Integrate an EMCON management profile to minimize and manage the electromagnetic footprint of the MATCT (T=O)

• Meteorological Subsystem: Support wireless security meeting FIPS 140-2 (AES-256) between the cab and two separate sensors up to 5,000 feet away (T=O). Minimum sensor tolerances:

o Temperature: Range in 1⁰F increments with ±0.5⁰F accuracy o Wind Direction: 1⁰ increments with ±5⁰ accuracy o Wind Speed: ±1.1 mph from 5 to 99 mph (2-minute average) o Wind Gusts: Monitored over a rolling 10-minute average o Barometric Pressure: Referenced to sea level (±0.033 in/Hg accuracy) o Ceilometer to measure cloud ceiling.

• Voice Recording Subsystem (VRS): Minimum 72-channel recording capacity capturing all operator, radio, and phone lines continuously for 24 hours, with a retention period of at least 45 days (T=O)

• Electro-Optical/Infrared (EO/IR) Sensor Suite: Dedicated or integrated mast-mounted pan-tilt-zoom (PTZ) EO/IR suite containing a continuous-zoom daylight HD camera, thermal camera, eye-safe Laser Range Finder (≥5km range), and automatic slew-to-cue integration with radar, C-sUAS, and ADS-B alerts (T); add AI target classification and identification (O)

• C-sUAS Integration: Feature an integrated Counter-Small Unmanned Aerial Systems (C-sUAS) Common Operational Picture (COP) interface for real-time local airspace threat awareness (T=O)

• Airfield Lighting Control: A wireless Airfield Lighting Control and Monitoring System (ALCMS) for remote command/control of expeditionary runway edge, threshold, and PAPI lights.

Provisioned as interface-ready for GFE radios (T) or as an integrated, certified wireless ALCMS (O)

Power & Survivability

• Power Distribution: Automatic voltage transfer switches accepting 3 sources: commercial utility power, primary generator, and backup generator (T=O)

• Uninterruptible Power Supply (UPS): Ruggedized, filtered UPS system to power all critical mission systems during a power loss or switchover for a minimum of 20 minutes (T) or 30 minutes (O)

• Onboard Power Generation & APU: Integrated or onboard ultra-quiet diesel generator/APU operating on JP-8/F-24 fuel. Shall provide ≥72 hours of continuous operation without external refueling at full HVAC load, and support ≥30 minutes of silent watch on internal batteries (T);

provide ≥96 hours of fuel capacity and ≥2 hours of silent watch on internal batteries (O)

• Auxiliary Power: Minimum of one (1) user-accessible 110/220V power outlet per operator workstation (T=O)

• Environmental Control Unit (ECU): Sized to maintain all tower cab and equipment rooms within operational thresholds, to include a backup system. (T=O)

• Armor & Signature Reduction: Include mounting brackets for modular ballistic armor panels and an ultra-lightweight multispectral camouflage netting system (ULCANS) to reduce visual, thermal, and radar signatures (T); include NIJ Level III ballistic cab perimeter panels (O)

Transportability, Setup, & Storage

• Transport Readiness: Fully capable of withstanding transport via rail, air (C-130), ship, towing, and flatbed truck without degradation. Design must include shock trays and transport tie-downs (T=O). Ground transport must meet SAE AS8090 Type IV mobility standards using standard USAF prime movers (e.g., M1083 or equivalent) under all weather conditions (T=O)

• C-130 Footprint: Entire packaged system must fit within one (1) C-130 aircraft (T=O)

• Trailer Auto-Leveling: Ground trailer must incorporate an electro-hydraulic auto-leveling stabilization subsystem capable of leveling the tower shelter on unprepared surfaces with up to a 10-degree incline within 15 minutes of uncoupling (T); single-button automated leveling (O)

• Operational Setup/Teardown Timelines:

o Standard Uniform: Setup/teardown by 4 trained personnel within 90 minutes (T=O) o Cold Weather / NBC MOPP IV: Setup/teardown by 4 trained personnel within 2 hours

(T=O)

• Tactical Cab Storage: Provide secure cab storage per controller position for:

o One (1) individual rifle (T=O) o One (1) set of MOPP 4 gear (T=O) o One (1) set of body armor and combat helmet (T=O)

• Supply Support: Package a 45-day Readiness Supply Support Kit (RSSK) in portable, secured containers inside the MATCT (T=O)

Reliability & Maintenance Metrics

• Mean Time Between Critical Failure (MTBCF): ≥ 2,000 hours (T); ≥ 5,000 hours (O)

• Mean Time to Repair (MTTR): ≤ 30 minutes (T=O) (Includes troubleshooting, removing/replacing parts, and functional testing; excludes administrative or logistical delays)

• Mean Time to Restore System (MTTRS): ≤ 2 hours for unscheduled downing events (T=O)

• Maximum Time to Repair (MaxTTR): ≤ 1.5 hours to the 95th percentile (T=O)

Government Requests and Questions: Request vendors provide potential Commercial-Off-The- Shelf (COTS) system solutions which vendors believe fit the above criteria. Please provide formal responses to the tasks listed below. Address your capabilities to accomplish the tasks below and provide highlights of successful past experience on similar government contracts within the past 5 years.

1. Provide a brief description of your company’s expertise involving MATCT systems.

2. Describe your capability to provide a MATCT that meets the requirements described above.

3. Describe your existing systems that meet the requirements outlined above. Specifically, detail the physical footprint and load configuration demonstrating how the entire system is transportable via a single C-130.

4. Provide your assessment of the current Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) of the MATCT your company would provide per the DoD TRL and MRL Desk book.

5. Do you consider this requirement to be a commercial requirement? If yes, please review the definition of a commercial product (1-6) found in FAR 2.101 and provide a clear statement about which part of the definition is applicable and please provide supporting evidence for this.

6. Provide rough order magnitude cost and schedule for procurement of MATCT system.

7. Provide any additional information you consider relevant to providing a MATCT system.