Past performance Questionaire.doc
DOC document 45 KB Posted
- Attached to
- Steel-Toe Boots
- Solicitation number
- F3V5A21145A001
About this file
Past Performance Questionnaire - Please complete and return IAW FAR 52.212-1 and Addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AiT Steel Toe Boots
RFQ#F3V5A21145A001
PERFORMANCE QUESTIONNAIRE
Your assistance is requested in support of a source selection.
Please complete this Questionnaire and email: elias.johnson-saucier@sheppard.af.mil or send by facsimile [FAX 940-676-2178] to:
Elias A Johnson-Saucier, A1C, USAF Contract Specialist
Required Response Date: 04Nov11
When complete, the information on this form is SOURCE SELECTION SENSITIVE INFORMATION (41 U.S.C. 423) and shall be protected accordingly.
TO BE COMPLETED BY OFFEROR
| 1. CONTRACTOR NAME & ADDRESS: |
| 2. CONTRACT NO.: |
3. CONTRACT INITIATION DATE:
4. COMPLETION DATE:
5. CONTRACT VALUE (with options): $
6. TYPE OF CONTRACT:
7. DESCRIPTION OF CONTRACT REQUIREMENTS:
Please add a continuation page if additional space necessary.
TO BE COMPLETED BY EVALUATING ORGANIZATION REPRESENTATIVE
8. EVALUATION: a. EVALUATOR'S NAME, POSITION (Project Manager/ COR/ Other) AND ORGANIZATION:
b. EVALUATOR'S PHONE NUMBER: c. MONTHS PERFORMANCE MONITORED BY EVALUATOR:
Please circle the response code for each topic (A – G) that best reflects your experience with this contractor.
O = Outstanding
E = Excellent A = Adequate
M = Marginal P = Poor
N/O = Not Observed
A. Quality of Products and Services - Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., technical, professional, environmental, or safety and health standards).
O E A M P N/O
B. Performance – Assess the contractor’s performance as the primary contractor for the supply of boots.
A M P
C. Schedule – Assess the timeliness of contractor against the schedule of activities.
A M P
D. Technical Requirements – Assess the contractor’s ability to fulfill the technical requirements of the contract.
A M P
E. Warranty – Assess the contractor’s adherence to the warranty and timeliness of substitution.
A M P
F. Customer Satisfaction – Assess the contractor’s responsiveness to customer concerns and “user friendliness”.
A M P
G. Overall Assessment.
A M P
File details come from the government source that posted it. Updated .