Brand_Name_Justification.pdf

PDF 3 MB Posted

Attached to
RM Sec Locks
Solicitation number
F3UUAU9144AW03
Issued by

About this file

Please see attachments.

View the file

Other files

File Type Posted
COMBO_RM_Sec_Locks.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Single Source Justification (Simplified Acquisition)

Section A: General Contract Information

Contracting Activity: Purchase lock cores and cylinders to maintain and sustain existing locking systems for new base lodging facilities.

Purchase Request/ Identification Number:

ECES190334

Project/Program Name: Al UDeid AB - Qatar Estimated Contract Cost (including Options):

$62,671.00

Section B: Description of the Supplies/Services Required

500 @ 8EE7E8626 EURO Conversion Cylinders LESS CORE; 100 @ 3C7TC1626 7 Pin Cores: Type TC Keyway-UNCOMBINATED;

400 @ 1C7TC1626 7 Pin Cores: Type TC Keyway; 50 @ A23217 I/S RING CYL, 8E (73205570S); 50 @ A23411 O/S RING CYL, 8E (71148396S)

Section C: Justification for Soliciting from a Single Source

The EURO Conversion Cylinders, 7-Pin Cores with TC Keyway and Ring Cylinders are all components that complement/complete the Best EURO Cylinder set. These items are required to sustain the current locking system used in on base, until all dormitories are transitioned to a new locking system.

Section D: Efforts to Obtain Competition

Multiple vendors (KDL Hardware, Independent Hardware, IML Security) were contacted via GSA and responded that they can provide the requested parts.

Section E: Steps to Preclude Future Single Source Awards

Best Access holds the patent and specifications for the locking system used in the Al Udeid AB dormitories. Because our current locking systems in the dormitories are designed to European specifications, the Best EURO Conversion Cylinder Kit is our only option, if Best key cores remain the locking system of choice for the USAF, purchasing from retailers that carry Best Access items is our only option.

Section F: Contracting Officer's Determination

I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.

Date

18-Jun-2019

Typed Name and Rank/Grade of Contracting Officer

CLAYTON PETRIE, SrA/E-4

Signature of Contracting Officer

Single Source Justification (Simplified Acquisition) Page of Section A: General Contract Information Section B: Description of the Supplies/Services Required Section C: Justification for Soliciting from a Single Source Section D: Efforts to Obtain Competition Section E: Steps to Preclude Future Single Source Awards Section F: Contracting Officer's Determination I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.

9.0.0.2.20120627.2.874785

CurrentPage:
PageCount:
Contract_Activity: Purchase lock cores and cylinders to maintain and sustain existing locking systems for new base lodging facilities.
PR-ID_Number: ECES190334
Project_Name: Al UDeid AB - Qatar
Estimated_Cost: $62,671.00
TextField1:
Date: 18-Jun-2019
Name: CLAYTON PETRIE, SrA/E-4
Signature:

File details come from the government source that posted it.