Attachment_C_-_Microwave_SOW.pdf
PDF 22 KB Posted
- Attached to
- Microwaves
- Solicitation number
- F3P3AH6047AW02
About this file
Attachment C - Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 15_Combined_Synopsis_-__Amendment_01.docx | DOCX document | |
| Questions_and_Answers_for_RFQ_F3P3AH6047AW02.docx | DOCX document | |
| Attachment_B_-_Salient_Characteristics_F2M3CH6029AW07.xlsx | XLSX spreadsheet | |
| Attachment_A_-_Building_Addresses_F3P3AH6047AW02.docx | DOCX document | |
| Combined_Synopsis.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C
STATEMENT OF WORK FOR
MICROWAVES AT B394 AND B861
1. DESCRIPTION OF SERVICES. T h e Contractor shall provide services as required by this Statement of Work (SOW) to include: delivery, assembly removal and installation of microwaves into buildings 394 and 861west wing on JBSA Randolph AFB, TX. A total of 86 microwaves for building 394 permanent party personnel and 52 microwaves for building 861 technical training side. The buildings are occupied and require no demolition of existing furniture. All materials and accessories shall be installed in accordance with industry standards and manufacturer's recommendations.
2. LOCATION: Building number 394 is located at 525 C St. East and building number 861 is located at H Street West. Both sites are on JBSA Randolph AFB located in San Antonio, TX.
3. PROJECT DESCRIPTION:
This project requires the delivery, removal and installation into building 394 and B861 west wing is delivery and install, no removal:
a. The following items listed shall be delivered, assembled and installed in each room:
Item: Quantity:
Microwave 86 microwaves for 86 rooms in Bldg
52 microwaves for 52 rooms in Bldg
4. SITE DESCRIPTION: This project requires delivery, assembly, removal B394 and installation and testing of all microwaves for buildings 394 and 861. Elevator exists in building 394 3 story, but no elevator exists at building 861, stairs only, 2-story.
5. STORAGE AND PARKING:
No contractor storage is required for this project. Parking shall be in the vicinity of the job site.
6. PROJECT SCHEDULE: Contractor shall deliver and install the following:
a. Deliver and remove items on the assigned date:
Delivery Date: Item Quantity 30 September 2016 Microwave
(B394)
30 September 2016 Microwave (B861)
b. Old microwaves will be removed from Bldg 394 and placed in storage rooms on the 2nd and 3rd floors in the same building. A total of 86 new microwaves will be installed in Bldg
394. New microwaves will replace old ones.
c. No removals necessary for Bldg 861. Only delivery and installment of 52 new microwaves are necessary.
7. HOURS OF OPERATION: The delivery and installation shall be performed during normal duty hours (7:30 A M. to 4:00 P. M., Monday thru Friday).
8. WORKMANSHIP: The Contractor shall perform all operations in a manner that will result in a professional and expeditiously completed project. The work shall be in strict accordance with the prevailing industry standards.
9. ACCESSORIES AND INCIDENTALS: Contractor shall provide all incidentals necessary.
Cost for these items shall be included as part and parcel of the finished installation.
10. DEMOLITION: None is required.
11. INSTALLATION: The installation date shall be coordinated between the Contracting Officer, the end-user and the 502nd CES/CEIH.
12. SUBMITTALS: Provide product data on specified products
13. QUALITY ASSURANCE: The government shall inspect all work performed by the contractor. Work performance shall be deemed satisfactory and acceptable to the government when the 502nd CES/CEIH declares the project satisfactory.
14. CLEANUP: The Contractor shall collect all trash, debris, refuse, garbage, etc., which he generates and remove it from the site.
15. PROTECTION: The contractor shall take precautions to prevent damage to government property.
The contractor shall repair or replace damaged items at no additional cost to the government.
16. COMPLETION OF WORK: The contractor shall ensure that work for this project is performed in accordance with the criteria herein, and that all relevant materials, finishes, equipment, and systems shall be fully operational at the completion of work for this project.
17. ENVIRONMENTAL REQUIREMENTS: The contractor shall perform all work in accordance with federal, state, and local environmental regulations.
END OF STATEMENT OF WORK