Performance Work Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Evaluation_Criteria.pdf | ||
| 52.212-3.pdf | ||
| 252.209-7993.pdf | ||
| 5352.242-9000.pdf | ||
| 52.212-5.pdf | ||
| 52.252-2.pdf | ||
| 5352.201-9101.pdf | ||
| 5352.223-9001.pdf | ||
| 52.252-1.pdf | ||
| Addendum_52.212-1.pdf | ||
| 252.209-7001.pdf | ||
| Combined_Synopsis_ _Solicitation.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Premise Wiring of Building 709 First Floor
Warrior Preparation Center, Einsiedlerhof AS 10 July 2014
1.0 INTRODUCTION. This Performance Work Statement (PWS) defines the requirements for the Contractor to engineer, furnish, install and test (EFI&T) premise wiring for building 709 first floor SCIF to adequately support IP Data Network at Einsiedlerhof AS, GE.
Newly installed premise wiring will support NIPRNET, SIPRNET and High side Networks. Removal of existing outdated premise wiring is also required for this project.
2.0 TASKS AND REQUIREMENTS
2.1 General Requirements. The contractor shall provide all equipment, tools, supplies, transportation, supervision, management, and other incidentals necessary to EFI&T the requirements stated in this PWS.
2.2 Specific Installation Requirements. The purpose of this project is to install
NIPRNET, SIPRNET and High Side premise wiring connectivity for building 709, first floor SCIF at Einsiedlerhof AS, GE. Connectivity shall support approximately 53 SIPRNET (SC) fiber optic (FO) drops, 7 NIPR (LC) fiber optic (FO) drops and 53 High Side (ST) fiber optic (FO) drops. The contractor will resolve all vulnerabilities found, if possible. For those vulnerabilities that cannot be resolved, the contractor will provide the USAFE WPC/SCX a consolidated list of those vulnerabilities and the reason they could not be resolved.
2.2.1 Premise Wiring
Building 709, First Floor SCIF
Refer to sketches SK-RamsteinWPCB709FP01 for new data drop locations. There are a total of three floors in this building. The new equipment cabinets for the second floor shall be installed in the Communications (Comm) Room as indicated in the sketches.
Based on these requirements, a total of 113 LAN ports: 7 NIPRNET fiber drops, 53 High Side fiber drops, and 53 SIPRNET fiber drops, will be provided throughout the floor via multi-mode (MM) 50 um 2.8mm fiber cables. MM fiber optic patch panels are also needed to be installed in the comm room. Each MM fiber run will home run from the user location to the First Floor SCIF comm room. One 12 strands 50 um multi-mode and One 12 Strand Single mode fiber optic tie cable will be run from main comm room (DISTRO rack) on the first floor to the SCIF comm room. The tie multi-mode fiber optic cable runs shall be terminated to the multi/Single-mode ST fiber optic patch panels at both ends. ST patch panels for terminating tie cables at both ends comm room shall be located on the NIPRNET equipment cabinet. Tie cables horizontal run shall traverse on the NIPRNET cable tray. All cablings will be run above false ceiling or under the sub floor and supported by cable tray raceways cable management systems.
Fiber optic cables require no separation. All cable trays will need to be grounded to the building structure. Cable tray shall be supported with threaded rod or other hardware every 5 to 10 feet to a fix structure such as the true ceiling if possible. All fiber optic cables for data branch off from the main cable tray (above false ceiling or under floor) to the user locations will support by J hooks. From the false ceiling to the user location, Panduit or similar race way will be needed to run on the wall to support the fiber optic cable. MM fiber cable shall terminate to single or multi gang outlet box and faceplate (Keystone or other type). New fiber optic adapters also needed in each single multi gang outlet box (user end). Install single or multi gang outlet box on the wall approximately four feet above floor, if possible. The Contractor shall clean up all installation and construction related dust and debris from office furniture and equipment at the work site daily.
Existing cable tray may be reused or removed.
Remove all existing wood, plastic, metal raceways and outlet boxes on the wall in every room and in the hallway. Remove or reroute any and all existing power and signal cables required to accomplish this task.
Remove all unused cable of the existing drops in every room.
Run cable trays as required to support this project.
If necessary, new holes might need to be drilled above false ceiling and through walls to provide entrance for the cables from the cable tray located above false ceiling in the hall way to the various rooms. Contractor will be required to drill any new holes required to support this project.
There are three types of Data Networks (SIPRNET, High Side and NIPRNET).
SIPRNET data network requires red zipcord MM 50um 2.8mm fiber optic cables Duplex
SC type of connectors and adapters are also required for fiber termination.
High Side data network requires Yellow zipcord MM 50um 2.8mm fiber optic cables
Duplex ST type of connectors and adapters are also required for fiber termination.
NIPRNET data network requires Green zipcord MM 50um 2.8mm fiber optic cables
Duplex LC type of connectors and adapters are also required for fiber termination.
Terminate each type of network to a separate outlet box.
Use existing equipment cabinets to house the SIPRNET, High Side and NIPRNET patch panels.
2.2.2 Communications Closets
In the comm room, data circuit will run and terminate to the MM fiber patch panels via cable tray (6” to 12” wide) located and secured above each equipment cabinet or blow sub floor. All equipment cabinets in the comm room will be grounded and have side cable management. In addition, one horizontal cable management will also be provided for every two MM fiber patch panels. All Cables run between equipment cabinet will need to run on the cable tray above the equipment rack for cable management. Two to three feet clearance is required for front and back of all equipment cabinet for maintenance. Install patch panel start from the top of the equipment cabinet. Ensure all ports, data outlets and patch cables will be identified using local labeling schemes. If needed, up to 8 weeks of down time can be accommodated for this project.
Building telecommunications (telephone and LAN) distribution systems shall meet TIA/EIA-568-C, Commercial Building Telecommunications Cabling Standard;
TIA/EIA-569, Commercial Building Standards for Telecommunications Pathways and Spaces; TIA/EIA-606, Administrative Standard for the Telecommunications Infrastructure of Commercial Buildings; TIA/EIA-607, Commercial Building Grounding and Bonding Requirements for Telecommunications; and NSTISSAM Tempest/2-95 Note: Reuse equipment rack located in the comm room if possible.
Refer to floor plan drawing SK-RamsteinWPCB709FP01 for the location of the Communication room in building 709 SCIF.
2.2.3 Equipment Racks/Cabinet
If possible existing equipment racks will be used to support cable and equipment to be installed. All racks/cabinets shall be secured to the floor and grounded. Racks shall be deep enough to accommodate appropriate uninterruptible power supplies (UPSs). Cabinets with locking doors, fans and vents are required unless space requirements dictate rack installations. Install 1 dedicated 230 VAC 16A circuit to each equipment cabinet.
The Contractor shall install vertical and horizontal cable management for all installed equipment racks.
2.2.4 Installation shall adhere to Government standards for emission security (EMSEC). Contractor shall specify in the proposal how EMSEC requirements will be met. Installation shall be subject to a Government EMSEC inspection and certification before the system can process any classified information. See paragraph 3.4 for special drawing requirements.
2.2.5 Contractor shall include original manufacturer documentation for all hardware and provided under this contract.
2.3 Floor Plan: SK-RamsteinWPCB709FP01 is conceptual drawings that the Contractor may use as engineering aids.
2.4 Project Residue. All residues from this project shall be disposed of off base and
IAW Federal, State, local and base environmental laws and regulations. Prior to disposal of excess material, the contractor shall coordinate with base personnel to see what items they may want to retain.
3.0 DELIVERABLES
3.1 Required Deliverables. All deliverables are subject to Government acceptance and approval. They shall meet professional standards and the requirements set forth in this PWS. All deliverables shall be produced using recommended software tools/versions as accepted by the Government. The contractor shall deliver the required numbers and type of copies IAW the distribution list set forth below. Drawings shall be in Micro Station and/or Visio format.
DOCUMENTS BASE USAFE WPC
Test Plan N/A 1 EM Red Line Drawings 2 PC 1 CD
*CD = Compact DiSC *PC = Paper Copy *EM=Email
3.2 Installation Schedule and Implementation Flowchart. The installation Schedule shall cover the overall Schedule and milestone dates such as equipment delivery, installation start, testing start, etc. An implementation flowchart or Gantt chart shall be provided which indicates which critical tasks must be accomplished and in which particular order.
3.3 Test Plan
3.3.1 General. The test plan shall document in detail the contractor’s plan for conducting tests and analyzing the test results to show how the system, when fielded, will satisfy the requirements of the applicable design specification.
3.3.2 Format. The plan shall be in the contractor’s format.
3.3.3 Content
3.3.3.1 Title of the test to be conducted.
3.3.3.2 Identification of system being tested.
3.3.3.3 Contractor’s name.
3.3.4 Participation. Identifies the government and contractor participation roles and responsibilities.
3.3.5 Location. Identifies the facilities where the testing will be performed.
3.3.6 Master Test List. Lists all tests to be accomplished in the order they are to be performed. A separate listing for each location shall be provided.
Each listing shall include the following:
3.3.6.1 Test Description. Name and brief description of test to be performed.
3.3.6.2 Special Tests. Provides a list of special or unusual tests and examinations necessary to verify satisfactory equipment performance to specifications.
3.3.6.3 Test Objective. Describes the objective of each test performed, including the criteria, baseline, duration, and number of times each test should be performed.
3.3.6.3.1 Success/failure criteria
3.3.6.3.2 Baseline
3.3.6.3.3 Duration
3.3.6.3.4 Quantity of test
3.3.6.4 Test Equipment. List all equipment to be used in the test and identify as follows:
3.3.6.4.1 Description.
3.3.6.4.2 Nomenclature.
3.3.6.4.3 Serial number.
3.3.6.5 Approach. Describes the steps used to perform each test.
3.3.6.6 Validation Procedures. An overview of the procedures the contractor will use to validate the test results.
3.4 Drawings. Contractor shall be provided with floor plan drawings and shall red line them to show the locations of installed equipment. Contractor shall also develop rack elevation drawings to show the locations of equipment in racks. For any/all rooms, including communications rooms, that will have a classified processor, drawings shall include room dimensions and show the exact locations of all drops (distinguishing which ones are which including NIPRNET, SIPRNET and High Side ), telephones, STU's/STE', and any other electronic equipment. Drawings shall also include the organization name, the building number, and the date the drawing was accomplished.
4.0 TESTING (Also see Attachment 1)
4.1 The Contractor shall test and inspect all aspects of the installation to ensure the technical adequacy and accuracy of all work, including reports and other documents required in support of that work. The Contractor shall conduct on-site testing IAW OEM installation manuals and practices, and the appropriate vendor’s test procedures. The Contractor shall participate with the Government in testing the complete communications system end-to-end, which may include premise equipment, distribution systems or any additional telecommunications equipment or operating support systems identified in the PWS. When any system, subsystem, component or requirement test fails to meet the requirements of the test, Government acceptance and payment will be withheld until such time as the cause of the failure is corrected to the Government’s satisfaction. After appropriate corrective action has been taken, the Contractor shall repeat all previously-completed tests that related to the failed test, until all tests are completed satisfactorily.
Pre-cutover audits will determine if the system is ready for functional cutover, and will consist of Government verification of all Contractor test results. As part of this audit, the Contractor and the Government will review and agree on any engineering changes or approved waivers that apply to the installation. Post-cutover audits will verify that all post- cutover acceptance testing has been performed IAW standard practices and this PWS; it shall also identify those tests, if any, which have not been successfully completed. Any unsuccessful tests shall be re-accomplished prior to acceptance. Testing shall be performed in two steps: operational testing, then system acceptance testing. The Contractor shall provide a logical test process that minimizes interruptions and avoids sustained downtime and presents a contingency procedure to be implemented in the event of systems failure during testing.
4.2 The Contractor shall furnish all test equipment and personnel required to conduct all required testing. The contractor shall document all test results in a “Test Report(s)” and submit to the Government. During the any testing phase, the Government reserves the right to perform any of the Contractor-performed inspections and tests to ensure solutions conform to prescribed requirements. The Contractor shall provide on-site support during the acceptance testing. The Test Report(s) shall be provided to the Government no later than 10 days after test(s) have been completed.
5.0 CONTRACTOR FURNISHED MATERIALS. The Contractor shall supply Commercial- Off-the-Shelf (COTS) components for contract performance wherever possible.
The Contractor shall identify all materials or equipment required for the specific projects in this PWS, and shall list the manufacturer and part number of the proposed material in the proposal. Unless otherwise specified, the Contractor shall provide copies of existing COTS technical or equipment manuals and warranty documentation and procedures for Contractor-furnished end-item system equipment maintenance. The Contractor shall transfer warranties to the Government prior to invoicing.
6.0 PERFORMANCE
6.1 Period of Performance. The period of performance for this Task Order shall be 60 days from the date of award.
6.2 Place of Performance. The place of performance is USAFE/WPC Einsiedlerhof AS, GE.
6.3 Hours of Work. Contractor shall work during normal operating hours of 8:00 AM – 4:00PM, Monday through Friday, excluding federal holidays and site-specific down-days. If performance of work outside normal duty hours will be required to meet the scheduled dates stated in paragraph 6.1 above, coordinate the desired dates/times with the WPC technical advisors.
7.0 GOVERNMENT FURNISHED EQUIPMENT, INFORMATION, ACCESS AND
STANDARDS
7.1 The contractor shall specifically identify in their proposal any government resources required during the performance of this contract.
7.2 Government applicable documents and standards. The following documents are hereby incorporated by reference. The contractor shall comply with these documents during the performance of this contract:
NSTISSAM Tempest/2-95 National Security Telecommunications and Information Systems Security Advisory Memorandum (NSTISSAM) Red/Black Installation Guidelines AFSSI 7702 Emission Security Countermeasures Addendum 1 – Transmission Performance Specifications for 4-pair 100 Ohm Category 6 CablingANSI/EIA-310-D - Cabinets, Racks, Panels, and Associated Equipment NFPA 70 - (2008) National Electric Code TIA/EIA-568-C, Commercial Building Telecommunications Cabling Standard TIA/EIA-569-C, Commercial Building Standards for Telecommunications Pathways and Spaces TIA/EIA-606-A, Administrative Standard for the Telecommunications Infrastructure of Commercial Buildings ANSI-J-STD-607-A-2002 Commercial Building Grounding and Bonding Requirements for Telecommunications MIL-HDBK-1013/1A, Military Handbook, Design Guidelines for the Physical Security of Facilities, 15 December 1993.
MIL-HDBK-1013/8, Military Handbook, Combination Locks, 31 December 1989.
MIL-HDBK-1013/12, Military Handbook, Evaluation & Selection of Security Glazing Against Ballistic, Bomb, and Forced Entry, 10 March 1997.
The contractor shall obtain and comply with any other applicable manuals not identified above that would be required to meet industry standards.
7.3 Drawings
Drawing Notes Remark SK-RamsteinWPCB709FP01 USAFE WPC,GE
Building 709 1st Floor SCIF Propose Premise Wiring Floor Plan for NIPRNET/SIPRNET/High Side
Network
Attachment 2
8.0 SECURITY. The Contractor shall provide the USAFE/WPC with the name, social security number, driver’s license number and state of issue, and birth date of the personnel who will be performing on this contract a week in advance of arrival. This information is required to grant access to the USAFE/WPC Einsiedlerhof AS, GE.
9.0 ENVIRONMENTAL REQUIREMENTS
9.1 Conformance with Environmental Management Systems
The Contractor shall perform work under this contract consistent with the relevant environmental policy and objectives identified in the installation environmental management system (EMS) applicable for your contract. The Contractor shall perform work in a manner that conserves water, energy and other resources to the maximum extent feasible and ensure minimum production of waste as possible, giving preference to recycling and reutilization opportunities. Furthermore, the Contractor shall give preference to less toxic materials whenever available and still reliable for their work. In the event an environmental nonconformance or noncompliance of host nation and USAF environmental laws and regulations associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the EMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the environmental management system on base and how these requirements affect their work performed under this contract.
All on-site contractor personnel shall receive the installation EMS awareness level information.
9.2 Conformance with Environmental Requirements
The contractor shall perform all work in accordance with applicable German and US Air Force environmental laws, regulations and operating standards, including but not limited to the Final Governing Standards (FGS) for Germany. The contractor shall be immediately capable of understanding and addressing environmental laws and regulations as they pertain to work performed under this contract.
The FGS for Germany and other important environmental laws & requirements applicable for all contractors working on base can be provided upon request.
10.0 ADMINISTRATIVE CONSIDERATIONS
10.1 Points of Contact: USAFE WPC Network Engineer
10.2 Technical Exchange Meeting (TEM). The Contractor shall conduct a weekly telecon to review project and/or technical issues. The TEM provides a forum for the Government and Contractor to exchange information about the current project status, installation schedules, and known or expected problems. These meetings shall be coordinated with USAFE/WPC. A written agenda shall be provided to USAFE/WPC at least 48 hours prior to the meeting. The Contractor will maintain minutes of the TEM and related follow- on activities and distribute them to the attendees and other lead project members not in attendance. Locations shall be determined by USAFE/WPC and provided to the Contractor after contract award.
10.3 Enterprise-Wide Contractor Manpower Reporting Application (ECMRA)
10.3.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for premise wiring of buildings 707 and 708 at the Warrior Preparation Center. The contractor is required to completely fill-in all required data fields via a secure data collection site at the following web address: http://www.ecmra.mil
10.3.2 Report inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractor may direct questions to the ECMRA helpdesk.
11.0 LABELING. The Contractor shall provide an effective labeling and numbering scheme to ensure administration tasks are simplified, to include, moves, adds and changes can be carried out with little guesswork, unused capacity can be easily identified and failed components can easily and quickly be identified during troubleshooting and repair activities. All cables/outlets/patch panels shall be labeled appropriately IAW TIA/EIA-606-A. All cables/outlets shall be color-coded appropriately to differentiate between different networks. The Contractor shall coordinate with USAFE/WPC about the labeling and naming scheme. Below are examples of labeling and naming scheme for telecommunications outlets and their associated patch panels:
11.1 Telecommunications Outlet Labeling.
11.1.1 Two Position Wall Plate
ROOM Actual room number from the facility drawings at time of design.
TR 110
RACK 1
PATCH PANEL 1
PORT #s 1,2
TR 110
RACK 1
PATCH PANEL 1
STARTING PORT # 3,4
TR Actual TR or Equipment Room where the end of the wall plate cables terminate. In existing facilities with no Telecom Room (TR) numbers the TR room identifier shall be floor number, room number where room number starts with the letter A with additional TR labeled B, C etc.
RACK # Actual Rack number that contains the patch panel where the cable terminates.
PATCH PANEL # Actual patch panel number.
PORT #’s Actual port numbers in the patch panel
The bottom position of the wall plate shall be marked with the Room Number that the wall plate is installed. This information is reflected in the site cable plan.
Top Position Example:
110-1-1-1, 2
TR 110
Rack # 1 Patch Panel # 1 Port #’s 1,2 (On the patch panel)
Bottom Position Example:
32 = Room Number (Actual room # from the cable plan and facility drawings at time of design)
Top Position Example: (no comm. room identifier) 1A-1-1-1, 2 = TR 1A, Rack # 1, Patch Panel # 1, Port #’s 1,2 (On the patch panel)
Example of a Single Dual Data Outlet Located in room 32 and terminating in TR 110, Rack # 1, Patch Panel # 1 and starting in port # 1 of the patch panel.
110-1-1-1,2
A B DATA OUTLETS (Color Coded. Site Specific Colors may be used in lieu of standard colors)
A - Outlet - White B - Outlet - Blue
ROOM NUMBER (Actual room number from site
32 cable plan and facility drawings at time of network infrastructure site cable plan development.)
Example of a Second Dual Data Outlet Located in room 32 and terminating in TR 110, Rack # 1, Patch Panel # 1 and starting in port # 3 of the patch panel.
110-1-1-3,4
A B DATA OUTLETS (Color Coded. Site Specific Colors may be used in lieu of standard colors)
A - Outlet - White B - Outlet - Blue
ROOM NUMBER (Actual room number from site cable plan and facility drawings at time of network
32 infrastructure site cable plan development.)
Figure 1: Two-Position Wall Plate Numbering SCheme
11.2 Patch Panel Labeling
The following format is an example of patch panel labeling. Room number, face plate number, jack designator, 110-1 A B C D.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
110-1 A B C D
ATTACHMENT
1.0 Testing. The Contractor shall perform the following tests as applicable for all Contractor-installed wiring/cabling.
1.1 Pre-Installation Tests
Pre-installation tests shall be performed on-site prior to the installation of the equipment.
Where specified in the following paragraphs, a manufacturer's Certificate of Compliance (COC) may be provided to the government showing the specific test has been performed at the pre-installation testing and the item conforms to the requirements of this specification.
The COC shall not relieve the contractor of the responsibility to provide acceptable equipment. The minimum requirements for pre-installation testing are defined in the following paragraphs.
1.2 Electrical Tests
The contractor shall perform electrical tests using commercial standards on all existing and new cables as defined below. Tests shall be performed on multi- pair (metallic telephone cable) including SCreened cables, coaxial and twinaxial cables, housewire and riser cables.
1.2.1 Existing Multi-Pair Cable
The contractor shall perform electrical tests IAW T.O. 31W3-10-15 on existing multi-pair to determine the existing status of all pairs. The contractor shall not be responsible for correcting existing electrical faults; however, the designated government representative must be notified of any faults immediately upon identification. As a minimum, the tests shall check for opens, shorts, crosses, grounds, shield continuity and insulation resistance (insulation resistance on existing cables is accomplished on spare pairs only).
1.2.2 New Multi-Pair Cables
The contractor shall perform electrical tests IAW T.O. 31W3-10-15 on new reels of multi-pair cable. All multi-pair cable shall be 100 percent free from defects. The contractor may provide a COC to satisfy this requirement. Manufacturers reel identification tags shall not be removed from the reel, destroyed or otherwise rendered unreadable. These tags must be available for government inspection on-site. On-reel tags shall not be used as a COC.
1.2.3 Fiber Optic Tests
The contractor shall perform tests on all existing and new cables as defined below.
1.2.3.1 New Fiber Optic Cable
The contractor shall test all strands of all new fiber optic reels for discontinuities, attenuation and length of cable IAW commercial standard on the reel. The designated government representative shall be allowed to review the test reports prior to the installation of any fiber optic cable.
Manufacturers' on-reel tags shall be handled in the same manner as for metallic reels.
1.2.3.2 In-progress Tests
In-progress tests shall be conducted on a continual basis to ensure equipment is being properly configured and installed to satisfy the requirements of the contract.
1.2.3.3 Pre-cutover Tests
Upon completion of installation and in-progress tests, pre-cutover tests shall be accomplished to ensure the entire system is properly configured, the requirements of the task order have been met and the system is ready to cutover.
1.2.3.3.1 Electrical Tests
Electrical tests shall be accomplished IAW commercial standard to ensure the system is free from defects and all portions of the system are ready to be cutover.
1.2.3.3.2 Basic Parameter Tests
The contractor shall perform the following tests on all pairs including spares;
1.2.3.3.2.1 Cable Shield Continuity
Test to ensure the cable shield is continuous from the MDF/IDF to each distant termination point.
1.2.3.3.2.2 Basic Tests
Test to ensure the cable is free from opens, shorts, grounds, crosses, reverses, splits and Transpositions. These tests shall also prove the cable has been installed and configured IAW the approved installation plan.
1.2.3.3.2.3 DC Loop Resistance
Test to ensure the loop resistance of all installed pairs does not exceed the equipment limits.
1.2.3.3.2.4 Additional Required Tests
The following tests shall be accomplished on a minimum of three pairs from each 25 pair binder group within the cable.
1.2.3.3.2.4.1 Insulation Resistance
Pairs shall be tested IAW T.O. 31W3-10-15, paragraphs 2-17 & 2-36 to ensure the cable meets the minimum insulation resistance requirements.
1.2.3.3.2.4.2 Noise
Pairs shall be tested for impulse, metallic (noise to ground), and idle circuit noise.
1.2.3.3.2.4.3 Attenuation
Pairs shall be tested to ensure the cable does not exceed the maximum attenuation allowed.
1.2.3.3.2.5 Fiber Optic Tests
All strands of all fiber optic cables shall be tested. As a minimum, the following tests shall be performed.
1.2.3.3.2.5.1 Optical Attenuation
Tests shall be accomplished to ensure the installed cable is within the specified parameters. The bi-directional optical power meter method or equivalent shall be used to perform this test.
1.2.3.3.2.5.2 Optical Power Margin
System shall be tested to ensure the power margin (Power Budget), specified in the task order, is not exceeded.
1.2.3.3.2.5.3 Shields/Talk Pairs
When installed, shields and talk pairs shall be tested to ensure continuity, proper termination and grounding.
1.2.3.3.2.5.4 Distance
Test to determine the installed cable length between optical patch panels.
1.2.3.3.2.6 Grounding
All grounds shall be tested and shall conform to the requirements of this specification prior to being connected to the system.
Building 709, 1st Floor SCIF Rewire
File Name: SCIF Rewire
Edit Date: July 11 2014
Drawn By: WPC Pretty 0' 12' 20' 40'
Comms RoomSig Entry
Point
Power Input & Filters
Men's Restroom
Ladies Restroom
UV-RI W/4
HVAC
Equipment Room
Comm Room
Fiber connection from Rack in room 102 to
Rack in Room 110 via comm room
Raised Floor
No Raised Floor
NETWORK LEGEND KEY
Consists of 2 Network
Drops SIPR/HIGH Side
6 NIPR
53 SIPR
53 High Side
Comm Racks
Consists of 2 NIPR
Network Drops
| SK-RamsteinWPCB709FP01.pdf |
| SK-RamsteinWPCB709FP01.vsd |
| 709 1st Floor |