This Statement of Work outlines flooring replacement requirements for the 433 Weapons Squadron at Nellis Air Force Base, Nevada, specifically for Building 282's second floor. The contractor must remove existing flooring and install new materials including Mohawk First One Up II Carpet Squares (24" x 24") in yellow/orange areas, Dal Tile Esta Villa ceramic tile in green areas (matching first floor hallways), and Shaw Terrain II LVT in blue areas. The project excludes previously planned red areas.
The work must be performed Monday through Friday between 7:30 AM and 4:30 PM, with contractor responsible for furniture moving, damage prevention, and repairs. The contractor must provide material spec sheets before ordering, submit a written schedule for approval, and coordinate with the contracting officer for final inspection. The facility will provide storage space for up to two days' worth of materials. The contractor must designate a responsible person available within 1 hour during normal duty hours and 2 hours after hours to address any issues.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
433 Weapons Squadron (WPS)
Replace Flooring
DESCRIPTION OF SERVICES SPECIFIC TASKS
1. SCOPE OF WORK
1.1 The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary for the demo and installation of new flooring.
2. LOCATION
2.1 The project site is located at 433rd WPS, 4269 Tyndall Avenue, Bldg 282, Nellis Air Force
Base, Nevada 89191.
2.2 433 WPS is located on the 2nd floor and this facility has an elevator and two staircases.
3. DESCRIPTION OF WORK
3.1 Contractor shall remove and dispose of flooring materials and install new flooring located on the 2nd floor, as per drawing provided for bldg. 282:
As per the drawing all yellow and orange areas on the drawing shall be Mohawk First One Up II Carpet Squares 24” x 24”, square feet TBD during job walk to verify attached floor plan, per Nellis AFB Whole Building Design Guide/Standards, Color TBD, 4” Vinyl Cove Base.
As per drawing green area shall be ceramic tile, Dal Tile Esta Villa 18 x 18 Color EV99 Cottage Brown, Dal Tile Esta Villa 12 x 12 Color EV99 Cottage Brown, Pinwheel Pattern with 4” cove base Dail Tile Esta Villa Color EV99 Cottage Brown per Nellis AFB Whole Building Design Guide/Standards. Color and pattern to match the first floor hallways within Bldg. 282.
As per drawing blue area shall be Shaw Terrain II 20 Mil 2.5 mm 6 x 48 LVT, color TBD.
3.2 As per the drawing, the Green area hallways, shall match the existing floor covering on the
1st floor of bldg. 282 hallways.
3.3 As per the drawing, only the highlighted yellow, orange, green and blue areas are in the
SOW. Red area on drawing is now deleted out of the SOW.
3.4 A small area to store up two days’ worth of material will be provided by the facility.
3.5 The contractor shall provide spec/cut sheets for all items prior to ordering.
4. FACILITIES DAMAGE:
4.1 The contractor is responsible for furniture moving to demo and install carpet and ceramic floor tile. The Contractor shall be responsible for all damage to furniture, buildings, facilities and grounds, caused by his/her work forces or equipment, and shall repair said damages to the satisfaction of the Contracting Officer at no expense to the Government.
5. SCHEDULE
5.1 The Contractor shall prepare a written schedule of operation for all stages of work to be performed and shall submit it to the Contracting Officer for approval prior to work start.
6. WORKING HOURS
6.1 Working hours for the Contractor shall normally be between 07:30 am and 04:30 pm, Monday through Friday, excluding Federal holidays. If the Contractor desires to work during periods other than the above, he/she must identify by letter to the Contracting Officer at least five working days in advance of the dates desired and identify the work that will be accomplished if approval is given. The Contractor shall not be reimbursed for any changes or work accomplished outside the scope of the contract without prior approval by the Contracting Officer. In addition to the above, close coordination with the Government must be maintained.
7. FINAL INSPECTION
7.1 The Contractor shall notify 99 Contracting office for final inspection. All project documentation is required within 30 days of project acceptance, unless noted otherwise in the statement of work.
SECTION II
GENERAL INFORMATION
1. CONTRACTOR PERSONNEL REQUIREMENTS
1.1 The contractor shall provide the name of the responsible person who has full authority to act for the contractor on all matters relating to the performance of this contract. The name of this person or alternate(s) who shall act for the contractor when the responsible person is absent shall be designated in writing to the contracting office. The responsible person or alternate shall be available to discuss problem areas within 1 hour during normal duty hours and within 2 hours after normal duty hours. Normal duty hours for Nellis AFB are 07:30 am to 04:30 pm, Monday through Friday excluding Federal Holidays.
2. SAFETY
2.1 There are no identified hazards on the designated property. Should a hazard be identified, the government corrects OSHA hazards according to the base wide government developed and approved plans of abatement considering safety and health priorities. The fact that no conditions have been identified does not warrant or guarantee that hazards do not exist, or that work-around procedures will not be necessary. Compliance with the OSHA and other applicable laws regulations for the protection of employees is exclusively the obligation of the contractor. Further, the government will assume no liability or responsibility for the contractor’s compliance or non-compliance with such requirements.
Before any modification of the facilities other than regular maintenance performed by the contractor at his or her expense, the contractor must furnish the contracting officer documentation describing, in detail, the modification proposed. No major alterations to the facilities shall be made without the specific written coordination form the contracting officer. In the case of alterations necessary for compliance with the OSHA, such permission shall not be unreasonably withheld.
| STATEMENT OF WORK |
| 2. LOCATION |
| 3. DESCRIPTION OF WORK |
| 4. FACILITIES DAMAGE: |
| 5. SCHEDULE |
| 6. WORKING HOURS |
| 7. FINAL INSPECTION |