This document is a Statement of Work (SOW) for the installation of specialized storage tables and shelving solutions at the 65th Aggressor Aircrew Flight Equipment section in Building 1770A at Nellis Air Force Base, NV. The contractor shall provide all personnel, equipment, tools, materials, and supervision to install the specified cabinets, drawers, and butcher block tabletops in the inspection room and locker room areas. The contract also outlines requirements for security, work hours, utilities, waste disposal, and safety protocols.

The related federal contract opportunity is a Request for Quotation (RFQ) for the "65 AGRS Storage Cabinets" procurement, with a Solicitation Number of F3G1EA4240A001. This is a total small business set-aside under NAICS code 337127. The anticipated contract type is Firm Fixed Price, with a 90-day delivery requirement FOB Destination to Nellis AFB, NV. Quotes are due on September 24, 2024 at 10:00 AM PDT, and the evaluation will be based on the lowest-priced, technically acceptable offer.

View the file

Other files

File Type Posted
F3G1EA4240A001 - Q and A.pdf PDF
65 AGRS Storage Cabinets Solicitation.pdf PDF
Attachment 1 - SOW.pdf PDF
65 AGRS Storage Cabinets Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

65 AGRS BLDG 1770A

INSTALLATION OF SPECIALIZED STORAGE

TABLE AND SHELVING SOLUTIONS AT NELLIS AIR FORCE BASE

NELLIS AFB, NV

28 AUGUST, 2024

SECTION I – GENERAL REQUIREMENTS

PART 1 – GENERAL

1.1 STATEMENT OF WORK: The contractor shall provide all personnel, equipment, tools, materials, and supervision necessary to provide and install specialized cabinets and tabletops into the new 65th Aggressor Aircrew Flight Equipment section, building 1770A, Nellis AFB, NV: See Attachments. Equipment must be installed Monday - Thursday from 0800 -1600.

1.2 The contractor shall provide and install the following items in the 65th Aggressor Aircrew Flight Equipment section on Nellis, AFB, NV. The size of the main inspection room area is approximately 26.25’ L x 14’W. The locker room area is approximately 27’ L x 17.5’ W. Steel Cabinets and butcher block tabletops will be oriented along the back wall, in the right-side corner, and in the center of the main inspection room. The locker room will have a steel cabinet and butcher block tabletop unit in the center of the locker room area. Rendering of designs of the following items shall be submitted along with the quote for 65 AGRS CC final approval prior to PR award. The technical evaluation will be based off the attachments. The shelving and storage components outlined in this proposal will be designed specifically to maintain and store Pilot Flight Equipment (PFE), along with facilitating the inspection and maintenance of PFE. The proposed shelving and tables must meet weight load and durability requirements for the materials being stored and secured. The following is the proposed area intended for tables and cabinets at the 65 AGRS Aircrew Flight Equipment inspection area and locker room.

1.3 INSPECTION ROOM CABINET AND TABLETOP REQUIREMENTS:

CABINETS ALONG BACK WALL

QTY: [2] Butcher block tabletop, 60” x 24” -placed on top storage cabinets

QTY: [2] Cabinet consisting of:

- (1) Cabinet Housing, 34.3” W x 22.5” D x 39.4” H, Steel w/lock, Black

- (2) Drawer, 3-1/8” Usable Height, 440lb Capacity, 18 compartment layout

- (2) Drawer, 3-1/8” Usable Height, 440lb Capacity, 15 compartment layout

- (2) Drawer, 5-1/16” Usable Height, 440lb Capacity, 12 compartment layout

- (1) Drawer, 7-1/32” Usable Height, 440lb Capacity, 9 compartment layout

- Placed underneath butcher block tabletop

QTY: [2] Double Door Cabinet consisting of:

- (1) Cabinet Housing, 34.3” W x 22.5” D x 27.5” H, Steel w/lock, Black

- (1) Stacking Kit

- (4) Adjustable interior shelf, 30” width, 440 lb Capacity

- (2) Bottom Shelf, 30” width, 440 lb Capacity

- Placed underneath butcher block tabletop

QTY: [3] Cabinet consisting of:

- (1) Cabinet Housing, 28.3” W x 22.5” D x 33.5” H, Cabinet, Steel w/lock, Black

- (2) Drawer, 3-1/8” Usable Height, 440lb Capacity, 12 compartment layout

- (2) Drawer, 5-1/16” Usable Height, 440lb Capacity, 4 compartment layout

- (1) Drawer, 9” Usable Height, 440lb Capacity, 4 compartment layout

- placed underneath butcher block tabletop

QTY: [1] Steel frame with roll holder, 30” W x 36” H -Mounted on butcher block directly next to double door cabinets

CORNER WORK BENCH

QTY: [2] Butcher block tabletop, 60” x 24” -placed on top storage cabinets

1.6.2 Normal daytime working hours will be adhered to. Hours are 0800 to 1530 Monday through Thursday.

1.7 U.S. GOVERNMENT FURNISHED MATERIALS AND SERVICES: The

contractor shall be responsible for the receipt, unloading, security, and handling of all equipment and materials. The contractor shall coordinate proposed storage and staging areas with the USAF Project Engineer.

1.8 CONTRACTOR FURNISHED ITEMS AND SERVICES:

1.8.1 The contractor shall furnish all necessary supplies, parts, materials, equipment, products, tools, and any other items and services to perform all operations required by this statement of work.

1.8.2 The contractor shall provide a fully qualified on-site manager who shall be responsible for the performance of the work. The name of the person and all alternates shall be designated in writing to the Contracting Officer. The project manager shall have full authority to act for the contractor. The project manager shall be on-site during normal work hours.

1.8.3 The contractor shall certify in writing that all employees operating equipment are trained and qualified.

1.8.4 At all times when any performance of the work at any site is being conducted by any employee of the contractor or his subcontractor, the contractor shall have a representative present at the site who has the capability of receiving instructions in the English language, fluently speaks the English language, and who can explain the work operations to his workers in a language that they are capable of understanding. The USAF Contracting Officer shall have the right to determine whether the proposed representative has sufficient technical and lingual capabilities and the contractor shall immediately replace any individual not acceptable to the USAF Contracting Officer.

1.9 SECURITY:

1.9.1 The contractor shall follow existing security procedures and instructions applicable to Nellis AFB, NV.

1.9.2 The contractor shall be responsible for the physical security of all materials, supplies and equipment, including property that he is utilizing.

1.9.3 Pass Requirements:

1.9.3.1 The contractor is responsible for providing the USAF Contracting Officer with a list of company personnel that will be used to execute the contract. The list must contain the following information on each person:

- Name

- Nationality

- Identification Number

- Copy of civil ID or passport

- Copy of driver’s license for all vehicle operators

- The length of time or time period during which the Individual will require a pass.

1.9.3.2 The contractor is responsible for providing the USAF Contracting Officer with the descriptions of any vehicles to be used during the execution of the contract. The information on each vehicle must include:

- Make

- Model

- License Plate Model

- Year

- Color

1.9.3.3 The contractor will receive a pass request letter from USAF Contracting Officer upon award of the contract. The contractor will complete any information required for this letter and coordinate delivery according to 99th Security Forces Squadron protocols.

1.9.3.4 The contractor shall follow all applicable security instructions.

1.10 UTILITIES: All reasonable quantities of utilities will be made available to the contractor without charge except for bottled drinking water. The contractor must provide for the drinking needs of their employees.

1.11 DISPOSAL OF WASTE/EXCESS MATERIAL: Any waste or excess material resulting from any contract requirement shall be removed from the base daily.

1.12 ACCIDENT PREVENTION: The contractor shall comply with the following safety requirements while performing work under this contract:

1.12.1 Traffic Control Devices: The contractor will be responsible for signaling, lighting, and barricading the immediate work area.

1.12.2 All vehicles operated by the contractor will obey all traffic signs and laws while operating on the base.

1.12.3 Fire Prevention: The prevention of fire is imperative during construction projects. The contractor is responsible for enforcing fire safety in his work area.

1.12.3.1 The contractor shall always have serviceable fire extinguishers readily available.

Extinguishers shall be supplied by the contractor.

1.12.3.2 Smoking is prohibited inside buildings and within 15 meters (50 feet) of flammable and combustible liquids.

1.12.3.3 Burning of trash and rubbish at the construction site is strictly prohibited.

1.12.3.4 The contractor must not use gasoline or diesel fuel for cleansing parts or surfaces.

Flammable liquids shall be stored at least 15 meters (50 feet) from flame and heat sources.

1.12.3.5 Electrical extension cords may be used on a temporary basis to provide tools and equipment. Do not overload extension cords. Frayed or spliced extension cords are prohibited.

1.12.3.6 The contractor must report all fires to the fire department. Upon discovery of a fire, yell, “Fire! Fire! Fire!” and evacuate the area. Attempt to extinguish the fire only if it is safe to do so.

Go to the nearest phone and notify the fire department.

1.12.3.7 Work site inspections may be conducted by the fire department on a recurring basis to monitor the contractor’s fire safety program.

PART 2 – ENVIRONMENTAL PROTECTION

2.0 PROTECTION OF LAND RESOURCES: It is intended that land resources within the project boundaries of work performed under this contract be preserved in their present condition or be restored to a condition after completion of construction that will appear to be natural and not detract from the appearance of the project. Insofar as possible, the contractor shall confine his activities to areas defined by the plans and specifications. Any landscape features scarred or damaged by the contractor’s equipment or operations shall be restored as nearly as possible to its condition at the contractor’s expense. The USAF Contracting Officer will decide what method of restoration shall be used.

PART 3 – SPECIAL CONDITIONS

3.0 BASE REGULATIONS: The contractor shall conform to all base regulations, directives, and other requirements pertaining to security, safety, traffic, fire and personnel clearances.

3.0.1 If the contractor wishes to work outside normally established hours, he shall submit his request to the USAF Contracting Officer for approval. Furthermore, the contractor shall allow any satisfactory arrangements to be made by the USAF Contracting Officer.

3.0.2 The contractor shall stock and place materials and equipment only in areas specifically approved by the USAF Contracting Officer and Security Forces.

3.0.3 When notified by the USAF that a severe weather alert has been issued, the contractor shall immediately take necessary action to tie down and secure all materials on the job site that could become missiles as a result of strong surface winds, thunderstorms, etc. This requirement also includes all non-regular working periods.

3.0.4 The contractor shall be responsible for the covering of open bodied vehicles transporting any material likely to create air pollution or become debris while on base.

3.0.5 All materials and debris generated by this project shall be removed from the job site at the end of each work day and shall be removed from the base and disposed of by the contractor at the end of the job. Cleanup of the entire job site shall be accomplished in less than one week after project completion. It shall be the responsibility of the contractor to assure proper loading of all vehicles used for transport of material and wrapping, cardboard, etc. shall be placed in tightly closed metal containers for daily disposal. All cleanup activities shall be accomplished by the contractor at no additional cost to the USAF.

3.1 INSPECTIONS/QUALITY CONTROL

3.1.1 The contractor shall coordinate with the USAF Contracting Office five days prior to schedule contract completion date to allow scheduling of dates for final delivery inspection.

Contractor attendance at the final delivery inspection is mandatory.

SECTION II – TECHNICAL PROVISIONS

PART 1 – GENERAL

1.1 DESCRIPTION OF WORK: Contractor shall furnish all labor, equipment, and materials required to design the furniture layout, procure furniture and associated data and power connections, deliver furniture and assemble furniture. Office dimensions and furniture layout can be seen on attached drawings.

1.2 GOVERNMENT FURNISHED PROPERTY: None.

1.3 CONTRACTOR FURNISHED PROPERTY: Contractor shall provide all labor, materials, tools, and equipment required to fulfill the requirements of the contract.

1.4 SUBMITTALS: The contractor shall submit detailed information for the following items.

Procurement shall not be permitted until all submittals have been approved. The contractor shall supply warranty letters for all appliances and fixtures, including the company name, point of contact and phone numbers.

PART 2 – STANDARD SPECIFICATIONS

2.0 LAYOUT: Contractor shall ensure that the layout is compliant with all applicable Occupational Health and Safety Administration standards. The contractor shall follow the principles outlined in Standard Facility Requirements, as published on 14 Aug 2018, for space planning.

PART 3 – EXECUTION

3.1 WORKMANSHIP: All work will meet the specified standards and be performed by craftsmen skilled in the applicable trade. No careless, sloppy work will be permitted. Any problems in the workmanship in any phase of the project will be indicated by the government; it is then the contractor’s responsibility to correct all material and workmanship defects, at no cost to the United State Government.

3.2 SITE PREPARATION: The contractor is responsible for preparing the site prior to the start of installation. Any damage inflicted to a utility will be repaired by the contractor with no cost to the United States Government.

3.3 GOVERNMENT INSTALLED ITEMS: None.

3.4 SCHEDULE: The contractor shall furnish a delivery schedule for approval 3 workdays in advance of the actual delivery to contracting officer and project manager. Contractor shall notify the contracting officer of changes to the schedule 2 workdays in advance of the scheduled day concerned.

4.0 ACCEPTANCE: The contractor shall perform tests on all systems to ensure each is Installed properly.

ATTACHMENT 1

65th AGRS AIRCREW FLIGHT EQUIPMENT SECTION LAYOUT

ATTACHMENT 2

BACK WALL CABINETS AND TABLETOPS

ATTACHMENT 3

LOCKER ROOM CABINETS AND TABLETOPS

ATTACHMENT 4

INSPECTION ROOM CENTER CABINETS AND TABLETOPS

ATTACHMENT 5

INSPECTION ROOM CORNER CABINETS AND TABLETOPS

Right side

Left Side