Questions and Answers.pdf
PDF 81 KB Posted
- Attached to
- Waterous CPK-5 Fire Pump Replacement
- Solicitation number
- F3C3L34149AW01
About this file
This document contains Questions and Answers related to Solicitation #F3C3L34149AW01 for a Waterous CPK-5 fire pump replacement at Minot AFB, ND. The key details are:
The solicitation is for the 5th Logistics Readiness Squadron of the Department of the Air Force Global Strike Command to procure a replacement CPK-5 fire pump. The questions and answers clarify that the pump should be 24V and the agency does not require an oil pump or cooler. The document does not provide additional details on the specific products or services required, response/award dates, pricing terms, set asides, or other salient information. This appears to be a Q&A document rather than a full solicitation package.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5 LRS-Fire Pump Price List.xlsx | XLSX spreadsheet | |
| Waterous CPK-5-Salient Characteristic.pdf | ||
| Waterous Water Pump -Combo-Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers- Solicitation #F3C3L34149AW01
12 July 2024
1. Q: According to this s/n this is a 24V is that correct?
A: The Serial Number 156882 was shipped as 24V
2. Q: This pump was not built with an oil cooler, it was put on by the OEM, did you need an oil cooler also?
A: Our primary concern is the CPK-5 pump itself. If the pump is only sold with the transmission splined to it, that is fine too, but not necessary. It doesn't make a difference in the long run. We also do NOT need the oil pump and cooler.