Armory Storage Lift Q and A part 2.docx
DOCX document 626 KB Posted
- Attached to
- Armory M4 Weapons Storage
- Solicitation number
- F3C3L34045AW01
About this file
This document is a set of questions and answers related to a federal contract opportunity for the purchase and installation of 3 Vertical Lift Modules to support the Armory M4 Weapons Storage requirement.
The key details are:
- The 480V electrical panel is located within 50 feet of where the lift units will be installed, with existing holes drilled to allow power to be fed to the room where the lifts will be placed.
- As-built drawings of the building were previously provided in the Statement of Work.
- There should be room on the existing 480V breaker panel to accommodate the lift units.
- The 480V panel is located in a separate mechanical room, with power able to be run through pre-existing holes between the two spaces.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW-Minot AFB Building 777 Armory Storage Install_.docx | DOCX document | |
| Armory Storage Lift Q and A - 02 July 2024.docx | DOCX document | |
| Minot Combined Synopsis Solicitation 20240604.pdf | ||
| SOW-Minot AFB Building 777 Armory Storage Install_20240424.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION 01: What are the as-builts on building?
RESPONSE: If the “as-builts” is referring to a blueprint of the building one was submitted in the statement of work.
QUESTION 02: Is there space for breakers in the existing electrical panels?
RESPONSE: There should be room on the existing 480v breaker. Below are pictures of the 480v panel. Pictures of the room itself have been omitted since the lifts will be in the weapon control room.
QUESTION 3: How far away is electrical panel that will need to be tied into?
RESPONSE: The 480v panel is located within 50 feet of where the units will be installed.
QUESTION 4: Is the panel in the same room as where the lifts will be?
RESPONSE: The panel is in our mech room, which is separated by 2 different walls, pre-existing holes have been drilled for the computer in the room where the lifts will be, and a power cable can be fed through both walls.