P20AC00364 GLKN SMM Notice of Intent To Award_Diatoms_and_WaterChem.pdf

PDF 471 KB Posted

Attached to
GLNF CESU: Diatoms and Water Quality in Great Lakes National Parks- GLKN
Opportunity number
NPS-NOIP20AC00364
Issued by

About this file

Notice of Intent

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL PARK SERVICE

FINANCIAL ASSISTANCE: NOTICE OF INTENT TO AWARD

This announcement is not a request for applications.

This announcement is to provide public notice of the National Park Service’s intention to award financial assistance for the following project activities. Refer to Section 2. Grants.gov Posting Determination.

ABSTRACT

Grants.gov Opportunity Number Project Title Recipient Anticipated Federal Funding Non-Federal Cost Share Total Anticipated Award Amount

Award Instrument

Anticipated Period of Performance

Legal Authority

CFDA # and Title

Single Source Justification Criteria

National Park Service Point of Contact

PROJECT GOALS AND OBJECTIVES

STATEMENT OF PUBLIC PURPOSE

Section 1. Project Summary

Task Agreement Cooperative Agreement

Grant Agreement

#2 - Continuation, #4 - Unique qualifications

STATEMENT OF WORK SUMMARY

RESPONSIBILITIES OF THE PARTIES

A. The recipient shall be responsible for the following items under this agreement:

B. The NPS Responsibilities:

A task agreement is proposed;

A cooperative agreement is proposed;

therefore substantial involvement by NPS is anticipated during the period of performance of this agreement. In support of this agreement NPS will:

A grant agreement is proposed, therefore no substantial involvement on the part of the NPS is anticipated for the successful completion of the statement of work. It is anticipated that involvement will be limited to actions related to monitoring project performance and technical assistance at the request of the recipient.

Section 3. Single Source Justification

NATIONAL PARK SERVICE

SINGLE SOURCE POLICY REQUIREMENTS

National Park Service Policy FAP&P 1443-2015-06 requires a written justification which explains why competition is not practicable. The justification must address one of the following criteria.

In order for an assistance award to be made without competition, the award must satisfy one or more of the following criteria:

(1) Unsolicited Proposal – The proposed award is the result of an unsolicited assistance application which represents a unique or innovative idea, method, or approach which is not the subject of a current or planned contract or assistance award, but which is deemed advantageous to the program objectives. The unsolicited proposal must demonstrate an innovative capability or concept not currently available to the government, and prepared without Government involvement. ;

(2) Continuation – The activity to be funded is necessary to the satisfactory completion of, or is a continuation of, an activity presently being funded, for which competition would have a significant adverse effect on the continuity or completion of the activity;

(3) Legislative intent – The language in the applicable authorizing legislation or legislative history clearly indicates Congress’ intent to restrict the award to a particular recipient of purpose;

(4) Unique Qualifications – The applicant is uniquely qualified to perform the activity based upon a variety of demonstrable factors such as location, property ownership, voluntary support capacity, technical expertise, or other such unique qualifications. Successful past performance, familiarity with existing requirements, capabilities that can be obtained or matched by a competitor, or a positive reputation, are not considered to be unique qualifications.

(5) Emergencies – Program/award where there is insufficient time available (due to a compelling and unusual urgency, or substantial danger to health or safety) for adequate competitive procedures to be followed.

NPS did not solicit full and open competition for this award based the following criteria:

Task Agreement issued under previously competed or single source master cooperative agreement per Section 2 above. Single Source Justification not applicable.

Continuation

Unique Qualifications

Unsolicited Proposal

Legislative Intent

Explanation of the proposed recipient’s qualifications or the criteria of the proposed project which requires use of the single source criteria cited.

Section 2. Grants.gov Posting Determination

Emergency

The National Park Service intends to award a task agreement under a previously competed or single source justified award.

The National Park Service intends to award a single source justified cooperative agreement. Refer to Section 3 Single Source Justification.

The National Park Service intends to award a single source justified grant agreement. Refer to Section 3 Single Source Justification.

Section 4. Department of the Interior Secretary’s Priorities

This award will support the following DOI Secretary priority(ies):

Other Key Initiatives:

Employment of veterans.

Supporting DOI Infrastructure needs.

Creating jobs in the American economy.

Access to outdoor recreation opportunities.

Priority 1: Creating a conservation stewardship legacy second only to Teddy Roosevelt Utilize science to identify best practices to manage land and water resources and adapt to changes in the environment.

Examine land use planning process and land use designations that govern public use and access.

Revise and streamline the environmental and regulatory review process while maintaining environmental standards.

Review DOI water storage, transportation, and distribution systems to identify opportunities to resolve conflicts and expand capacity.

Foster relationships with conservation organizations advocating for balanced stewardship and use of public lands.

Identify and implement initiatives to expand access to DOI lands for hunting and fishing.

Shift the balance towards providing greater public access to public lands over restrictions to access.

Priority 2: Utilizing our natural resources Ensure American energy is available to meet our security and economic needs.

Ensure access to mineral resources, especially the critical and rare earth minerals.

Refocus timber programs to embrace the entire 'healthy forests' lifecycle.

Manage competition for grazing resources.

Priority 3: Restoring trust with local communities Be a better neighbor with those closest to our resources by improving dialogue and relationships with persons and entities bordering our lands.

Expand the lines of communication with Governors, state natural resource offices, Fish and Wildlife offices, water authorities, county commissioners, Tribes, and local communities.

Priority 4: Ensuring sovereignty means something Support tribal self-determination, self-governance, and sovereignty.

Solidify mutual interests between the U.S. and the freely associated states and territories.

Priority 5: Generating additional revenues to support DOI & National interests Ensure that the public receives the full market value for the natural resources produced on Federal lands.

Ensure that fees or costs levied for DOI services are reasonable and targeted to achieve cost recovery.

Consider the impact of DOI decisions on economic development and job creation.

Priority 6: Protecting our people and the border Actively support efforts to secure our southern border.

Ensure DOI law enforcement staffing addresses public safety risks anticipated on DOI land.

Promote a "public service" demeanor within our law enforcement community.

Priority 7: Striking a regulatory balance

Reduce the administrative and regulatory burden imposed on U.S.

industry and the public.

Ensure that Endangered Species Act decisions are based on strong science and thorough analysis.

Priority 8: Modernizing our infrastructure Support the White House Public/Private Partnership Initiative to modernize U.S. infrastructure.

Remove impediments to infrastructure development and facilitate private sector efforts to construct infrastructure projects serving American needs.

Prioritize DOI infrastructure needs to highlight:

1. Construction of infrastructure;

2. Cyclical maintenance;

3. Deferred maintenance.

Senior executives are expected to provide leadership in achieving goals of the President and the Secretary.

The Management Team is expected to:

1. Ensure cost-effective operations and quality service to the public;

2. Facilitate organizational cooperation and conflict resolution;

3. Ensure the workplace environment is conducive to employee productivity and safety;

4. Hold individuals accountable for actions that violate DOI policies and requirements.

Priority 10: Achieving our goals and leading our team forward

The proposed project does not support any of the DOI Secretary priorities, but the project is being funded for the following reasons:

Priority 9: Reorganizing for the next 100 years

Improve alignment and integration of the DOI organizational structure. Redistribute organizational resources (people and funding) to enhance mission achievement and improved public service.

Improve organizational alignment with Executive Branch counterparts with major land management assets or influence.

PROJECT GOALS AND OBJECTIVES
STATEMENT OF PUBLIC PURPOSE OF SUPPORT OR STIMULATION IN COMPLIANCE WITH LEGAL AUTHORITY
PROJECT OVERVIEW
Grant:
gov number: NPS-NOIP20AC00364
Title: GLNF-CESU: Diatoms and Water Quality in GLKN parks
Funding: $36,803.00
Cost share: 0.00
Total funding: $195,393.00
POP: April 1, 2020 through September 30, 2025
Authority: 54 USC §101702(b):Cooperative Agreements, Cooperative Research and Training Programs
CFDA: 15.945 Cooperative Research and Training Programs- Resources of the National Park System
SS:
POC: Noël A. Miller, Lead Grants Management Specialist, 402-661-1658 noel_miller@nps.gov
Goals: Analysis of diatoms in lake sediments is a powerful tool to detect environmental change, or to place modern conditions in a regional and historical context. Interpreting diatom data depends on accurate environmental measurements including amounts of nutrients and chlorophyll. Objective - identify diatoms collected from lake sediment and analyze water samples for nutrients and chlorophyll.
PP: 1) The project engages recipients, partners, communities, and/or visitors in shared environmental stewardship.

2) The scientific community and/or researchers external to NPS gains by new knowledge provided through research and related results dissemination of natural, cultural and/or historical resource information.

3) The project assists in the creation, promotion, facilitation, and/or improvement of the public’s understanding of natural, cultural, historic, recreational and other aspects of areas such as ecological conservation areas, and state and local parks.

Overview: In accordance with established GLKN monitoring protocols, the Science Museum of Minnesota will identify diatom species in sediment samples, upload diatom data to the online database Neotoma, analyze nutrient and chlorophyll levels in water samples, and interpret and report results. The Great Lakes Inventory and Monitoring Network, in cooperation with park staff, will collect sediment and water samples, provide additional water chemistry data to the Science Museum of Minnesota, acquire necessary permits, and collaborate on data analysis and report writing.
Recipient: Science Museum of Minnesota
Sub Involv: 1. Assign Great Lakes Inventory and Monitoring Network (GLKN) Aquatic Ecologist David VanderMeulen as the NPS Principle Investigator.

2. Collect surface sediment from approximately 10 lakes per year. A line-operated gravity corer will be used to collect the upper 0-2 cm of sediment, separated into 0-1 cm and 1-2 cm subsamples according to Ramstack et al. (2019), for an integrated assessment of lake conditions during the past 1-5 years. Collection will occur at previously located sites (via GPS) at the central depositional basin in each lake.

3. Collect water samples. Field collection of water samples will follow the protocols according to Elias et al. (2015) for lakes and Magdalene et al. (2016) for rivers. All supplies (field equipment, bottles, chain of custody forms, coolers) will be provided by GLKN. Samples will be preserved appropriately according to methods agreed upon by SCWRS and GLKN and sent to SCWRS for analysis.

4. Manage water quality data and associated metadata. GLKN will ensure that water quality data and associated metadata from the project are entered into the U.S. Environmental Protection Agency’s Water Quality Data Portal.

5. Acquire permits. GLKN will acquire all necessary park permits to conduct the field work.

6. Prepare reports. GLKN will prepare annual park briefs according the internal guidelines and submit Investigator’s Annual Reports to the online NPS database.

Justification: #2) This would represent a continuation of diatom and water chemistry analysis and reporting. The Science Museum of Minnesota has proprietary datasets related to diatom monitoring that are used to infer past lake water quality conditions. These datasets would not be available if the proposed project is awarded to some other recipient, which would have a significant adverse effect on our diatom monitoring program. #4) The Science Museum of Minnesota has unique experience in identifying diatoms collected in lake sediments of the upper Midwest and importing diatom data to the online database Neotoma funded by the National Science Foundation. They are also uniquely qualified to analyze nutrient and chlorophyll a samples to very low detection limits, both of which are critical for correct interpretation of data under GLKN's Inland Lakes and Diatom monitoring protocols.
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Yes
Check Box27: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box39: Off
Check Box40: Off
Check Box41: Off
Check Box44: Off
Check Box45: Off
Check Box46: Off
Check Box47: Off
Check Box48: Off
Check Box49: Off
Check Box50: Off
Check Box51: Off
Check Box52: Off
Check Box53: Off
Check Box54: Off
Check Box55: Off
Check Box56: Off
Check: Choice 2
CheckA: Choice 4
NA:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Responsibilities: 1. Appoint Dr. Mark Edlund, senior scientist from the SCWRS, a field station of the Science Museum of Minnesota, as the principal investigator for administering this work.

2. Analyze and provide results for water samples provided by the National Park Service. Parameters to be analyzed include total phosphorus, total nitrogen, nitrate+nitrite nitrogem, ammonium nitrogen, and chlorophyll a, with approximately ~200 samples for each parameter annually. Results will include detection limits, reporting limits, QAQC report, and any appropriate data flags (with corresponding explanation). Maximum (lower) detection limits and methods will be as follows:

(Analyte, lower detection limit, Method) TP, 5 µg/L, Alkaline Persulfate Digestion TN, 15 µg/L, Alkaline Persulfate Digestion NO3+NO2-N, 3 µg/L, 4500 -NH3(F) NH4-N, 5 µg/L, 4500 -NH3(F) Chlorophyll-a, 1 µg/L, 445: In-Vitro Determination of Chlorophyll

3. Analyze diatoms from lake surface sediments. Samples will be collected from approximately 10 lakes per year. Diatom samples will be prepared and counted as described in Ramstack et al. (2019) for surface sediment samples. From each sample a lake-specific inventory of diatom species richness and relative abundance will be assembled. Transfer functions created from existing diatom calibration models will be applied to the relative abundance data to reconstruct environmental variables of interest.

4. Analyze quality assurance/quality control samples for diatoms according to Ramstack et al. (2019).

5. Upload all diatom data to the online Neotoma database.

File details come from the government source that posted it.