Hurst Tools Statement of Need.docx

DOCX document 18 KB Posted

Attached to
Hurst Rescue Tools
Solicitation number
F2Z3C84136AW05
Issued by

About this file

This document is a Statement of Need for Hurst Rescue Tools required by the 22nd Civil Engineering Squadron at McConnell Air Force Base in Kansas. The 22nd CES/CEF requires 1 each of a Hurst SP 555 E3 Spreader and a Hurst S 789 E3 Cutter for auto extrication. The contractor shall provide the specified equipment, which must include 2 batteries and 1 charger per tool, and shall provide a minimum 1-year warranty to cover any defects not caused by government damage or misuse. Delivery of each line item is required within 60 calendar days of the order.

This Statement of Need is related to a Pre-Solicitation Sources Sought announcement from the 22nd Contracting Squadron seeking qualified firms capable of providing the required Hurst Rescue Tools. Responses to this Sources Sought will be used for market research and planning purposes only, and will not result in a contract award. Respondents should not submit pricing information, and the government will not compensate for any costs associated with responding.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

21 June 2024

Statement of Need

Hurst Tools

McConnell AFB, Kansas

1. Overview

1.1 The 22nd CES/CEF requires 1 each of a Hurst SP 555 E3 Spreader and a Hurst S 789 E3 Cutter for auto extrication.

2. Description

2.1 The contractor shall provide 1 Hurst SP 555 E3 Spreader

2.1.1 The spreaders must come with 2 9AH Batteries and 1 110V Charger.

2.2 The contractor shall provide 1 Hurst S 789 E3 Cutter

2.2.1 The Cutters must come with 2 9AH Batteries and 1 110V Charger.

3. Warranty

3.1 The contractor shall provide a minimum of 1 year warranty for each headset. Any defect that is not caused by government damage or misuse shall be replaced by the contractor at no cost to the government.

4. Delivery

4.1 The contractor shall complete delivery of each line item no later than 60 calendar days after receipt of the order.