SoN AGE Tow Tractor.pdf
PDF 108 KB Posted
- Attached to
- PKA - AGE Tow Tractor - McConnell AFB
- Solicitation number
- F2Z2954043AW11
About this file
This document is a Statement of Need (SON) for an AGE Towing Tractor required by the 22nd Maintenance Group (MXG) at McConnell Air Force Base in Kansas. The SON outlines the technical requirements for the tractor, including battery options, drive system, top speed, ground clearance, towing capacity, size, and safety features. The contractor shall provide a minimum 1-year warranty and complete delivery within 180 days of the order.
The related federal contract opportunity is a pre-solicitation for the AGE Tow Tractor, issued by the Department of the Air Force Air Mobility Command. The pre-solicitation announces the government's intent to procure 1 AGE Towing Tractor and directs interested parties to the attached SON document for the detailed requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought - AGE Tow Tractor .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24 April 2024
Statement of Need
AGE Tow Tractor
McConnell AFB, Kansas
1. Overview
1.1 The 22nd MXG requires 1 each AGE Towing Tractor for use in the AGE Shop.
2. Requirements
2.1 -Batery op�ons - 36 or greater kWh -Drive system type - Double reduc�on heavy duty, Li-Ion batery powered -Top speed - 13 mph (21 km/h) -Final drive - Electric Drive w/Reduc�on -Ground clearance - 6.5 in (16.5 cm) -Hitch towing ra�ng - 30,000-60,000 lb (14,000-27,000 kg) Pintle Hitch must be installed front and rear -Overall vehicle size - 113 x 55 x 61 in (287 x 140 x 155 cm) -Person capacity - 2-person -Wheelbase - 58 in (147.3 cm) -Safety Alarm – Reverse Alarm, can be modifica�on -Instrumenta�on - BDI, Park Brake Indicator, System Readiness Indicator -Ligh�ng - Dual LED Head Lights, LED Brake/Tail Lights & LED Reverse Lights, LED Marker Lights
3. Warranty
3.1 The contractor shall provide a minimum of 1 Year. Any defect that is not caused by government damage or misuse shall be replaced by the contractor at no cost to the government.
4. Delivery
4.1 The contractor shall complete delivery of each line item no later than 180 days a�er receipt of the order.
File details come from the government source that posted it. Updated .