This document is a Construction Cost Estimate Breakdown for the PNQS 24-3706 Repair Sewer Lines project at Maxwell Air Force Base. The project involves repairing sewer lines for Buildings 677/678, 803, and 836. The estimate provides a detailed breakdown of material, labor, and other costs for excavation, pipe replacement, and site restoration work.

The related federal contract opportunity, Solicitation Number F2X3CE4115A003, is for the PNQS 24-3706 Repair Sewer Lines project. A site visit is scheduled for June 11, 2024, and all pertinent questions must be submitted by June 13, 2024. Responses to the solicitation are due by June 19, 2024. The contracting agency is the Department of the Air Force Air Education and Training Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193

CONTRACTORDATEADDRESS400 Cannon Street
Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Sewer Repair Multi Buildings 677/678, 803, and 836$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBER/WORK ORDERWORK LOCATION
PNQS 24-3706Maxwell AFB
UNITMATERIAL/EQUIP. COSTSLABOR RATESOTHER
LINEITEMOFQUANTITYAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Mobilization
SuperintendentLS$0.00$0.00$0.00
Pump Rental/operationWK$0.00$0.00
DIVISION 2 (Site Work)$0.00
Building 677
ExcavationCY$0.00$0.00$0.00
BackfillCY$0.00$0.00$0.00
Remove Pipe and Dispose off base.LF$0.00$0.00$0.00
Pipe BeddingTon$0.00$0.00$0.00
Replace Pipe: Gravity Sewer Pipe (Gasketed 15 IN)LF$0.00$0.00$0.00
Site ResoreLS$0.00$0.00$0.00
PavementLS$0.00$0.00$0.00
$0.00$0.00$0.00
Building 836 Sewer Repair$0.00$0.00$0.00
Replace Pipe Segments (Not under slab)LF$0.00$0.00$0.00
Replace Pipe Segments (Under Slab)LF$0.00$0.00$0.00
Temporary Latrine (1 Male, 1 Female)$0.00$0.00
Building 803 Sewer Repair$0.00$0.00$0.00
Camera InspectionLS$0.00$0.00$0.00
Pipe Excavation/Removal Old PipeLS$0.00$0.00$0.00
Replace Pipe SegmentLF$0.00$0.00$0.00
Replace Manhole S-307LS$0.00$0.00$0.00
$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
Material Costs$0.00$0.00
Tax on Materials10%$0.00$0.00
TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
Labor Cost$0.00$0.00
Insurance & Tax on Labor20%$0.00$0.00
TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Total Material, Labor, Tax & Insurance$0.00$0.00
TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
Overhead10%$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00
Profit10%$0.00$0.00$0.00
Sub Total$0.00$0.00
TOTAL$0.00$0.00$0.00
Bonds2.5%$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00$0.00
I acknowledge the above cost estimate has been estimated to the best of my ability and means.
PM_______________________________________________Signature: ______________________________________Date:____________________