Vendor_Questions_ _Answers.pdf

PDF 96 KB Posted

Attached to
Audio/Video Upgrade
Solicitation number
F2V4FM5009AW01
Issued by

View the file

Other files

File Type Posted
Statement_of_Work_(June_19 _2015).pdf PDF
Base_Pass_required_Info.xlsx XLSX spreadsheet
Statement_of_Work.docx DOCX document
DFARS_252.209-7992.pdf PDF
Salient_Characteristics.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No.

Vendor Questions for F2V4FM5009AW01, Audio/Video

Requirement

1 During the site survey, only (1) video/audio source into the system was discussed (a single government furnished computer). Is this correct and if not, what additional audio/video sources will be integrated into this system?

Answer: A single government computer will be provided, however this will not be the “only” video source into the system. They system should provide input for up to 4 video and audio sources to include HDMI and VGA from a laptop, and analog TV signal.

2 Will the government be furnishing the monitor, keyboard and mouse for the single GFE computer? If not, please relay the technical requirements for these items.

Answer: The government will be providing the monitor, keyboard and mouse for GFE computer.

3 What is the video connection type on the GFE computer (HDMI, DVI, Display Port)?

Answer: The video display output on the computer will be configured as required.

4 Does the GFE computer have more than (1) video output port?

Answer: The GFE computer may have more than one video output if required.

5 Will an integrated handheld microphone mount be required on the existing podium? If so, one or both podiums?

Answer: No

6 Will any other furniture be required in this solicitation beyond the (1) equipment rack?

Answer: No

7 At the site survey, it was noted that the list of equipment on the provided Statement of Work was for general functionality overview vs.

specific items required to satisfy the requirements of this solicitation. Is this correct and if so, are deviations from the provided equipment list acceptable as long as the required functionality of the space is met or exceeded?

Answer: Items required must meet or exceed functionality of items listed.

8 There will be new 120V power receptacles required at the (3) new display locations. Will the government provide these new power receptacles prior to the start of the new system installation activities?

Answer: No; all power requirements should be considered part of this statement of work.

9 There will be a new 120V power junction box required at the (1) new projection screen location. Will the government provide this new power receptacle prior to the start of the new system installation activities?

Will the government complete the 120V wiring from the junction box to the projection screen once the contractor has installed the screen?

Answer: No; all power requirements should be considered part of this statement of work.

10 Per the site survey, a new network drop will be required at the rack/computer workstation location. Please detail this requirement.

Answer: All required cat 6 cabling back to the communications closet and an active 4 port network drop should be considered part of this request.

11 Is the space above the existing ceiling grid in the room where the system installation will take place plenum or non-plenum?

Answer: Plenum is not required.

12 Can low voltage cabling be run within the walls of the room?

Answer: yes; must be per code.

13 If low voltage cables can be run within the walls, are they required to be run within conduit?

Answer: Cabling must meet required code specifications.

14 If conduit is required for within-wall low voltage cabling, will the government install said conduit prior to the start of new system installation activities?

Answer: No; all power and cabling requirements should be considered part of this request.

15 Will the compiled and uncompiled source code for the control system be a deliverable for this solicitation?

Answer: Yes; the government should own any source code created to support this system as it is delivered.

16 Will content audio (i.e. audio from the single presentation PC) be required to be heard by all of the room participants? If so, audio equipment beyond that specified in the Statement of Work will be required.

Answer: Yes; audio and Video generated from the GFE computer, laptop input, and analog TV signal will be required to be seen and heard by all participants in the room.

17 Will voice lift (voice amplification) for the participants within the existing conference table be required? If so, audio equipment beyond that specified in the Statement of Work will be required.

Answer: Yes; voice amplification from participants located at a center table (when room configured as such) will be required

18 Is there a requirement for the contractor to provide warranty support?

If so, please define the duration and warranty/maintenance expectations.

Answer: manufactures warranty will suffice

19 What is the period of performance for this solicitation?

Answer: delivery and installation must be complete prior to 1 October 2015.

20 How long after the bid submission due date do you anticipate an award?

Answer: Within 30 days

21 Will there either now or in the future be an operator station adjacent to the rack?

Answer: Yes

22 Can you please clarify what type of drop you require at the PC location?

Plenum cable?

Answer: Non Plenum

23 Will the displays also have a cable or antenna system connected to them? If yes who will be providing the cabling?

Answer: No antenna cabling will be required.

24 Will any structural support required for the displays on articulating mounts be furnished by the base or should it be considered part of our quote?

Answer: All mounting requirements should be considered part of this request.

25 What outputs for video will the supplied PC provide?

Answer: Video output on the government provided PC will be as needed.

26 Can the government provide diagrams of the room with measurements?

Answer: No, a site visit was held to allow vendors to take measurements.

File details come from the government source that posted it. Updated .