Attachment_1_-__Statement_of_Work_tile_in_BLD_501.pdf

PDF 133 KB Posted

Attached to
Pope Vinyl Flooring
Solicitation number
F2MTRP9072AW01
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
Question_and_Answers_for_Contractors.docx DOCX document
Bldg_501_Design_Layout_Vinyl_Flooring.pptx PPTX presentation
Pope_Vinyl_Flooring_Amendment__1.pdf PDF
Pope_Vinyl_Flooring.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR THE

REMOVAL OF OLD CARPET AND

REPLACEMENT WITH TILE IN BLDG 501

1. DESCRIPTION OF SERVICES

1.1. The contractor shall provide all labor, equipment, tools, materials, transportation, supervision, and other items and services necessary to remove old carpet and install VTC Tile on the 1st floor locker room hallway and the east end of the second floor.

1.2. SCOPE OF WORK: The following scope of work shall serve as general information only and shall not limit the contractor’s responsibility or obligations to perform all tasks(s) within local, state and federal laws as well as manufacturer’s recommendations. All quantities in this statement of work are approximate and shall not be verified by the contractor without a written request approved by a government representative.

1.3. The contractor shall perform work inside the facility as required.

Samples of new equipment, materials and accessories shall be submitted to the Contracting Officer or Contracting Specialist for approval.

2. PERSONNEL

2.1. The contractor shall provide supervision that is experienced, fully qualified, and well versed in construction terminology. The supervisor shall maintain direct control and surveillance of all contract personnel who are performing the work.

2.2. The contractor shall submit Materials Submittal, and cost estimated based on this Statement of Work.

3. WORKING HOURS AND SCHEDULING

3.1. Work will be performed during normal duty business hours:

0730‐1630 M‐F.

3.2. Work will be done in such as manner as to not interfere with student training. The contractor will coordinate with the unit representative/ facility manager (Mr. Dan Kaster) to ensure that tile workers are not working in the same classroom that the students are learning in.

3.3. The contractor will be required to meet with the facility manager (Mr. Dan Kaster) and any contract representative within 48 hours after contract award to establish a work schedule. Work will be inspected, repaired, and completed within a timely manner not to exceed (10) ten days after start of the contract, keeping all down time of equipment at a minimum and within the agreed upon schedule of the contract.

4. SECURITY

4.1. All workers will be legal U.S. Citizens with legal picture ID’s and able to gain a clearance on to the military installation.

4.2. No guns, drugs, or illegal paraphernalia will be allowed on the military installation.

4.3. All vehicles, equipment, and containers will be subject to search at any time while on or seeking access to the military installation.

5. GENERAL NARRATION OF WORK:

5.1. In building 501, work will be performed in the following locations:

‐1st floor locker room hallway ‐2nd floor East hallway ‐2nd floor East hallway classrooms

These locations shall have the old carpet removed, adhesive removed, and the new VTC with a 4 inch wall base installed. The contractor shall move furniture as needed before work begins and shall return the furniture to original places after work is completed.

Finished work shall meet industry standards.

6. PROTECTION OF GOVERNMENT PROPERTY

6.1. The contractor will protect all government and personnel property from damage. At the conclusion of each work day the contractor shall properly secure the Aqua Training Centers outer doors. Any damage caused by the contractor will be replaced or repaired at contractors cost prior to payment.

7. SAFETY

7.1. All OSHA standards will be complied with.

7.2. Proper PPE will be worn at all times.

7.3. Best practices of safety in the work place will be adhered to at all times.

7.4. Any electrical, gas, or chemical work will be done by licensed personnel only.

7.5. All tools and materials will be cleaned up and stored safely at the end of the work day or on extended breaks (i.e. lunch).

8. INSPECTION AND ACCEPTANCE

8.1. When work is complete the Unit Facility Manager will inspect the work for completion and quality prior to the job being accepted.

8.2. A minimum of a 12 month warranty on all work will be required in writing upon job completion.

9. FINAL CLEAN UP

9.1. Upon completion the contractor will adhere to industry standards for clean‐up.

9.2 Disposal of Carpet shall be off base.