Attachment_C_-_SOW.docx
DOCX document 14 KB Posted
- Attached to
- Refrigerators and Microwaves II
- Solicitation number
- F2M3CH6040AW01
About this file
Attachment C - Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 15_Combined_Synopsis_-__Amendment_01.docx | DOCX document | |
| Question_and_Answers_to_RFQ_F2M3CH6040AW01.docx | DOCX document | |
| Attachment_A_-_Building_Address_F2M3CH6040AW01.docx | DOCX document | |
| Attachment_B_-_Salient_Characteristics_F2M3CH6040AW01.xlsx | XLSX spreadsheet | |
| Combined_Synopsis.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C
STATEMENT OF WORK FOR
STUDENT DORMITORY FURNISHING & APPLIANCE INSTALLATION
ON
JBSA-LAK
1. DESCRIPTION OF SERVICES. The Contractor shall provide delivery and installation of all purchased furnishings. The objective of this project is properly placing all purchased furnishings as directed. All materials and accessories shall be installed in accordance with industry standards, manufacturer's recommendations.
2. LOCATION: Building 10050 on Lackland AFB, TX, located in San Antonio, TX 78236.
3. PROJECT DESCRIPTION: This project requires the delivery and installation of purchased furnishings throughout Bldg. 10050.
4. SITE DESCRIPTION: This project requires delivery and installation of all furnishings and/or appliances throughout the designated student dormitory/facility with outside access to the rooms and stairs on both ends and in the middle of the building. There are three floors with stairwells in the midle and end of each floor. There are NO elevators.
5. STORAGE AND PARKING:
No contractor storage is required for this project. Parking shall be in the vicinity of the job site.
6. PROJECT SCHEDULE: Contractor shall ensure to install furnishings and/or appliances as directed.
7. HOURS OF OPERATION: The delivery and installation shall be performed during normal duty hours (8:00 A M. to 3:00 P. M., Monday thru Friday).
8. WORKMANSHIP: The Contractor shall perform all operations in a manner that will result in a professional and expeditiously completed project. The work shall be in strict accordance with the prevailing industry standards. Contractor shall be experienced in the specification, fabrication and installation of curtains appropriate for residential use.
9. ACCESSORIES AND INCIDENTALS: Contractor shall provide all incidentals necessary. Cost for these items shall be included as part and parcel of the finished installation.
10. DEMOLITION: None is required.
11. INSTALLATION: The installation date shall be coordinated and confirmed between the Contracting Officer and the end user designated point of contract.
12. QUALITY ASSURANCE: The government shall inspect all work performed by the contractor. Work performance shall be deemed satisfactory and acceptable to the government when the Housing Manager declares the project satisfactory.
13. CLEANUP: The Contractor shall collect all trash, debris, refuse, garbage, etc., which he generates and remove it from the site.
14. PROTECTION: The contractor shall take precautions to prevent damage to government property. The contractor shall repair or replace damaged items at no additional cost to the government.
15. COMPLETION OF WORK: The contractor shall ensure that work for this project is performed in accordance with the criteria herein, and that all relevant materials, finishes, equipment, and systems shall be fully operational at the completion of work for this project.
16. ENVIRONMENTAL REQUIREMENTS: The contractor shall perform all work in accordance with federal, state, and local environmental regulations.
END OF STATEMENT OF WORK
File details come from the government source that posted it. Updated .