Ball Wedge Bonder Specs-Post 2.pdf
PDF 120 KB Posted
- Attached to
- Ball/Wedge Bonder
- Solicitation number
- F2KBAD2060A002
About this file
Ball Wedge Bonder Specifications
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BALL/WEDGE WIRE BONDER SYSTEM
CLIN 0001
Ball/Wedge Wire Bonder System Main Unit Specifications (West Bond 7700D-79 or equivalent):
1. Bonds shall be made by the ball-to-wedge technique using ultrasonic energy and heat
2. X-Y-Z sample manipulator shall be independently guided and can be locked into position.
3. Flange mounted Transducer with 0.625” capillary
4. Self-contained wire clamps with vertical feeds
5. Stepper motor driven spiral clamps
6. Pneumatically controlled electronic torch
7. Precision control of bond and ball formation
8. Security bond option
9. User programmable settings
10. Adjustable height platform
11. Capillary tool
12. Operations manual(s) included
13. System shall be operational in a cleanroom environment
COMPONENTS FOR BALL/WEDGE WIRE BONDER SYSTEM
CLIN 0002
Microscope (Olympus Model SZ51-60 or equivalent)
1. E-Arm (or equivalent)
2. 15X eyepiece
3. ESD protection
4. Clean room ready
CLIN 0003
Illuminator (Luxuary II Illuminator Kit -10265 or equivalent)
1. Focused Single array with working distances of 80-120mm
2. Power supply with adjustable selector switch
3. Mounting hardware
4. Clean room ready
CLIN 0004
Temperature Controller (K~1200-D or equivalent)
1. 400 Watts
2. System compatible with work holder
3. Clean room ready
CLIN 0005
Free Furnace Work Holder ( -45G.533 or equivalent)
1. 3” x 2.75” substrate compatible
2. Mechanical clamp
3. 0.0625” Diameter Vacuum hole
4. Adjustable backstop
5. 2.656” fixed height
6. Clean room ready
CLIN 0006
Crating And Shipping
1. System should be professionally crated to ensure safe transit
Installation
1. System installed by factory trained technician/engineer on premises at KAFB, NM
2. System installed per OEM factor specification
3. System operational integrity checked and verified in presence of user prior to acceptance
Training
1. On-site training of three (3) AFRL/RDLAS employees by factory trained technician/engineer. Training shall consist of operational, maintenance, repair and troubleshooting techniques.
WARRANTY
1. Minimum of 12 months parts and labor at installation site KAFB, NM
2. Ball/Wedge system and all subsystems should be free from any defects in materials, workmanship and system operations for 12 months from acceptance. The contractor shall replace faulty system and subsystem parts at no additional charge.
3. During the warranty period, all replacement parts provided by the contractor must meet all OEM specifications.
File details come from the government source that posted it. Updated .