Attachment 1 - SOW_805 CTS Climate Controlled Storage Container Rental.pdf
PDF 86 KB Posted
- Attached to
- 805 CTS Climate Controlled Storage Containers
- Solicitation number
- F2FT574008A001-1
About this file
This document is a Statement of Work (SOW) for the rental of four 16' portable storage containers to be delivered to the 805th Combat Training Squadron (CTS) Shadow Operations Center (ShOC-N) at Nellis AFB, NV. The containers will be used to temporarily store 805th CTS equipment, including IT equipment and other heat-sensitive items, during a building renovation project. The Contractor shall provide the containers, transport them to and from the ShOC-N campus, and store them in a climate-controlled facility to protect the stored items from extreme heat and environmental conditions for a 12-month period.
The related federal contract opportunity is a Request for Proposal (RFP) for the rental of the four storage containers. The RFP is a Small Business set-aside with a NAICS code of 531130 - Lessors of Mini-warehouses and Self-Storage Units. The RFP includes five contract line items for monthly rental, delivery/pickup to/from the ShOC-N campus and the Contractor's climate-controlled storage facility, and an optional additional delivery/pickup. Offers are due by April 8, 2024 at 10:00am PDT.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combo Synopsis_updated 25 Mar 24.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
For
805th Combat Training Squadron (CTS) rental of four Portable Storage Containers
I. INTRODUCTION
The 805th CTS, at Nellis AFB, NV, has a requirement for the rental of four 16’storage containers to be delivered to the 805th CTS Shadow Operations Center (ShOC-N), Nellis AFB, for customer loading of items to be stored. Upon completion of loading, the Contractor shall return to pick up the containers and deliver them for storage in a climate-controlled facility. Storage containers will be utilized to temporarily stock a various number of materials with the focus to protect IT equipment or other heat sensitive items from the extreme heat/outside conditions with the use of Contractor’s climate-controlled facility for 12 months after receipt of order.
II. BACKGROUND
The 805th CTS warehouse is nearly at maximum capacity. Additional temporary storage is required during the renovation of the ShOC-N building to store all items removed at project kickoff.
III. SCOPE
The overall purpose of this requirement is to provide storage containers to store 805th CTS equipment and to be stored at the Contractor’s climate-controlled facility to protect heat sensitive material. The required technical specifications of the four portable storage containers and facility will be as follows:
a. The project is being completed in phases. Upon initial delivery of the storage container to the ShOC-N campus, the Government shall load the storage container. After the items are loaded, the Contractor shall return to pick-up the storage container and transport/drop-off to the climate-controlled storage facility. Once a phase is complete, the Government shall request for the storage containers to be returned to Nellis AFB. The Government will then utilize the container for additional items to be stored. After the storage containers are loaded, the Contractor shall pickup the storage container to return to the climate-controlled storage facility until the Government requests for the final drop-off to unload the stored items.
b. The Contractor shall provide a standard width storage container with external dimensions of 8’ x 8’ x 16’, volume of 1250 square feet, and internal dimensions of 7’8 x7’10.25” x 15’10.5, volume of 904 cubic feet. A size variation of 1’, in any direction, is acceptable to the Government.
c. Includes premium double entry doors allowing for accessing the containers and to maintain internal temperatures and prevent moisture build up.
d. Equipped with a secure locking mechanism to properly stow away all IT equipment and other material. The Government will provide locking mechanisms to ensure safeguard of Government equipment while stored at Contractor’s facility.
e. Constructed from material such as 100% corrugated steel, not wood or lightweight materials, to ensure durability and resistance to environmental conditions.
f. Contractor’s facility must have indoor climate-controlled capabilities to combat extreme heat, ensure air circulation, prevent the buildup of condensation, and maintain air quality to prevent damage to stored items.
g. 24/7 Monitoring systems for security status of Contractor’s facility including alarms and cameras for real time alerts.
IV. WORK REQUIREMENTS
The Contractor shall provide all delivery, pick-up, labor, and equipment required to load/unload the four portable containers onto the 805th CTS ShOC-N campus. The address of the facility is as follows: 3663 Tyndall Ave BDLG 202, Nellis AFB, NV 89191.
V. CONSTRAINTS
805th CTS operates on an Air Force installation. The Contractor shall comply with all Nellis AFB security requirements including, but not limited to, base access and gate restrictions.