2012 ALUM PERFORMANCE WORK STATEMENT.doc
DOC document 35 KB Posted
- Attached to
- Liquid Alum (Aluminum Sulfate)
- Solicitation number
- F2F3232082AU01
About this file
Contractor shall deliver liquid alum in accordance with the performance work statement
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
TO
DELIVER ALUMINUM SULFATE SOLUTION (LIQUID ALUM) TO
HURLBURT FIELD ADVANCED WASTEWATER TREATMENT
FACILITY (BLDG. 91500)
1 SOCES/CEOIB
415 Independence Road
Hurlburt Field, FL 32544
PERFORMANCE WORK STATEMENT
1.01 WORK INCLUDED: The Service Provider shall furnish all vehicles, trailers, containers, tools, equipment, parts, materials, supplies and labor for the loading, handling, transportation and unloading of Aluminum Sulfate Solution (Liquid Alum) to Hurlburt Field’s Advanced Wastewater Treatment Facility (Building 91500).
1.02 JOB DESCRIPTION: The work to be performed includes the following principal features:
a. Maximum quantity ordered and delivered will be 4,500 gallons (plus or minus 100 gallons).
b. Service provider shall plan for three (3) to five (5) deliveries per year.
c. Delivery vehicle must have air or sufficient means to transfer Liquid Alum from vehicle to on-site container (Gravity can not be used to transfer Liquid Alum).
d. Service provider shall ensure Liquid Alum delivered is of low Iron content.
e. Service provider shall provide related documentation (Bill of Laden) and Certificate of Analysis at time of delivery.
f. Service provider shall ensure Liquid Alum delivered meets the following specifications, and such specifications are reported on the Certificate of Analysis:
| Measurement |
| Specifications |
| % of Al2O3 (Aluminum oxide) by wt. |
| 8.12 (min.) to 8.30 (max.) |
| Baume’ @ 60 degrees F. |
| 35.5 (min.) to 36.5 (max.) |
| Iron as Fe (ppm) |
| 50 (max.) |
1.03 PERFORMANCE TIME
a. Service provider shall deliver Liquid Alum within 10 working days of being notified. Date and approximate time of delivery will be coordinated between service provider and Hurlburt Field’s Wastewater Treatment Plant Supervisor.
b. Service provider shall allow for two (2) hours unloading time.
1.04 INSPECTION
a. Personnel of 1 SOCES/CEOIB shall serve as the on-site representative of the Contracting Officer. Call (850) 881-1511 for questions.
File details come from the government source that posted it. Updated .