Tie Down Anchors and Driving Rods SOW_rev 1.pdf
PDF 133 KB Posted
- Attached to
- Tie Down Anchors and Driving Rods
- Solicitation number
- F2BDAP4220A001
About this file
This document is a Statement of Work (SOW) for the procurement of 21 sets of 9 tie-down ground anchors with 60" cables, and 6 heat-treated 1" by 6' driving rods. The SOW specifies that the anchoring system is required to support test events. It provides details on the technical requirements for the tie-down anchors and driving rods, including the required minimum pullout force, cable length, and heat treatment. The SOW also includes packaging and delivery instructions, with a specified delivery location and timeline of 135 days after receipt of order. The related federal contract opportunity is a solicitation for the same requirement, with an opportunity ID, solicitation number, and a brief description of the overall need. The contracting agency is the Department of the Air Force Materiel Command Lifecycle Management Center at Hanscom Air Force Base.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tie down Anchors QandA.xlsx | XLSX spreadsheet | |
| Combined Synopsis Solicitation_Tie Down Anchors_signed_dated 9 September 2024.pdf | ||
| Bid Schedule_Tie Down Anchors and Driving Rods.xlsx | XLSX spreadsheet | |
| Tie Down Anchors and Driving Rods SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW Description: Tie-Down Anchors and Driving Rods, Procurement
1. Purpose: The vendor is required to procure and deliver twenty-one (21) sets of nine (9) 8” tie-down ground anchors with 60” cables, and six (6) heat treated 1" by 6' driving rods. This anchoring system is required in support of test events.
2. Period of Performance: Delivery 135 Days After Receipt of Order (ARO)
3. Requirement Specifics:
a. Tie-down anchor 8” with 60” cable (NSN 4030-00-974-5144)
i. Each tie-down anchor shall be capable of resisting a minimum pullout force of 5,200 lbs. (2,359 kg) in the direction of the chain
ii. Each set shall contain nine (9) 8” tie-down ground anchors, and nine (9) 60” cables
iii. Total quantity: twenty-one (21) sets
b. Driving rods
i. Must be 1" by 6' and heat treated
ii. No specified NSN
iii. Must be capable of multiple uses on the anchors delivered
iv. Total quantity: six (6)
4. Packaging and delivery Instructions:
Physical Delivery Location:
CT National Guard 103rd Air Control Squadron Building 20, 206 Boston Post Rd. Orange, CT 06477-3224 Delivery Hours: Monday – Thursday 0700-1600 Delivery Location POC: MSgt Morgan Nairn; Comm: 203-793-2940
5. Special Instructions: The vendor shall notify the government of their intent to ship 15 business days prior to delivery. Notification shall be given to the identified Government POC or the alternate POC.
6. Points of Contact:
- Delivery Contact:
- PM: Dan Craig; daniel.craig.3.ctr@us.af.mil
- LG: Jon Willey; jonathan.willey.1@us.af.mil
File details come from the government source that posted it. Updated .