Boiler Controls – Questions and Answers:

1. Are the Boilers dual or natural gas only?

Answer: Dual

2. Is it anticipated that there will be a need for five (5) days on site per month? So a total of one business week per month?

Answer: On average, there will be a need of 5 days per month. It could be more one month and less the next.

3. How many shutdowns?

Answer: There will be two (2) shutdowns. One in the fall and one in the spring.

4. How long are the shutdowns for?

Answer: They are approximately from 5PM EST on Friday until 8PM EST on Sunday.

5. What are the rates used for this action?

Answer: Rates are based on Davis Bacon

6. What are the number of tune ups (annually)?

Answer: One – for the RACT

7. Will the contractor be performing RACT testing?

Answer: This requirement shall be included as part of the base and option year contract, as a separate line item, which may not be exercised due to an existing RACT only contract in place with undetermined duration. Price CLIN 0005, 1005, 2005, 3005, 4005 accordingly.

8. How many boilers usually operate in December?

Answer: Four (4) boilers are usually operating in December.

9. Is the NBIC Certification/License actually required?

Answer: No. This has been removed as a technical requirement from both the Performance Work Statement (PWS) and the Combined Synopsis/Solicitation (COMBO). Please review the updated documents located at: