This document appears to be a set of questions and answers related to a federal contract opportunity for the maintenance and repair of pool filters and related systems. The contract involves servicing/repairing six EPD filters, installing a new pool chemistry system, and a new chlorine feeding system for an existing Fillion filter system. Key details include:
The pool has a total volume of 600,000 gallons and utilizes 40HP motors with a 1,200 GPM rating on VFDs. The existing system, which is 30 years old, will be replaced with the latest technology. The contractor will provide a 1-year warranty on the installation and materials. The period of performance is 90 days after award, which was adjusted from the original 45-day requirement due to current material lead times. This is not a prevailing wage project. The agency is the Department of the Air Force Materiel Command Lifecycle Management Center at Hanscom Air Force Base.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pool Filter Questions Received:
• Was the site visit required for provide proposals?
While a site visit is important to get a full understanding of the scope of work, it is not required.
• Are these filters fiberglass or carbon steel?
Carbon steel.
• What are the serial numbers of the filters?
Serial numbers are not legible.
• What type and size are the existing backwash valves?
4-inch EPD.
• What type and size are the existing Victaulic Couplings?
4 inch.
• What type is the existing chlorination system at the pool?
Accu-tab 3140 chlorine feeder.
• How many total gallons is the pool?
600,000 gallons.
• How many motors are there in pump room and what is the GPM rating?
2- 40 HP. 1,200 gallon per minute and the motors are on VFDs. Replacement of the pumps is not required for this project.
• Is this a prevailing wage project? if so please provide the latest wage determination doc.
This is not a prevailing wage project.
• REF: SOW Sec 2.1 “replace the Aquatic Intelligence filter control system with emergency stop” o What should this be replaced with?
Replace with the latest technology as the existing filter and systems are 30 years old.
• REF SPEC 11. “Date of delivery / Period of Performance: 45 days after receipt of award” o Will the government allow for a 90-day completion/delivery date? Currently materials are forecasted 6-8 weeks out after receipt of award.
Yes
• REF SOW Sec 3.1 “The Contractor shall also provide a 1-year contractor installation warranty.”
o Does this include a 1-year warranty on the materials?
Yes.
• Do you have the make model of the pool mechanical system?
No. This not an off the shelf system, the system was designed, fabricated and install by Fillion Associates.
• Also, can you provide pictures?