SOW High Reach 7 Apr 2020.pdf
PDF 80 KB Posted
- Attached to
- High Reach Lift
- Solicitation number
- F252120QB034
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
920th MAINTENANCE SQUADRON (MXS) HIGH REACH
LIFT
STATEMENT OF WORK (SOW)
7 Apr 2020
1.0 DESCRIPTION OF SERVICES
The 920th MXS has a requirement for the rental of one (1) High Reach Lift at Patrick Air Force Base (PAFB), FL 32925. The Contractor shall provide all labor and materials for the delivery, maintenance, repair, and pick-up of the high reach lift. The high reach lift shall remain on-site for the duration of the required period of performance. Once the Government's requirement for the high reach lift is no longer required, the Contractor shall pick-up the high reach lift from the on-site location. If the lift requires off site maintenance or replacement, the Contractor shall also pick-up the high reach lift from the on-site location and replace with working lift within five (5) business days.
1.1 Salient Characteristics
The high reach lift must include the following:
-Platform Height to reach over 55ft -Motion Alarm -Horizontal reach over 50ft -Platform control -360 degree swing -Platform capacity of at least 500 pounds -Gas/Diesel Power -Fall restraint attachment -Gate on platform
1.2 Maintenance Requirements
High reach lift shall be repaired or replaced by the Contractor, at Contractor’s expense, if mechanical or operational operations are compromised. Contractor shall respond and schedule a site visit for repair within one (1) business day of notification of lift malfunction.
1.3 Period of Performance
The high reach lift (1) is required for a period of twelve (12) months after receipt of order (ARO), with the possibility of one (1) 6-MO option period. The total Period of Performance is to be 18 MO. Following contract award, high reach lift shall be delivered within five (5) working days of notification from the Government that the using unit is prepared to receive.
1.4 Place of Performance
The contractor will deliver the high reach lift to a location directed by the 920 MXS, general area near Bldg 688 (wash rack), Rescue Rd, Patrick AFB, FL 32925.
3.0 POINTS OF CONTACT
The points of contact for delivery, installation and pick-up are SMSgt Trevor Frankel, phone
(321) 494-3315, email: trevor.frankel.4@us.af.mil and MSgt Steven Hirzel, phone (321) 494-mailto:trevor.frankel.4@us.af.mil
6331, email: steven.hirzel.2@us.af.mil.
4.0 WORK HOURS
Delivery, installation and pick-up may be completed between the hours of 7:00 AM and 3:30 PM, Monday through Friday, excluding federal holidays. Any work performed outside of aforementioned work hours must be approved by the cognizant Contracting Officer.
Monday, May 25 – Memorial Day Friday, July 3 – Independence Day (July 4, 2020 falls on a Saturday. For most Federal Employees, Friday July 3, will be treated as a holiday for pay and leave purposes) Monday, September 7 – Labor Day Monday, October 12 – Columbus Day Wednesday, November 11 – Veterans Day Thursday, November 26 – Thanksgiving Day Friday, December 25 – Christmas Day
5.0 GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES
The Government will not provide any property or services for the contractor other than the area identified for placement. The containers will remain under secure control by the Government during the period of performance identified in this SOW.
6.0 BASE ACCESS
Contractor personnel are required to be a citizen of the United States and be free of any felony records. Proof of current vehicle registration, driver’s license and vehicle insurance must be made available prior to issuance of base access permits. The Contractor shall obtain base access for all personnel, subcontractors, vehicles and equipment.
7.0 REGULATIONS AND STANDARDS
The Contractor shall comply with all PAFB safety standards and all Occupational Safety, Health Act Safety and Health Standards (OSHA) standards. Resolution of citations for violations of OSHA is the contractor’s responsibility. The Contractor shall be responsible for supervision of all contract personnel and performance of all Contractor related functions.
8.0 NO SMOKING POLICY
There is and Air Force Policy of NO SMOKING in any Government building or vehicle in accordance with AFI 40.102 (03 Jan 1994).
mailto:steven.hirzel.2@us.af.mil
| 920th MAINTENANCE SQUADRON (MXS) HIGH REACH LIFT |
| STATEMENT OF WORK (SOW) |
| 25 March 2020 |
File details come from the government source that posted it. Updated .