This is a Scope of Services document from the Florida Department of Transportation (FDOT) for the delivery and installation of a 24' x 124' x 12' wooden pole barn with enclosed back and side walls at the FDOT Bridge Facility in Duval County, Jacksonville. The project requires design, construction, permitting, and installation of the pole barn structure with metal sheathing, meeting all Florida Building Code requirements. The work location is at District 2 Jacksonville Bridge Maintenance Yard at 838 Ellis Rd., Jacksonville, FL 32205. The contract time is 45 calendar days, with work hours restricted to Monday through Friday, 7:00 am to 5:00 pm. Contractors must have three years of commercial project experience and be appropriately licensed in Florida.

The technical specifications require pressure-treated 8x8 posts, 26-gauge galvalume painted metal roofing with 3/12 minimum pitch, 24-gauge painted galvalume PBR metal wall panels, and 2x6 southern yellow pine wall construction with 4x4 posts every 6 feet. The contractor must provide a two-year warranty on craftsmanship, materials, installation, and labor from the date of final acceptance. The contractor is responsible for all permitting fees, obtaining signed and sealed shop drawings, and must submit daily progress reports. Pre-engineered or prefabricated structures are acceptable if they meet all requirements. The project requires coordination with the FDOT Project Manager Stephen Stafford for color selection and work scheduling.

View the file

Other files

File Type Posted
F2035 Invitation to Bid.pdf PDF
d2-fax-order-form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A Scope of Services Delivery and installation 24’ X 124’ X 12’ Pole Barn with enclosed back and side walls at Florida Department of Transportation Bridge Facility in Duval County.

Scope:

Provide sufficient design, work force, equipment, safety, materials, permitting, and all incidentals as necessary to design and build a wooden pole barn 24’x 124’ x 12’. The back and two sides will be enclosed with metal sheathing. All work will be in accordance with this scope, specifications, local building codes, and contract terms. It will be the Contractors responsibility to acquire and comply with all necessary regulations and guidelines that apply to the design and construction work required to complete the project. Contractor shall obtain all required permits and approvals necessary to complete the work. Copies of all required plans, permits, inspections and certifications are to be delivered to the

Department Project Manager before final payment has been made.

It is highly recommended that all bidders call to schedule site visit(s) to confirm accuracy of attached documents, determine available work area, storage space, constraints, all dimensions, and the scope of work at the specified location(s).

Location:

District 2 Jacksonville Bridge Maintenance Yard located at 838 Ellis Rd., Jacksonville, FL 32205. To arrange site visit for identification of work location(s), project quantities, and confirm existing conditions/scope of work for bidding purposes. Contact Stephen Stafford (904)360-5287

Experience:

The contractor is required to be appropriately licensed in the State of Florida and have three (3) years’ experience in Commercial Projects of similar scope and complexity prior to award of contract. The contractor is responsible for maintaining all applicable licensure, meeting the requirements of the most current Florida Building Code (FBC) and obtain necessary permitting to perform the requirements of the contract.

Work Schedule:

A pre-work meeting shall be conducted prior to any work commencing on the project. Items to be discussed include the following contract terms:

Work Schedule: No work shall be accomplished outside of the defined workday without prior written approval of the Owner’s (FDOT) Project Manager (Stephen Stafford) for the work location. Workdays are defined as Monday through Friday from 7:00 am to 5:00 pm; no work will be allowed on weekends or state holidays and office closures unless written approval has been granted.

Offices to remain operational during all work activities.

Contract Time is forty-five (45) calendar days.

Building color selection will be made by Project Manager (Stephen Stafford).

Job Completion Schedule: Contractor shall provide, for Owner’s review and written approval, a schedule of dates for beginning and completion of work.

All relevant contract, documentation, and work-related details including for completion of activities.

Exchange of all relevant contact information for the Contractor and Owner personnel assigned to the project.

General:

Pre-engineered or Prefabricated structures are eligible to be used for this project provided they meet all contract requirements.

Any/all references to manufacturer, brand, and/or model are intended as reference. Contractor may substitute equivalent components with Owner’s approval.

Contractor shall obtain any/all required permits, Inspections, and approvals necessary to complete work and pay all associated fees. Copies of all shop drawings, permits, inspections, and certifications are to be delivered to the Department’s Project Manager before any payments will be made.

Contractor shall provide and install all necessary components required by building codes. All installation shall create complete assemblies that operate within manufacture's design parameters at no additional cost.

Contractor shall comply with its responsibilities as provided in the FCO NONTECHNICAL

SPECIFICATIONS.

Contractor is responsible for demolition and disposal of all generated construction debris in compliance with all applicable environmental codes and laws.

• The Contractor will coordinate with the FDOT Project Manager each workday during the life of the contract.

• Damaged or Destroyed Property. The Contractor shall be responsible for the cost of all labor and parts that are required for any repair(s) of property that was damaged during the Project as a result of the Contractors activities. The Department has the option to deduct the costs of all repairs or replacements completed from the Contractor’s invoice or to require the contractor to pay for the repairs and replacements. The Department reserves the right to make immediate repairs to correct damage to property when such loss is detrimental to the Department's operations.

• Any/all Contractor submitted conditions, qualifications, and/or shrink-wrapped references/links shall be null and void and may be grounds for their bids to be declared non-responsive.

Technical Special Provisions:

Contactor shall design and construct a wooden pole barn 24’x 124’ x 12’ Equipment Canopy. The back and two ends will be enclosed with metal sheathing. Design and construction must meet the current

Florida Building Code, requirements contained in this Scope, and the following criteria:

Contractor shall provide Signed & Sealed shop drawings and all plans to the Department for review/approval prior to applying for any required permits. Contractor shall receive the building permit prior to commencing work.

These are our minimum building requirements, but the building design may require additional structure to meet wind load and State & County Building codes.

Wind load: Built to meet Wind Load requirements based upon the risk code of the structure, location, building code, and permitting agency requirements.

Post: Shall be pressure treated 8x8 posts buried in concrete.

Roof Shape: Rectangular with a Minimum 12” overhang on the gable ends.

Length: 124’

Width: 24’

Roof Pitch: Minimum 3/12 pitch.

Clearances (height): Lowest point of the roof/eave shall not be less than 12' above the ground.

Roof Material: 26-gauge, galvalume painted (corrugated) metal.

Walls shall be constructed out of 2x6 southern yellow pine with 4X4 post every 6’ buried in concrete so no span is greater than 6’ without a supporting post.

All wood structure will have to be bolted or screwed together unless noted otherwise in the submitted sign and sealed plans.

Wall sheathing: 24-gauge, painted galvalume PBR metal panels.

Shall be required to use domed caped metal roofing screws to fasten all metal panels.

Warranty:

Contractor shall provide warranties on Craftsmanship, materials, installation, and labor for a period of two (2) years. The warranty period shall begin at the date of final acceptance.

QA, Inspection, and Reporting:

The Owner reserves the right to inspect the Contractor’s work at any time. The Owner’s determination and decision as to the amount, quality and acceptability of the work, materials, and fulfillment of these specifications is final and conclusive.

Maintain and submit a daily record of progress on forms approved by the Owner to the Owner’s representative for contract files.

Prior to final payment Contractor shall submit full as-built plans and written certification on company letterhead that the work at the specified location was performed in accordance with contract terms and local building codes, specifications, and requirements.

Storage, Clean-Up, and Disposal:

The Owner will provide areas for the Contractor to store materials and equipment on site. Store all materials, equipment, and incidentals only in approved locations.

Clean all work areas at the end of each workday. Remove, or temporarily store in Contractor provided containers, all construction tools, un-installed equipment, and materials from the premises upon completion of each workday. If a trailer is used, the Contractor may park the trailer on-site in a location approved by Owner. Owner is not responsible for damage or loss of any stored items due to vandalism or theft.

Cover and protect surrounding area(s), building mechanicals, and equipment to protect from damage.

Store all materials, equipment, and incidentals only in approved locations.

Dispose of all wastes in accordance with all Federal, State and Local rules and regulations. Provide the Department with all documentation confirming disposal.

Upon Contractor’s or Contractor’s representative acceptance for transport of any and all non-hazardous or hazardous material and/or waste, the Contractor shall become the co-generator, arranger, transporter, and disposer. Contractor shall assume all co-generator, arranger, transporter, and disposer liability. Disposer liability includes the temporary storage area, recycling facility, and temporary or final disposal facility (facilities). Contractor shall indemnify and hold the Owner harmless for any and all generator, arranger, transporter, and disposer liability arising from this Agreement. Contractor’s obligations include, at the Owner’s option, to participate and associate with the Owner in settlement negotiations, mediation and the defense and trial of any liabilities. Contractor shall notify the Owner in writing immediately upon becoming aware of any liabilities. Contractor’s obligation shall be triggered by the Owner’s written notice of claim for indemnification to the Contractor. Contractor’s inability to evaluate liability, or its evaluation of liability, shall not excuse performance of the provisions of this section.

Remove all construction equipment from the premises upon completion and acceptance of work.

Restore any areas damaged or disturbed by Contractor operations to the satisfaction of the Owner at no additional cost.

Non-Technical Special Provisions:

Non-Technical Specifications Section A-1 Definitions is amended as follows:

The term Laws and Regulations is deleted and replaced with:

Federal, State and Local Rules and Regulations which includes any and all Federal, State, and

Local laws, Bylaws, ordinances, rules, regulations, orders, permits, or decrees including environmental laws, rules, regulations, and permits.

File details come from the government source that posted it. Updated .