PERFORMANCE WORK STATEMENT
For
Systems Furniture Reconfiguration to Support AFTC HQ Remodel Project
Purpose. Dismantle, reposition, and reassemble existing modular furniture as required to complete the AFTC Headquarters Remodel Plan.
Scope of Work. The Contractor will provide all supervision, labor, tools, and equipment required to complete the reconfiguration of Herman Miller EthoSpace modular furniture in Rooms 104, 104A, 106, 106B, 110 and 240 of Bldg 1, Edwards AFB, CA. All modular furniture components necessary to complete the project will be provided by the Government from existing inventory. The Government will also provide detailed workstation design drawings and specifications prior to the scheduled start date. Specific tasks to be completed under this contract will include the following:
1. Meet with the Government representative to review design layouts and resolve potential installation problems prior to start of any work.
2. Dismantle five existing workstations as shown on the Systems Furniture Dismantling Plan (Attachment 1).
3. Sort dismantled components, move excess components to the CONNEX storage container located near Bldg 1, and retrieve additional required parts from the same storage container, as itemized on the Master Parts List (to be provided).
4. Modify available components, including laminate work surfaces and wood trim boards, as necessary and in a professional manner, to allow use of existing assets in completing the new furniture layouts.
5. Assemble two (2) new workstations in Room 104 exactly as shown on the detailed furniture design layout (to be provided).
6. Assemble two (2) new workstations in Room 104A exactly as shown on the detailed furniture design layout (to be provided).
7. Assemble four (4) new workstations in Room 106 exactly as shown on the detailed furniture design layout (to be provided).
8. Assemble one (1) new workstation in Room 106B exactly as shown on the detailed furniture design layout (to be provided).
9. Re-assemble reproduction area modular wall panels and work surfaces previously removed by others in Room 110.
10. Re-assemble and reposition two (2) existing workstations previously dismantled by others in Room 240.
11. Install internal workstation electrical systems as shown on the detailed furniture design layouts, connect circuits to the building electrical system with previously-installed power entry cables, and test all lighting and outlets for proper operation.
12. Ensure that all furniture assemblies are level, square, and aligned with adjoining furniture, and that drawers and cabinet doors operate smoothly after installation.
13. Clear all residual packing materials, trash, and debris from contractor work areas.
14. Sweep floors and vacuum carpets in the work area and adjacent corridors as necessary to remove soil resulting from contractor activities.
Contract Management. Following contract award and prior to commencing work, the contractor will designate in writing a contract manager with full responsibility for coordination with government representatives and for performance of the work. The contract manager will respond to all Government requests and inquiries concerning the project within two business days of receipt. The government representative will notify the contract manager, in writing or via email, of meetings required to discuss contract status and job performance.
Legal and Regulatory Compliance. The contractor will be knowledgeable of, and will comply with, all applicable federal, state and local laws and codes, and with all DoD, Air Force, and base regulations and instructions in the performance of tasks listed in this PWS.
Hours of Operation. Service shall be performed by the contractor during normal government working hours, 7:30 am to 4:30 pm Monday through Friday, excluding U.S. Federal holidays.
Holidays falling on Saturday are observed on Friday and holidays falling on Sunday are observed on Monday. Any deviations of this schedule shall be coordinated with the government representative.
Government Support. The Government will provide adequate work space with working lights, heating and air conditioning, and access to a freight elevator. Water and electricity will be furnished to the contractor from existing Government systems and outlets at no cost to the contractor. The contractor shall furnish all equipment, material, and labor necessary to obtain the utilities from the existing systems/outlets. Restrooms will be available for contractor use.
Vehicle Access: The contract manager will coordinate with the Government representative at least one business day in advance of start date to arrange access to EAFB and to the work areas.
At that time, the contractor must provide the full name of each crew member along with a list of vehicle makes and license numbers. If required under the Force Protection Condition at time of entry, a Government sponsor will meet contractor personnel at the designated entrance gate pass and ID office. Contractor personnel will be required to present the following item when entering EAFB:
• Current registration for each vehicle
• Current proof of insurance for each vehicle
• Valid driver’s license for each driver
• Valid state identification for each passenger
Prohibitions. Firearms and illegal substances may not be brought onto EAFB under any circumstances. The contractor must not employ persons on this contract who, based on the contractor’s prior knowledge, would pose a potential threat to the health, safety, well-being, or mission of EAFB and its population. At the discretion of the installation commander, individuals with criminal records may or may not be allowed on EAFB. Contractor personnel are prohibited from sponsoring guests on the installation.
Safety. The contractor will establish policies and procedures to protect the safety and welfare of customers, employees, and the community. Those policies and procedures must comply with all federal, state, and EAFB occupational safety, health, and environmental standards.
Resolution of citations for violations of safety, health, and environmental standards will be the contractor’s responsibility.
Smoking. Air Force Policy prohibits SMOKING in any Government vehicle or building in accordance with AFI 40.102 (3 Jun 1994). Smoking is permitted in “Designated Areas Only”.
Damage Prevention. The contractor will take all reasonable precautions to avoid damaging furniture, floor coverings, walls, doors, and other building components while completing tasks enumerated in this PWS. Industry-approved protective coverings will be used where appropriate during furniture disassembly, transport, and installation operations. Protective materials and tape that leave residue or marks of any kind on furniture or building surfaces will not be used.
Contractor Liability. The contractor will be liable for any damage to government property caused by its employees or agents. In the event of contractor-caused damage, the Government will arrange proper repairs and subsequently bill the contractor for reimbursement. The contractor will not unilaterally repair damage to Government property without expressed approval by the Government representative.
Mission Essential Services. Contractor services performed under this Statement of Work are not considered mission essential services during emergency conditions or in the event of base closure actions.
Energy Conservation. The contractor will adhere to Government energy conservation policies to include closing doors and windows, turning off lights when not in use, and shutting down vehicle engines while parked.
Installation and Cleanup. All equipment entering designated areas must be inventoried before entry and prior to leaving the designated areas. The contractors will be responsible for clean-up and disposal of all debris, excess material, packing, and other waste resulting from performance of this contract when all work has been completed.
Final Inspection. The contract manager and Government representative will conduct a walk-through inspection to identify and document required corrective actions, if any, upon completion of each moving stage. Following completion of required corrective actions by the contractor, the Government representative will verify satisfactory job completion and sign the contractor invoice to certify receipt of installation services.
| Vehicle Access: The contract manager will coordinate with the Government representative at least one business day in advance of start date to arrange access to EAFB and to the work areas. At that time, the contractor must provide the full name of ea... |
| Current registration for each vehicle |
| Prohibitions. Firearms and illegal substances may not be brought onto EAFB under any circumstances. The contractor must not employ persons on this contract who, based on the contractor’s prior knowledge, would pose a potential threat to the health, ... |
| Safety. The contractor will establish policies and procedures to protect the safety and welfare of customers, employees, and the community. Those policies and procedures must comply with all federal, state, and EAFB occupational safety, health, and ... |
| Smoking. Air Force Policy prohibits SMOKING in any Government vehicle or building in accordance with AFI 40.102 (3 Jun 1994). Smoking is permitted in “Designated Areas Only”. |
| Damage Prevention. The contractor will take all reasonable precautions to avoid damaging furniture, floor coverings, walls, doors, and other building components while completing tasks enumerated in this PWS. Industry-approved protective coverings wil... |
| Contractor Liability. The contractor will be liable for any damage to government property caused by its employees or agents. In the event of contractor-caused damage, the Government will arrange proper repairs and subsequently bill the contractor fo... |
| Mission Essential Services. Contractor services performed under this Statement of Work are not considered mission essential services during emergency conditions or in the event of base closure actions. |
| Energy Conservation. The contractor will adhere to Government energy conservation policies to include closing doors and windows, turning off lights when not in use, and shutting down vehicle engines while parked. |
| Installation and Cleanup. All equipment entering designated areas must be inventoried before entry and prior to leaving the designated areas. The contractors will be responsible for clean-up and disposal of all debris, excess material, packing, and o... |