STATEMENT OF WORK

INDUSTRIAL FLOOR SCRUBBERS

412TH MAINTENANCE GROUP (MXG)

1. SCOPE OF WORK:

The contractor shall furnish all materials, labor, equipment, and transportation necessary to service and perform remedial maintenance on nine Tennant scrubbers/sweepers located on Edwards AFB, Ca. Prior to any work (labor/parts) being performed, pre-approval will be needed from our office 412 MXG Facilities office. Models consist of:

- 550SRS, serial# 550-7356, manufacture year 2013, approximately 90 hours, location

B1600

- 550SRS, serial# 550-7346, manufacture year 2012, approximately 150 hours, location

B1600

- 8300, serial# 8300-3492, manufacture year 2002, approximately 1,417 hours, location

B1600

- 8300, serial# 8300-4023, manufacture year 2004, approximately 650 hours, location

B1600

- 5700 XP ES, serial# 5700-20682, manufacture year 2002, approximately 340 hours, location B3810

- 5700 XP ES, serial# 5700-20683, manufacture year 2002, approximately 350 hours, location B3810

- 5700 XP, serial# 5700-17465, manufacture year 2000, approximately 150 hours, location B710

- 7400, serial# 7400-7869, manufacture year 2005, approximately 1300 hours, location

B1634

- 1490 ES, serial# 1490-70060, manufacture year 1992, approximately 1775 hours, location B1442

2. Work to be performed but not limited to is as follows:

a. Check drive belts for tension - adjust as needed

b. Check fluid level, oil, water and coolant- add as needed

c. Check belt and all movable parts- adjust as needed

d. Check all electrical parts – repairs need pre-approval

e. Check all hoses, fuel, water, gas, air, hydraulic - replace as needed

f. Check squeegees for wear - replace as needed

g. Check all engine parts - repairs need pre-approval

h. Check all brushes - adjust or replace as needed

i. Check hydraulic systems and repair as needed

j. Check safety devices such as, brakes, guards, switches and seat belts - repair as needed

k. Check articulating joints - repair need pre-approval

l. Check tires and casters - repair or replace as needed

FA9302-16-D-0008

Attachment 1 1 of 3

m. Check recovery tanks - clean as needed

n. Check and change all filters, fuel, or water

o. Check batteries - repairs need pre-approval

p. Replace seals and gaskets as needed

q. Test-run and make adjustments as needed each time machine is worked on

r. Check clutches and transmission – repairs need pre-approval

s. Full service to include replacing parts that are beyond economical repair with new

t. Contractor shall comply with all Federal and State applicable codes, Edwards Air

Force Base Environmental regulations, in addition to current industry standards.

When notified of remedial maintenance descrepancies the contractor shall be equipped to be prepared to cover an array of repair scenarios.

3. WORK LOCATION:

The work to be accomplished is located within the 412th Maintenance Group complexes, Edwards AFB, California 93524.

4. HOURS OF WORK:

The hours of work shall be from 7:00 AM to 4:00 PM, Monday through Friday, excluding federal holidays.

5. DAMAGES:

Any government or privately owned property damaged by the contractor shall be replaced or repaired immediately by the contractor at no expense to the government.

6. GOVERNMENT FURNISHED ITEMS:

Water and electricity will be furnished to the contractor by the government from existing systems outlets at no cost to the contractor.

7. CONTRACTOR FURNISHED ITEMS:

The contractor shall be required to furnish trucks, ladders, tools and all related items necessary in the performance of this contract at no cost to the government.

8. SAFETY:

The contractor shall comply with all fire and safety regulations at Edwards AFB, in addition to Federal OSHA and Cal-OSHA.

9. QUALITY ASSURANCE:

The contractor shall be responsible for quality assurance. The assigned government inspector(s) shall evaluate and approve all work accomplished.

10. EXCESS MATERIAL:

All excess materials to include replaced batteries generated by the contractor shall be removed from the job site and disposed by the contractor.

Attachment 1 2 of 3

11. RESTRICTED AREA PERMITS:

The job site could be located within a restricted area. The contractor shall obtain security clearance for his personnel and equipment by submitting to 412 MXG/MXOLS, Facility office, the following; names of personnel, social security numbers, drivers license/vehicle numbers, and copy of current registration one week (seven calendar days) prior to commencing work. All operations within the restricted area shall be in strict accordance with AFTC Regulations.

12. PERFORMANCE PERIODS:

The total performance period for this job is 1 April 2016 through 30 Sep 2016.