Tower Cleaning Maintenance Questions and Answers response no 2.pdf
PDF 20 KB Posted
- Attached to
- Tower Cleaning Services-Nellis AFB, NV
- Solicitation number
- F1S0AX4263A001
About this file
This is a Questions and Answers document providing technical specifications for tower cleaning maintenance services at Nellis AFB. The document lists key equipment details including a 350-ton Trane Model HDWA chiller, though some information like serial numbers, pump specifications, cooling tower data plates, and boiler data tags are referenced as being in attached photos that are not visible in this document.
This Q&A appears to be response #2 in a series of questions and answers related to a small business set-aside solicitation for tower cleaning services at Nellis AFB, NV. The associated solicitation (F1S0AX4263A001) is for a multi-year contract with a base year plus 4 option years, under NAICS code 238220 with a $19M size standard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pump Info.jpg | JPG image | |
| Chiller Equipment Plate 1.jpg | JPG image | |
| Chiller Equipment Plate 2.jpg | JPG image | |
| Boiler.jpg | JPG image | |
| Nevada Wage Determination no 2015-5593 rev 27 SAM.gov.pdf | ||
| Tower Cleaning Q A Response.pdf | ||
| Wage Determination no 2015-5603 rev 25 SAM.gov.pdf | ||
| SOW - JSE NEL Tower Cleaning Option Contract_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tower Cleaning Maintenance Questions and Answers
• tonnage for the chillers
350 ton
• model and serial number for the chillers
Trane Model HDWA
Serial # in pictures
• Pumps - Horsepower, voltage info
See attached Photo
• Data plate picture for the cooling towers
• Data tag picture for the boilers
File details come from the government source that posted it. Updated .