STATEMENT OF WORK
PROJECT TITLE: Installation of Sun Shade
1. LOCATION: The work is to be accomplished directly behind the 36 MXS AGE Flight facility, Bldg. 18004, Andersen AFB, Guam in location of the maintenance line.
2. DELIVERY/SHIP TO LOCATION: All Sun Shade materials need to be shipped to DLA
Distribution San Consolidation and Containerization Point, Whse 30 25600 Chrisman Road
Tracy, CA 95376. From there, they will be forwarded to Andersen AFB, Guam.
3. PRIOR TO START OF WORK: Contractors will provide Civil Engineering an AF 103
Work Clearance Form specifying the method, details and means of assembling and installing the sunshade; being that this install will be permanent. Contractor must notify AGE Flight of the scheduled construction date well in advance. CE will need to conduct a site survey, labeling all underground utility lines such as electrical, telephone, water, gas and sewer that may be encountered during install. CE must ensure that all the necessary permits prior to the contractors digging are approved as well. Contractors are not allowed to take pictures of anything while within the restricted area.
4. REQUIREMENT: The contractor must provide the required tools, labor, materials, and equipment necessary to successfully assemble and install the sunshade. The AGE flight will remove and clear all obstructions within the construction site. The contractor will not move or push any Aerospace Ground Equipment which may be in the way and will arrange with the building custodian if space need to be cleared. The contractors will dig and install the necessary cement footings designated for installing the sunshade. Assembly of the sunshade will follow soon after the footings are cured. Lastly the contractors will inform the building custodian and
AGE Flight Chief on how to maintain and store the sunshade if needed/required. Furthermore, warranty documentation will also need to be clarified with the length of the warranty and the coverage of all supplies, materials and equipment associated with the sunshade. If the sunshade install is found to be fabricated/installed incorrectly IAW the submitted AF 103 and manufacturer instructions, or does not meet the intent, than the contractors will be held solely responsible for correcting all the deficiencies.
Other files
| File | Type | Posted |
|---|---|---|
| SUNSCREEN_ITEM_LIST.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .