UHC_redux_bid_form_Option_4_corrected.pdf

PDF 549 KB Posted

Attached to
Restore Exterior Envelope-NASM Udvar Hazy
Solicitation number
F19R010029
Issued by

About this file

Option 4 bid sheet

View the file

Other files

File Type Posted
UHC_redux_bid_form_Option_4.pdf PDF
am_29_am_1_RFI.pdf PDF
Extracted_pages_from_RFP_F19R010029_+_bid_form.pdf PDF
RFP_F19R010029_+_bid_form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 –Cost Proposal Submission Form

UHC Exterior Envelope & Roof Replacement – Solicitation F19R010018

BASE COST PROPOSAL SUBMISSION FORM

Roof, Clerestory, Upper Fuselage

Curtain Wall, Artifact Protection

Quantity Unit of

Measure Subtotal

Div. 1A General Conditions without

Access & Scaffolding

1 LS $

Div. 1B Access & Scaffolding $

Div. 2 Existing Conditions 1 LS $

Div. 3 Concrete 1 LS $

Div. 4 Masonry 1 LS $

Div. 5 Metals 1 LS $

Div. 6 Wood, Plastics and Composites 1 LS $

Div. 7 Thermal and Moisture Protection 1 LS $

Div. 8 Openings 1 LS $

Div. 9 Finishes 1 LS $

Div. 10 Specialties 1 LS $

Div. 11 Equipment 1 LS $

Div. 26 Electrical 1 LS $

Div. 27 Communications 1 LS $

Div. 28 Electronic Safety & Security 1 LS $

Div. 31 Earthwork

As-built Drawings 1 LS $

Allowances Total 1 LS $

SUBTOTAL 1 LS $

Overhead and Profit 1 LS $

Performance Bond 1 LS $

Base Cost Total

UHC Exterior Envelope & Roof Replacement – Solicitation F19R010029

OPTION 1 PROPOSAL SUBMISSION FORM; Excavate & waterproof east façade foundation; install metal counter flashing at top perimeter of new water proofing

Option 1 Quantity Unit of

Measure Subtotal

Div. 1A General Conditions without

Access & Scaffolding

1 LS $

Div. 1B Access & Scaffolding $

Div. 2 Existing Conditions 1 LS $

Div. 3 Concrete 1 LS $

Div. 4 Masonry 1 LS $

Div. 5 Metals 1 LS $

Div. 6 Wood, Plastics and Composites 1 LS $

Div. 7 Thermal and Moisture Protection 1 LS $

Div. 8 Openings 1 LS $

Div. 9 Finishes 1 LS $

Div. 10 Specialties 1 LS $

Div. 11 Equipment 1 LS $

Div. 26 Electrical 1 LS $

Div. 27 Communications 1 LS $

Div. 28 Electronic Safety & Security 1 LS $

Div. 31 Earthwork

As-built Drawings 1 LS $

Allowances Total 1 LS $

SUBTOTAL 1 LS $

Overhead and Profit 1 LS $

Option 1 Cost Total

Attachment 1–Cost Proposal Submission Form

OPTION 2 PROPOSAL SUBMISSION FORM; Install canopies at exit doors

Option 2 Quantity Unit of

1 LS $

Div. 1B Access & Scaffolding $

Div. 2 Existing Conditions 1 LS $

Div. 3 Concrete 1 LS $

Div. 4 Masonry 1 LS $

Div. 5 Metals 1 LS $

Div. 6 Wood, Plastics and Composites 1 LS $

Div. 7 Thermal and Moisture Protection 1 LS $

Div. 8 Openings 1 LS $

Div. 9 Finishes 1 LS $

Div. 10 Specialties 1 LS $

Div. 11 Equipment 1 LS $

Div. 26 Electrical 1 LS $

Div. 27 Communications 1 LS $

Div. 28 Electronic Safety & Security 1 LS $

Div. 31 Earthwork

As-built Drawings 1 LS $

Allowances Total 1 LS $

SUBTOTAL 1 LS $

Overhead and Profit 1 LS $

Option 2 Total

OPTION 3 PROPOSAL SUBMISSION FORM; Remove external Centria metal panel wall system and interior batt insulation beyond; Install a new metal panel wall system; including but not limited to batt insulation, exterior sheathing, air and vapor barrier, semi-rigid insulation board, sub-girts, panel assembly, flashings and copings.

Option 3 Quantity Unit of

1 LS $

Div. 1B Access & Scaffolding $

Div. 2 Existing Conditions 1 LS $

Div. 3 Concrete 1 LS $

Div. 4 Masonry 1 LS $

Div. 5 Metals 1 LS $

Div. 6 Wood, Plastics and Composites 1 LS $

Div. 7 Thermal and Moisture Protection 1 LS $

Div. 8 Openings 1 LS $

Div. 9 Finishes 1 LS $

Div. 10 Specialties 1 LS $

Div. 11 Equipment 1 LS $

Div. 26 Electrical 1 LS $

Div. 27 Communications 1 LS $

Div. 28 Electronic Safety & Security 1 LS $

Div. 31 Earthwork

As-built Drawings 1 LS $

Allowances Total 1 LS $

SUBTOTAL 1 LS $

Overhead and Profit 1 LS $

Option 3 Total

Quantity Unit of

1 LS $

Div. 1B Access & Scaffolding $

Div. 2 Existing Conditions 1 LS $

Div. 3 Concrete 1 LS $

Div. 4 Masonry 1 LS $

Div. 5 Metals 1 LS $

Div. 6 Wood, Plastics and Composites 1 LS $

Div. 7 Thermal and Moisture Protection 1 LS $

Div. 8 Openings 1 LS $

Div. 9 Finishes 1 LS $

Div. 10 Specialties 1 LS $

Div. 11 Equipment 1 LS $

Div. 26 Electrical 1 LS $

Div. 27 Communications 1 LS $

Div. 28 Electronic Safety & Security 1 LS $

Div. 31 Earthwork

As-built Drawings 1 LS $

Allowances Total 1 LS $

SUBTOTAL 1 LS $

Overhead and Profit 1 LS $

OPTION 4 PROPOSAL SUBMISSION FORM; Replacement of existing Kalwall with all new

Option 4 Cost Total

Option 4

BASE BID & ALL OPTIONS BID FORM

Base Bid & All Options Quantity Unit of

1 LS $

Div. 1B Access & Scaffolding $

Div. 2 Existing Conditions 1 LS $

Div. 3 Concrete 1 LS $

Div. 4 Masonry 1 LS $

Div. 5 Metals 1 LS $

Div. 6 Wood, Plastics and Composites 1 LS $

Div. 7 Thermal and Moisture Protection 1 LS $

Div. 8 Openings 1 LS $

Div. 9 Finishes 1 LS $

Div. 10 Specialties 1 LS $

Div. 11 Equipment 1 LS $

Div. 26 Electrical 1 LS $

Div. 27 Communications 1 LS $

Div. 28 Electronic Safety & Security 1 LS $

Div. 31 Earthwork

As-built Drawings 1 LS $

Allowances Total 1 LS $

SUBTOTAL 1 LS $

Overhead and Profit 1 LS $

Base Bid & All Options Total