Appendix_5_annotated.docx

DOCX document 23 KB Posted

Attached to
RFP for Consolidated Administrative Facility
Solicitation number
F18R010038
Issued by

About this file

Appendix 5

View the file

Other files

File Type Posted
CAHI_NDA.v1_(provided_to_OCon_2018.10.05)_(002).docx DOCX document
38_am_2_FINAL.pdf PDF
NDA_CAH.pdf PDF
38_mod_1.pdf PDF
Appendix_3_Cabling_Standards.pdf PDF
Appendix_1_Codes_Stds_and_Guidelines.pdf PDF
Appendix_2_Access_Control_Handbooks.pdf PDF
RFP_F18R010038.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix 5 COST PROPOSAL WORK SHEET—RFP for CONSOLIDATED ADMINISTRATIVE HEADQUARTERS

1. Purchase Offer for {Property Address}Comment by Errickson, Eve: Please provide cost information related to your purchase offer in Section 1.
Total Base CostComment by Errickson, Eve: Purchase offer for base building, unimproved
Total Build outComment by Errickson, Eve: Estimated cost to improve base building per RFP
Annual Operating Costs (25 years)
Rebates, Credits, et cetera
Assigned lease incomeComment by Errickson, Eve: Lease income, if applicable, based on estimates described in Section 4 of this Appendix
Net Present ValueComment by Errickson, Eve: Net Present Value = (Total Base Cost) + (Total Build Out) + (Total Operating Costs)–(Rebates and Credits)–(Assigned Lease Income).
RSFComment by Errickson, Eve: RSF = Net Present Value/Square Footage
Purchase Offer—Portion 1
100.00
25.00
1.00
-5.00
10.00
$155.00
1.55
2. Preliminary Assessment & Test Fits for {Property Address}Comment by Errickson, Eve: Please include costs required to build out the headquarters facility. This information should be reflected in Section 1, as part of ‘Total Build Out.’
Test fits
Preliminary Assessment (Environmental, Historic Preservation)
Design/Concept
Build/Temporary
Total
RSF
Purchase Offer—Portion 1
5.00
2.50
5.00
12.50
$25.00
.25
3. Leasing for {Property Address}Comment by Errickson, Eve: Please provide cost information related to leasing a dependent part of a facility in Section 3.
Total Rent
TI Allowance
Annual Operating Costs
Rebates, Credits, et cetera
Utilities
Net Present Value
RSF

Lease Offer – Portion 2

Option 1

Option 2

Option 3

Option 4

TOTAL

4. Assignment Estimates for {Property Address}Comment by Errickson, Eve: If necessary, please provide estimated value, costs, and information related to leases assignable to the Smithsonian, if they are referenced in your proposal. This information should be reflected in Sections 1 under “Assigned Lease Income” and Section 6, under “Assigned Lease Income.”
Rebates, Credits
Receivable rental income
Net Present Value
RSF
5. Preliminary Assessment & Test Fits for {Property Address}Comment by Errickson, Eve: Please provide cost information related to tenant improvements associated with a portion of a facility described in Section 3. This information should be reflected in Section 3, under “TI allowance.”
Test fits
Preliminary Assessment (Environmental, Historic Preservation)
Design/Concept
Build/Temporary
Total
RSF

Lease Offer—Portion 2

TOTAL

6. Overall Offer for {Property Address}Comment by Errickson, Eve: Section 6 should include information set out in Sections 1, 3, and 4.
Base & Improvements or Assignment terms
Annual Operating Costs
Assigned lease income (total)
Relevant credits, rebates or savings
Net Present Value
RSF

Purchase Offer—Portion 1

Lease Offer—Portion 2

TOTAL Comment by Errickson, Eve: Please be advised that modifications to this form are subject to the Smithsonian’s sole discretion.