F17SOL10055_am_3.pdf
PDF 10 MB Posted
- Attached to
- RFP F17SOL10055 for NMNH West Court Improvements
- Solicitation number
- F17SOL10055
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOL_55_am_4.pdf | ||
| RFIs_West_Court_10_18.xlsx | XLSX spreadsheet | |
| F17SOL10055_am_2.pdf | ||
| F17SOL10055_mod_1.pdf | ||
| F17SOL10055.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
F17SOL10055
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
OCON
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
SMITHSONIAN INSTITUTION
150010809/13/20170003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/13/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Questions submitted as of October 18, 2017 and answers thereto are incorporated into the
RFP.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Thomas Dempsey
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Smithsonian Institution
Office of Planning Design & Construction
PROJECT: NMNH West Court Renovation
SOLICITATION: F17SOL100055
LAST UPDATED: 10/18/2017
SI RFI # Bidder RFI # Date Submt'd Company
Project #
QA#
Request for Information SF Response
S001 9/19/2017 Forrester 1
Is there a survey for hazardous materials? Please provide.
A full survey was not completed in anticipation of this project.
Included in response to this question is the survey completed at the existing window opening at column line J-K x 9, part of Bid Option B.4.
(PDF attachment 15435-Cafeteria Bulk Sample Rpt.pdf)
2 SF1442-13.b says that an offer guarantee is not required. RFP-52.228-
S0014 requires. Please clarify.
An offer guarantee is not required.
3 SF1442-12.a says that p&p bonds are not required. RFP 52.228-S0081 requires. Please clarify.
Performance and Materials Bonds are required for this project.
4 SF1442-13.a shows 3:00pm as the time of the bid; however, the time of bid, as advertised at fbo, is listed as 2pm. Please confirm that 3pm is the correct bid closing time.
3 pm is the correct time.
Is a site visit scheduled?
Please see the updated notice.
Please provide wage scale rates, if applicable.
The wage determination will be General Decision Number DC170002.
Please note that the wage determination current at the time of bid shall control. Please monitor https://www.wdol.gov/dba.aspx
S002 9/22/2017 Forrester 1 Please confirm that the hard copies of the Technical and Cost Proposals (as described in Sections L.4c-e of the RFP) can be hand delivered on the day following the electronic transmission.
Confirmed
2 ‘Key Personnel and Subcontractors’ in the RFP requests a resume for the CQC Representative. Does this need to be a dedicated CQC
Representative or can this individual assist in other responsibilities as well?
No, this must be a dedicated CQC Representative. See Specification
Section 014000, Part 1.7, Paragraphs I through M.
3 ‘Past Performance’ in the RFP indicates to provide 3 projects of similar size and complexity completed within the last five years. Can this time period be extended to the last ten years?
Yes
S003 9/28/2017 Forrester 1 According to the SF1442, 13.b., an offer guarantee is not required.
However, RFP Section I, page 27, Bid
Guarantee and Bonds, states that a 20% bid guarantee is required. Please clarify.
No bid bond is required.
PROJECT: NMNH West Court Renovation
SOLICITATION: F17SOL100055
LAST UPDATED: 10/18/2017
SI RFI # Bidder RFI # Date Submt'd Company
Project #
QA#
Request for Information SF Response
2 Please provide the following plans associated with Volume 2: M_3_01 -
HVAC Sections; M_3_02-HVAC Sections; and M_5_03-HVAC Details.
Please see attached.
S004 10/10/2017 Grunley 1 1. Please clarify if a fiscal year funding breakdown will be required with the price proposal. Please issue that additional bid form if required.
No fiscal year funding breakdown is required for this project
2 2. Section L.2. Key Personnel and Subcontractors requests resumes for subcontractors' personnel for critical areas of the work. 1) Please clarify which subcontractor personnel positions require resumes. 2) Please confirm which trades are considered critical areas of work.
GC shall submit the names of all subcontractors they plan to utilize.
GC to determine the most critical elements of work and submit project experience and resumes of key personnel for those subcontractors. Obvious critical elements include but are not limited to demolition, mechanical including HVAC and plumbing, electrical including fire alarm and security, food service equipment installation, and interior fit out.
3 3. Specification Section "27 15 00 "Communications Horizontal Cabling
"Listed on TOC but not provided. Please issue this specification.
See specification provided with this amendment.
4 4. Drawing A-5-00A - Listed on TOC but not provided. Please issue this drawing.
Drawing not included in bid set.
5 5. Drawing A-5-01A - Listed on TOC but not provided. Please issue this drawing.
Drawing not included in bid set.
6 6. Drawing M-3-01 - Listed on TOC but not provided. Please issue this drawing.
Drawing not included in bid set. See corrected G-003 and G-003A under previous amendment.
7 7. Drawing M-3-02 - Listed on TOC but not provided. Please issue this drawing.
Drawing not included in bid set. See corrected G-003 and G-003A under previous amendment.
8 8. Drawing M-5-03 - Listed on TOC but not provided. Please issue this drawing.
Drawing not included in bid set. See corrected G-003 and G-003A under previous amendment.
9 9. Drawing FPD-1-04 - Listed on TOC but not provided. Please issue this drawing.
This drawing is not included in the bid set. See updated sheets G-004 and G-
004A.
10 10. Drawing FP-1-B1 - Listed on TOC but not provided. Please issue this drawing.
Drawing is provided. See Volume 2 sheet 152 of 238.
11 11. Drawing FP-1-G1 - Listed on TOC but not provided. Please issue this drawing.
Drawing is provided. See Volume 2 sheet 153 of 238.
12 12. Drawing FP-1-04 - Listed on TOC but not provided. Please issue this drawing.
This drawing is not included in the bid set. See updated sheets G-004 and G-
004A.
13 13. Drawing TY-5-05 - Listed on TOC but not provided. Please issue this drawing.
This drawing is not included in the bid set. See updated sheets G-004 and G-
004A.
14 14. Reference Tube Steel Framing for the Servery Structure on A402 and
A512 - A514. Please provide sizes of tube steel members.
HSS 5x5x.25
PROJECT: NMNH West Court Renovation
SOLICITATION: F17SOL100055
LAST UPDATED: 10/18/2017
SI RFI # Bidder RFI # Date Submt'd Company
Project #
QA#
Request for Information SF Response
15 15. Reference Renovation Keynotes on A1G1. Please confirm that Keynote
15 along the walls should actually be Keynote 5.
Keynote 15 should read Keynote 1. Please see revised sheet attached to this amendment.
16 16. Reference Spec Section 055000 - Metal Fabrications. Please confirm that pipe guards and cast iron wheel guards are part of this project. If required, please clarify the locations.
Cast iron wheel guards and pipe guards are not included as part of this project. Disregard the reference in Spection 05 50 00
17 17. Reference Keynote 5 (Acoustical Spray Treatment) on A300, A301, A711, and A712. Please provide a specification for this material.
Specifiction attached
18 18. Door #CW-B44.1 drawing A-1-B2 has note 23 “New Overhead Coiling
Door” but the Door Schedule has “Overhead Coiling Grille”. Please confirm.
Door CW-B44.1 is an Overhead Coiling Door.
September 06, 2017 OFEO Project No. 1500108 / EC 20160493 Bid Set Page 1 of 11
COMMUNICATIONS HORIZONTAL CABLING 27 15 00 - 1
SECTION 27 15 00 - COMMUNICATIONS HORIZONTAL CABLING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Related documents
2. Description
3. Performance requirements
4. UTP cable and hardware
5. Coax cable and hardware
6. Cabling system identification
1.2 RELATED DOCUMENTS
A. Section 27 05 00 Common Work Results For Communications
1.3 DESCRIPTION
A. Horizontal cable and its connecting hardware provide the means of transporting signals between the telecommunications outlet/connector and the horizontal cross-connect located in the communications equipment room. This cabling and its connecting hardware are called the "permanent link".
B. The maximum allowable “horizontal link” cable length is 295 feet. This allows for an extra 33 feet for the entire channel length of 328 feet. The 33 feet provides for the maximum length of 16 feet to the workstation equipment, 7 feet or in the horizontal cross-connect, and 10 feet for a service loop in the telecommunications room.
1.4 TOPOLOGY
A. The horizontal cabling shall be installed using a star topology, typically extending from centralized TRs to individual TOs (drop-sets) in work areas (WAs).
B. The cabling system shall provide (A MINIMUM OF TWO) cabling runs to the drop-set in each office/workspace. All runs will terminate in designated TRs. No run shall exceed 90 m (295 ft), as measured from the cable termination point at each end. An additional 10 m (33 ft) is allowed for cordage at both ends, for a maximum allowable end-to-end or channel length of 100 m (328 ft).
C. HORIZONTAL CABLES
Bid Set Page 2 of 11
1. All horizontal copper cabling being used as voice, data, and/or analog signals shall be CAT-6A rated.
2. The 4-pair balanced twisted-pair cables shall be available in Bonded pair and non- Bonded pair configurations. The characteristics listed below shall apply to both configurations.
3. The cables will be available in plenum (CMP), non-plenum (CMR), low smoke zero halogen (LSOH/LSZH), and limited combustible (LC) versions. The minimum recommended installation temperature shall be 5 °C (40 °F). The temperature rating shall be 60 °C (140 °F).
4. The cable conductors shall be 23 AWG solid copper.
5. The effective cable OD shall be 5.45 mm (0.215 in) for CMR-rated cable and 5.33 mm
(0.21 in) for CMP-rated cable. The effective cable OD is the diameter of a six-around-one cable bundle divided by 3.
6. The minimum bend radius shall be 25 mm (1 in) for CMR-rated cable and CMP-rated cable.
7. The guaranteed values for the primary transmission characteristics of the cable are as follows:
a. Maximum DC resistance (at 20 °C) 9.38 ohms/100 m (328 ft)
b. Maximum DC resistance unbalance 5 %
c. Maximum mutual capacitance 5.6 nF/100 m (328 ft)
d. Maximum capacitance unbalance
(pair to ground) 330 pF/100 m (328 ft)
e. Maximum propagation delay skew 25 ns/100 m (328 ft)
f. NVP – plenum 72% @ 10 MHz
g. NVP – non-plenum 68% @ 10 MHz
DC = Direct current NVP = Nominal velocity of propagation
D. HORIZONTAL CABLE INSTALLATION
1. Horizontal cables shall be installed in accordance with standards-based recommendations, the manufacturer’s recommendations/installation guides, and industry best practices.
2. All horizontal cabling will be installed in 1” EMT conduit from the wall outlet 1900 style back box, vertically up into the plenum, and stubbed into the basket tray. All 1” conduits that are stubbed into the basket tray shall have a nylon bushing installed at the end of the conduit.
3. A plastic or nylon pull cord with a minimum test rating of 90 kg (200 lb) shall be co-installed with the cable in any conduit.
4. Cable raceways shall not be filled greater than the TIA/EIA-569-B recommended maximum fill for the particular raceway type, or 40%.
5. Cables shall be installed in continuous lengths from origin to destination. An exception is made for one CP in any cabling run.
6. Where cables are installed in an air return plenum, any non-plenum cable shall be installed in metallic conduit.
7. If CPs are used, they shall be placed in accessible locations and housed in enclosures intended and suitable for that purpose.
Bid Set Page 3 of 11
8. If a J-hook or trapeze system is used to support cable bundles, all horizontal cables shall be supported at every 1.2 m to 1.5 m (48 in to 60 in) intervals. It is recommended that the support surface is rounded without any sharp edges and at least 2 inches wide. At no point shall cable(s) rest on acoustic ceiling grids or panels.
9. Horizontal cables shall be bundled in groups of no more than 50 cables. Cable bundle quantities in excess of 50 cables may cause deformation of the bottom cables within the bundles, which will degrade the performance of those cables.
10. Cable shall be installed above fire-sprinkler systems and shall not be attached to such systems or any associated ancillary equipment or hardware. The cabling system and its associated pathways shall be installed so that they do not obscure any valves, fire alarm conduit(s), boxes, or other control devices.
11. Cables shall not be attached to ceiling grid or lighting fixture wires. Where support for horizontal cable is required, the Vendor shall install appropriate carriers to support the cabling.
12. Any cable damaged or exceeding recommended installation parameters during installation shall be replaced by the Vendor prior to final acceptance at no cost to the owner of the Belden IBDN 10GX System.
13. Cables shall be identified by a self-adhesive label in accordance with Section 27 05 53 of this document and TIA/EIA-606-A. The cable label shall be applied to the cable behind the faceplate, on a section of cable that can be accessed by removing the cover plate.
14. Balanced twisted-pair cable shall be installed so that there are no bends smaller than 4 times the OD of the cable at any point in the run or at the termination points.
15. The pulling tension on any 4-pair balanced twisted-pair cable shall not exceed 110 N (25 lbf).
PART 2 - PERFORMANCE REQUIREMENTS
2.1 GENERAL
A. Install plenum cable in environmental air spaces, including plenum ceilings.
B. Horizontal cabling system shall comply with transmission standards in TIA/EIA-568-C.1 when tested according to test procedures of this standard.
C. Surface-Burning Characteristics: Comply with ASTM E 84; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.
1. Flame-Spread Index: 25 or less.
2. Smoke-Developed Index: 50 or less.
D. Listed and labeled by an NRTL acceptable to authorities having jurisdiction as complying with UL 444 and NFPA 70 for the following types:
1. Communications, General Purpose: Type CM or CMG.
2. Communications, Plenum Rated: Type CMP, complying with NFPA 262.
3. Communications, Riser Rated: Type CMR, complying with UL 1666.
4. Communications, Limited Purpose: Type CMX.
Bid Set Page 4 of 11
5. Multipurpose: Type MP or MPG.
6. Multipurpose, Plenum Rated: Type MPP, complying with NFPA 262.
7. Multipurpose, Riser Rated: Type MPR, complying with UL 1666.
E. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
F. Provide cable, patch cords and hardware solutions matched and coordinated by the manufacturers. Cables shall be terminated and patched with connecting hardware of same category or higher.
G. Provide cables with imprinted cable type, length, category and/or strand count.
H. Provide cable and hardware for the number of cables terminated on the block or housing, plus 25 percent spare. Integral with connector bodies, including plugs and jacks.
2.2 UTP CABLE AND HARDWARE
A. Provide CAT-6A 100-ohm, four-pair UTP cable.
1. Color: See drawings for specifications.
B. Connecting Hardware:
1. Terminate TIA-568B
2. Provide modular connecting blocks and patch panels with 110-style IDC punch-down caps or crimp tools.
3. Patch panels to have clear window displays covering outlet labels.
4. Jacks and Jack Assemblies: 100-ohm, balanced, modular, color-coded, four-pair, eight-position units with integral IDC-type terminals.
5. Workstation Outlets:
a. Two port-connector assemblies mounted in single-gang faceplate.
b. High impact plastic with clear label lens.
c. For use with snap-in jacks accommodating any combination of UTP, optical fiber, and coaxial work area cords.
d. Flush mounting jacks, positioning the cord at a 45, or 90-degree angle.
e. Black blanks are to be installed in any patch panel, faceplate, or fiber enclosure as required.
6. Faceplates
a. The faceplate housing the modular connector assemblies shall provide a symmetrically centered appearance for the modules.
b. The faceplate housing the modular connector assemblies shall have no visible mounting screws.
c. The faceplate housing the modular connector assemblies shall have built in labeling windows to facilitate outlet identification.
Bid Set Page 5 of 11
7. Connectors
a. The modular connector assemblies using MDVO or KeyConnect modules to terminate the 4-pair balanced twisted-pair cable shall have the characteristics listed below.
b. The connectors shall be modular in form, with available mounting options for drop-sets, rack-mount copper panels, and wall-mount panels. The dimensions of the connectors shall not exceed:
1) 20 mm (0.79 in) in height.
2) 17 mm (0.67 in) in width.
3) 40 mm (1.57 in) in depth.
c. The connectors shall use an encapsulated lead frame technology ensuring long-term reliability as well as stable transmission performance.
d. The connectors shall use a plastic element to position and hold each cable pair at a right angle to its corresponding IDC termination point.
e. The connectors shall incorporate crosstalk compensation and impedance matching circuitry ensuring additional NEXT, FEXT, insertion loss and return loss margin beyond minimum Category 6A requirements to guarantee transmission performance up to 625 MHz.
f. The transmission characteristics of a mated connection when measured at 100 MHz with Belden 10GX jacks shall be as follows:
Parameter Minimum Average
NEXT
40.6 dB
PSNEXT
62.0 dB
FEXT
49.8 dB
PSFEXT
46.9 dB
Insertion Loss
0.06 dB
Return Loss
16.0 dB
NEXT = Near-end crosstalk PSANEXT = Power-sum alien near-end crosstalk
C. Patch Cords:
1. Terminate T568B
2. Factory-made, four-pair cables terminated with eight-position modular plug at each end.
3. Patch cords shall have bend-relief-compliant boots and latch guards to protect against snagging.
4. Inventory and color at Contracting Officer Representative discretion.
Bid Set Page 6 of 11
2.3 COAX CABLE AND HARDWARE
A. Provide 75 ohm RG-6/U 2000MHz cabling.
2.4 SOURCE QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to evaluate cables.
B. Factory test UTP cables on reels according to TIA/EIA-568-C.2.
C. Factory-sweep test coaxial cables at frequencies from 5 MHz to 1 GHz. Sweep test shall test the frequency response or attenuation over frequency, of a cable by generating a voltage whose frequency is varied through the specified frequency range and graphing the results.
D. Cable will be considered defective if it does not pass tests and inspections.
E. Prepare test and inspection reports.
PART 3 - EXECUTION
3.1 INSTALLATION OF CABLES
A. Coordinate layout and installation of telecommunications cabling with Contracting Officer Representative telecommunications and LAN equipment and service suppliers.
B. Coordinate telecommunications outlet/connector locations with location of power receptacles at each work area.
C. Horizontal cabling shall contain no more than one transition point or consolidation point between the horizontal cross-connect and the telecommunications outlet/connector.
D. Bridged taps and splices shall not be installed in the horizontal cabling.
E. Splitters shall not be installed as part of the optical fiber cabling.
F. Install cables in pathways and cable trays except within consoles, cabinets, desks, and counters.
Conceal pathways and cables except in unfinished spaces.
G. Conceal conductors and cables in accessible ceilings, walls, and floors where possible.
H. Bundle, lace, and train conductors to terminal points without exceeding manufacturer's limitations on bending radii, but not less than radii specified in BICSI ITSIM, "Cabling Termination Practices" Chapter.
1. Install lacing bars to restrain cables, to prevent straining connections, and to prevent bending cables to smaller radii than minimums recommended by manufacturer.
Bid Set Page 7 of 11
I. Comply with NECA 1.
J. Comply with TIA/EIA-568-C.1.
K. Comply with BICSI ITSIM, Ch. 6, "Cable Termination Practices."
L. Consolidation points may be used only for making a direct connection to telecommunications outlet/connectors:
a. Do not use consolidation point as a cross-connect point, as a patch connection, or for direct connection to workstation equipment.
b. Locate consolidation points for UTP at least 49 feet from communications equipment room.
M. Secure and support cables at intervals not exceeding 30 inches and not more than 6 inches from cabinets, boxes, fittings, outlets, racks, frames, and terminals.
N. Do not install bruised, kinked, scored, deformed, or abraded cable. Do not splice cable between termination, tap, or junction points. Remove and discard cable if damaged during installation and replace it with new cable.
O. Cold-Weather Installation: Bring cable to room temperature before de-reeling. Heat lamps shall not be used for heating.
P. In the communications equipment room, install a 10-foot- long service loop on each end of cable.
Q. Open-Cable Installation:
1. Install cabling with horizontal and vertical cable guides in telecommunications spaces with terminating hardware and interconnection equipment.
2. Cable shall not be run through structural members or in contact with pipes, ducts, or other potentially damaging items.
R. Group connecting hardware for cables into separate logical fields.
S. Separation from EMI Sources:
1. Comply with BICSI TDMM and TIA-569-B for separating unshielded copper voice and data communication cable from potential EMI sources, including electrical power lines and equipment.
2. Separation between open communications cables or cables in nonmetallic raceways and unshielded power conductors and electrical equipment shall be as follows:
a. Electrical Equipment Rating Less Than 2 kVA: A minimum of 6 inches.
b. Electrical Equipment Rating between 2 and 5 kVA: A minimum of 12 inches.
c. Electrical Equipment Rating More Than 5 kVA: A minimum of 24 inches.
Bid Set Page 8 of 11
3. Separation between communications cables in grounded metallic raceways and unshielded power lines or electrical equipment shall be as follows:
a. Electrical Equipment Rating Less Than 2 kVA: A minimum of 2-1/2 inches.
b. Electrical Equipment Rating between 2 and 5 kVA: A minimum of 6 inches.
c. Electrical Equipment Rating More Than 5 kVA: A minimum of 12 inches.
4. Separation between communications cables in grounded metallic raceways and power lines and electrical equipment located in grounded metallic conduits or enclosures shall be as follows:
a. Electrical Equipment Rating Less Than 2 kVA: No requirement.
b. Electrical Equipment Rating between 2 and 5 kVA: A minimum of 3 inches.
c. Electrical Equipment Rating More Than 5 kVA: A minimum of 6 inches.
5. Separation between Communications Cables and Electrical Motors and Transformers, 5 kVA or HP and Larger: A minimum of 48 inches.
6. Separation between Communications Cables and Fluorescent Fixtures: A minimum of 5 inches.
3.2 IDENTIFICATION
A. Identify system components, wiring, and cabling complying with TIA/EIA-606-A.
1. Administration Class: 2.
2. Color-code cross-connect fields. Apply colors to voice and data service backboards, connections, covers, and labels.
3. Legend: Machine printed, in the field, using adhesive-tape label for plastic faceplates.
a. Data: D001, D002, etc.
b. Voice: V001, V002, etc.
c. CATV: C01, C02, etc.
d. Wall Phone: WP001, WP002, etc.
B. Using cable management system software specified in Part 2, develop Cabling Administration Drawings for system identification, testing, and management. Use unique, alphanumeric designation for each cable and label cable, jacks, connectors, and terminals to which it connects with same designation. At completion, cable and asset management software shall reflect as-built conditions.
C. Cable Schedule: Post in prominent location in each equipment room and wiring closet. List incoming and outgoing cables and their designations, origins, and destinations. Protect with rigid frame and clear plastic cover. Furnish an electronic copy of final comprehensive schedules for Project.
D. Cabling Administration Drawings: Show building floor plans with cabling administration-point labeling. Identify labeling convention and show labels for telecommunications closets, backbone pathways and cables, entrance pathways and cables, terminal hardware and positions, Bid Set Page 9 of 11 horizontal cables, work areas and workstation terminal positions, grounding buses and pathways, and equipment grounding conductors. Follow convention of TIA/EIA-606-A.
Furnish electronic record of all drawings, in software and format selected by Contracting Officer Representative.
E. Cable and Wire Identification:
1. Label each cable within 4 inches of each termination and tap, where it is accessible in a cabinet or junction or outlet box, and elsewhere as indicated.
2. Identification within Connector Fields in Equipment Rooms and Wiring Closets: Label each connector and each discrete unit of cable-terminating and connecting hardware.
Where similar jacks and plugs are used for both voice and data communication cabling, use a different color for jacks and plugs of each service.
3. Uniquely identify and label work area cables extending from the MUTOA to the work area. These cables may not exceed the length stated on the MUTOA label.
F. Labels shall be preprinted or computer-printed type with printing area and font color that contrasts with cable jacket color but still complies with requirements in TIA/EIA-606-A.
1. Cables use flexible vinyl or polyester that flex as cables are bent.
3.3 FIELD QUALITY CONTROL
A. Perform the following tests and inspections:
1. Visually inspect UTP cable jacket materials for NRTL certification markings. Inspect cabling terminations in communications equipment rooms for compliance with color-coding for pin assignments, and inspect cabling connections for compliance with
TIA/EIA-568-C.0.
2. Visually confirm Category 6A marking of outlets, cover plates, outlet/connectors, and patch panels.
3. Visually inspect cable placement, cable termination, grounding and bonding, equipment and patch cords, and labeling of all components.
4. Test UTP copper cabling for DC loop resistance, shorts, opens, intermittent faults, and polarity between conductors. Test operation of shorting bars in connection blocks. Test cables after termination but not cross-connection.
a. Test instruments shall meet or exceed applicable requirements in TIA/EIA-568- C.2. Perform tests with a tester that complies with performance requirements in "Test Instruments (Normative)" Annex, complying with measurement accuracy specified in "Measurement Accuracy (Informative)" Annex. Use only test cords and adapters that are qualified by test equipment manufacturer for channel or link test configuration.
B. UTP Performance Tests:
C. General
Bid Set Page 10 of 11
1. All terminated cabling runs shall be 100% tested for defects in installation and to verify cabling system performance under installed conditions according to the requirements found in the TIA/EIA-568-C series of standards. All pairs in each installed cable shall be verified prior to system acceptance. Any defect in the cabling system installation, including (but not limited to) cables, connectors, patch panels, and cordage shall be repaired or replaced in order to ensure 100% usability of all installed runs
2. Copper Channel Test
a. All balanced twisted-pair cable links shall be tested for basic continuity and length, as indicated below. Additional testing shall be performed to verify compliance with Category 6A performance for the parameters listed in Section 27 10 11.01.B of this document. The extent of testing shall be in accordance with the end-customer's testing requirements. Belden recommends 100% testing of permanent links for Insertion Loss, Return Loss, NEXT, PSNEXT and PSACRF. These tests are performed at the same time as the Continuity test using an automated tester, such as the Fluke DTX1800.
b. Continuity – Each pair in every installed cabling run shall be tested using a test set that detects and identifies opens, shorts, polarity and pair reversals, crossed pairs, and split pairs. The results shall be recorded as Pass/Fail (as indicated by the test set) and referenced to the appropriate cable identification number and circuit/pair number. Any fault shall be corrected and the run re-tested prior to final acceptance.
c. Length – Every installed cabling run shall be tested for installed length using a time domain reflectometer (TDR) device. The cable length shall not exceed 90 m (295 ft). The cable length shall be recorded, referencing the cable identification number and circuit/pair number.
d. Category 6A performance testing shall be done according to the published standards.
e. Test each outlet according to TIA/EIA-568-C.2
f. Wire map
3. Final Verification Tests: Perform verification tests for UTP systems after the complete communications cabling and workstation outlet/connectors are installed.
D. Document data for each measurement. Data for submittals shall be printed in a summary report that is formatted similar to Table 10.1 in BICSI TDMM, or transferred from the instrument to the computer, saved as text files, and printed and submitted.
E. End-to-end cabling will be considered defective if it does not pass tests and inspections.
1. Prepare test and inspection reports.
3.4 DEMONSTRATION
A. Train Contracting Officer Representative maintenance personnel in cable-plant management operations, including changing signal pathways for different workstations, rerouting signals in failed cables, and keeping records of cabling assignments and revisions when extending wiring to establish new workstation outlets. Include training in cabling administration software.
Bid Set Page 11 of 11
END OF SECTION
October 16, 2017 OFEO Project No. 1500108 / EC 20160493
Bid Phase Revision Page 1 of 3
09 83 16 I0517
SECTION 09 83 16 – ACOUSTIC FINISH SYSTEM
PART 1 – GENERAL
1.01 Section Includes
A. Sprayed cellulose finish system.
1.02 Related Items
A. Clips, hangers, supports, sleeves and other attachments to spray bases are to be placed by other trades prior to the application of sprayed insulation.
B. Ducts, piping, conduit or other suspended equipment shall not be positioned until after the applica-tion of sprayed insulation.
1.03 Submittals
A. Copy of manufacturer’s ISO 9001:2008 Certification.
B. Submit test reports indicating compliance with the following:
1. NRC values per ASTM C-423 conducted by a NVLAP certified testing laboratory:
Acoustic Spray Absorption Coefficients
Inches 125 HZ 250 HZ 500 HZ 1000 HZ 2000 HZ 4000 HZ NRC
0.75” .17 .58 .91 .89 .87 .84 .80
3. Flame Spread Index: 5 ASTM E-84/UL 723
4. Smoke Developed: 5 ASTM E-84/UL 723
5. Bond Strength
Acoustic Spray > 900 psf ASTM E-736
6. Compression Strength
Acoustic Spray > 600 psf ASTM E-761
7. Comply with IBC 803.3/2009 IBC 803.10 stability requirements for interior finishes.
C. Manufacturer’s written certification that product contains no asbestos, fiberglass or other man-made mineral fibers.
1.04 Quality Assurance
A. Manufacturer must have a current listing with Underwriters Laboratories (UL) Code Evaluation Re-port.
B. Manufacturer must be in compliance with the 2009 and 2012 International Building Code.
C. Manufacturer must be ISO 9001:2008 Certified.
D. Applicator: Licensed by manufacturer.
E. Manufacturer must subscribe to independent laboratory follow-up inspection services of Underwriters
Laboratories. Each bag shall be labeled accordingly.
F. Mock-up: Apply a 100 square foot representative sample to be reviewed by the Architects and/or
Owner prior to proceeding.
Bid Phase Revision Page 2 of 3
1.05 Delivery, Storage and Handling
A. Deliver in original, unopened containers bearing name of manufacturer, product identification and reference to U.L. testing.
B. Store materials dry, off ground and under cover.
C. Protect liquid adhesive from freezing.
PART 2 – PRODUCTS
2.01 Basis of Design
A. SonaSpray fc Dura-K (3:1 Adhesive Ratio)- International Cellulose Corporation
12315 Robin Boulevard
Houston, Texas 77045
(713) 433-6701 or (800) 444-1252
FAX: (713) 433-2029
B. Approved equal by one of the following manufacturers:
1. K-13- International Cellulose Corporation
2. Acoustement 20- Pyrok
3. Sonacrete- International Cellulose Corporation
2.02 Materials
B. Color shall be tinted black as selected by the Architect.
PART 3 – EXECUTION
3.01 Examination
A. Examine surfaces and report unsatisfactory conditions in writing. Do not proceed until unsatisfactory conditions are corrected.
B. Verify surfaces to receive spray insulation to determine if priming/sealing is required to ensure bond-ing and/or to prevent discoloration caused by migratory stains.
3.02 Preparation
A. Provide masking, drop cloths or other satisfactory coverings for materials/surfaces that are not to re-ceive insulation to protect from over-spray.
B. Coordinate installation of the sprayed cellulose fiber with work of other trades.
C. Prime surfaces as required by manufacturer’s instructions or as determined by examination.
3.03 Installation
A. Average thickness to achieve NRC of 0.80 or greater.
B. Install spray applied acoustical finish according to manufacturer’s recommendations.
C. Cure material with continuous natural or mechanical ventilation.
D. Remove and dispose of over spray.
3.04 Protection
A. Protect finished installation under provisions of Division 1.
Bid Phase Revision Page 3 of 3
END OF SECTION
McKEON DOOR COMPANY Creative Solutions – Innovative Designs – Proven Products
February 20, 2013
Corporate Headquarters: 44 Sawgrass Drive, Bellport, NY 11713 • Tel 631-803-3000 • Fax 631-803-3030
California • Nevada • New York • Washington DC www.MckeonDoor.com
Seismic Performance
Each McKeon product is installed in accordance with NFPA 80. Each product is manufactured and installed in accordance with seismic standards as applicable in ASCE 7-05.
Seismic considerations of building structural components, lateral bracing, sway bracing, field conditions and engineering of the same are not the responsibility or within the scope of work of McKeon Door Company.
| FL_Series Drawings REV 2017_10_16.pdf |
| FL-1-B1 |
| FL-1-G1 |
| FL-1-01 |
| FL-1-02 |
File details come from the government source that posted it. Updated .