14-FS1-003_005_Bid_Sch.doc

DOC document 29 KB Posted

Attached to
REHAB PONDS 8, 9, 10 AT NEOSHO NFH
Solicitation number
F17PS00118
Issued by

About this file

Bid Schedule

View the file

Other files

File Type Posted
14-FS1-003_Dwgs_Ponds_9-10.pdf PDF
General_Decision_Number.docx DOCX document
14-FS1-005_Dwgs_Pond_8.pdf PDF
Sol_F17PS00118.pdf PDF
14-FS1-003_005_Ponds_8_9_10_Specs.pdf PDF
F17PS00118.rtf RTF text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00 4100

BID FORM

Standard Form 36, July 1966

General Services Ad – 30181RB 133 Fed Proc. Reg. (41 cfs) 1‑16.101

Name of Offeror or Contractor

Furnish all labor, tools, equipment, materials, superintendence and transportation necessary to construct the project descried in Block 10 of Page A1, Solicitation, Offer, and Award, Standard Form 1442 in accordance with the Technical Specifications, Drawings, and terms and conditions contained herein as follows:

Item No. Supplies/Services Quantity Unit Unit Price Total Amount Basic Contract Pond 8 Rehabilitation Item 1 Mobilization/Demobilization L.S.

Item 2 Site Preparation L.S.

Item 3 Demolition L.S.

Item 4 Construct New Pond Walls L.S.

Item 5 Construct New Flumes and Ramp L.S.

Item 6 Grade Pond Bottom L.S.

Item 7 Place Pond Liner Support Fill L.S.

Item 8 Install Geotextile

L.S.

Item 9 Install Pond Liner L.S.

Item 10 Backfill Pond Walls L.S.

Item 11 Landscaping L.S.

Item 12 Exploratory Excavation L.S.

TOTAL BASE BID $______________

Additive #1: Pond 9 Rehabilitation

Additive #2: Pond 10 Rehabilitation

TOTAL BASE BID and Addititives #1 & #2 $______________

Award of contract will be made in accordance with Section M, Clause M‑1 “Evaluation and Award.” Incomplete bids will be considered non-responsive. If estimated quantities are listed, Bidders must only bid estimated quantities listed. These quantities indicated are the Government’s best estimate of actual quantities needed to complete the work. Payment will be made for actual amount of work done on the basis of unit or lump sum prices listed.

Neosho NFH Ponds 8, 9 and 10 Rehab