(x)

F17SOL10027

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

OCON

Washington DC 20013-7012

MRC 1200

P.O. BOX 37012

OCON

OCON

Washington DC 20013-7012

MRC 1200

P.O. BOX 37012

SMITHSONIAN INSTITUTION

1500102_150011005/12/2017000006

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/12/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 6 incorporates the attached documents, as follows:

1) A final RFI log dated June 28, 2017;

2) S004 #9 Pages from 1500102 South Entrance Bid Specs Volume 2;

3) S008 #19 Bird Bath Photos; and

4) S009 #1 Revised Bid Form_NMNH Southside Improvements.

Addendum 2 to the drawings has been distributed separately and is incorporated herein by reference.

For the purposes of clarification, please note that the hyperlink to Amendment 2 on the fbo

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Thomas Dempsey

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

F17SOL10027/000006

page for RFP F17SOL10027 contains a typographical error. Additionally, the question set attached to Amendment 4 is incomplete. The final RFI log attached to this amendment 6 includes all questions and answers.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Smithsonian Institution

Office of Planning Design & Construction

PROJECT: 1500102 Renovate South Entrance

1500110 Baird AHU Replacement

SOLICITATION: F17SOL100027

LAST UPDATED: 6/29/2017 12:00 PM

SI RFI # Bidder RFI # Date Submt'd Company QA# Request for Information SF Response

S001 1 5/15/2017 Facility Support

Services, LLC

1 Since the combined project magnitude for both is $18M-$24M, can relevant projects under $10M be considered as acceptable “Past Performance” examples?

SI's intent is to award a project in the $18 to $24 million dollar range. Past performance needs to be in that range to be acceptable. Two $10 million dollar projects will not be acceptable to demonstrate adequate past performance.

2 Will receipt of the multi-year funding increments cause any anticipated delays in the project?

SI will award funding based on projected cash flow to eliminate any work stoppage.

Do not plan for any delays in construction due to multi-year funding.

3 Will projects that are not in the PPIRS system be acceptable? And if so, will offerors receive higher ratings for submitting past projects in the PPIRS system?

Projects not is PPIRS will be acceptable. No special rating or preference shall be applied for projects in PPIRS.

4 Will multiple task orders on the same project conducted simultaneously be considered acceptable as relevant total project cost?

Projects or task orders that were performed concurrently and proved to be physically related to each other shall be considered relevant for review.

5 Will the Baird AHU Replacement and NMBH Renovation projects be done simultaneously

All Base Contract work and Option work shall be performed within the specified project duration.

S002 1 6/2/2017 Forrester

Construction

1 The RFP states that all proposals will be submitted in pdf format through file sharing environments. Can you please provide detailed information on what those acceptable file sharing environments are and if there are any file size requirements.

Please use the sharing environment available to you. To confirm workability, please feel free to send us a link to a test file to confirm prior to the bid date. In the alternative, we can make a dropbox file available for you.

2 Please confirm that the Five (5) hard copies of the Technical and Cost Proposals can be hand-delivered on the day following the electronic transmission.

Confirmed

3 Please confirm that the Subcontracting Plan should be submitted with the Cost

Proposal package.

Confirmed

4 According to SF1442, 13.b, an offer guarantee is not required. However, RFP

Section I, page 28, requires a 20% bid guarantee. Please clarify.

No bid bond is required.

5 Please confirm that the Professional Liability Insurance coverage included in

Section I, page 32 of the RFP, does not apply to the Contractor but rather the

Designers of the project.

Confirmed

PROJECT: 1500102 Renovate South Entrance

1500110 Baird AHU Replacement

SOLICITATION: F17SOL100027

LAST UPDATED: 6/29/2017 12:00 PM

SI RFI # Bidder RFI # Date Submt'd Company QA# Request for Information SF Response

S003 2 6/5/2017 Forrester

Construction

1 The specifications of both South Entrance and the Baird Auditorium AHU

Replacement call for the structural steel fabricator and the structural steel erector to be AISC-certified companies. As the amount of the new structural steel work is minimal, can the requirement be modified to companies that follow and abide by the AISC guidelines for steel fabrication and erection?

No, the structural steel fabricator and the structural steel erector shall be AISC-certified companies as defined in the specifications.

S004 3 6/15/2017 Forrester

Construction

1 Please provide information on wage scale rates, if applicable. Use the current Davis Bacon wage rates published by the Department of Labor for the District of Columbia, Building classification (https://www.wdol.gov/) for the date when the bids are due.

2 Vol 2, S152: Please provide cut section through the retaining wall between the sloped concrete walls at ductbank. Does the retaining wall have a footing there?

What is the light gray stripe to the north of CL B shown on 1/S557?

There is no footing below the retaining wall at the duct bank location. The light gray stripe was a sidewalk element. A revised sheet deleting this graphic will be included in ADD-002.

3 Specification Section 055000-1.2 lists the banner hanging system, but does not include any further specification. Are there any manufacturers that can provide the system, or is it all custom?

The banner hanging system is a custom delegated design element. Additional performance requirements can be found on A 821.

4 Specification Section 129300: What is the finish of the custom granite bench? The custom granite bench is to be thermal finish on exposed surfaces. The AE team will resubmit spec section 129300 as part of ADD-002.

5 Specification Section 129300: We cannot find the bird bath on the plans. Please show, including any required foundations/attachment methods.

Bird Baths are included on drawings LP451 and LP452 with the designation Grn

Bath, which is an abbreviation for Granite Bird bath. The baths are to placed on compacted ground. No concrete footing or attachment is required.

6 Vol 1, AD202, Note 02-112 calls for removal and re-installation of the signs at the

Carriageway entrances. Note 10-43 on A213 calls for new signs. If new, please provide specification.

Carriageway entrance signs are new. Sign type A will be approximately 1'7" wide and 12" tall, typical of 2. Type A will have letters saying "CLEARANCE 10 FEET" with an arrow pointing down. Sign type B will be approximately 1'3" wide and 8" tall, typical of 2. Type B will have letters saying "CLEARANCE 7 FEET" with an arrow pointing right. Sign type C will be approximately 1'3" wide and 8" tall, typical of 2.

Type C will have letters saying "CLEARANCE 7 FEET" with an arrow pointing left. All signs will be metal similar to the current signage at the carriageway location.

Signage will be anchored at all four corners with stainless steel fasteners.

Contractor will be responsible for field verifying appropriate dimensions of signs.

Shop drawings and samples will be required. AE will provide applicable specification section and signage drawings as part of ADD-002.

PROJECT: 1500102 Renovate South Entrance

1500110 Baird AHU Replacement

SOLICITATION: F17SOL100027

LAST UPDATED: 6/29/2017 12:00 PM

SI RFI # Bidder RFI # Date Submt'd Company QA# Request for Information SF Response

7 Note on drawing S111 and 7/S501 call for inspection of CMU knee walls under granite pavers and replacing with concrete knee walls, if necessary. How can this work be quantified at bidding stage? Would it be possible to provide a quantity for all to include?

The original knee walls below the stone paver joints are multiwythe brick masonry, not CMU as stated in this question. For bidding purposes, assume half of the existing masonry walls below the steps will need to be replaced with concrete. This is approximately 13 meters (43 feet).

8 Vol 2 Specification Section 211316-3.4.C: Please designate on the plans which sprinkler heads are painted and need to be replaced.

This section is not referencing existing sprinkler system conditions. The intent of the specification section is to advise the contractor that any painted sprinkler shall be replaced at the contractor’s expense where any painting occurs and compromise’s a sprinkler of the new installation.

9 Vol 2 Specification Section 265619: Please provide legible specification. The printed specification section, 265619, LED Exterior Lighting, seems legible as does the PDF. A legible copy is attached for reference. SI will resubmit section

265619 as part of ADD-002.

10 Vol 2 Specification Section 280500-1.3: Please confirm par. 1.3 does not apply to this project.

For specification section 280500, Common Work Results for Electronic Security, paragraphs 1.3 A and 1.3 B are applicable. Paragraphs 1.3 C, 1.3 D, and 1.3 E are not applicable.

11 Baird Auditorium Specification Section 230901-2.1 and Section 230923-2.3: It seems that Siemens is the only manufacturer that can be used and all other acceptable manufacturers listed on par.2.1 cannot be considered. Please confirm.

Siemens shall be the only manufacturer.

S005 4 6/15/2017 Forrester

Construction

1 Section 050370 sub section 3.1-A, identifies a list of Historic Treatment Specialist

Firms that may provide historic decorative metal refinishing. However the listed firms Conservation Solutions, Inc. and Kreilick Conservation have declined to bid this project. Please provide a list of other firms/contractors that have been previously approved by COTR if any.

The Smithsonian will accept firms and staff that meet the qualifications identified in

Specification Section 050370, 1.10A-D, Quality Assurance. Note this information should also be included in the Historic Treatment Program submittal required per

0135914, Historic Treatment Procedures, 1.5B, Quality Assurance.

2 Our subcontractors are urgently requesting more time for the review of the documents and the opportunity to submit questions. Please consider extending the RFI period for at least two more weeks, until June 29.

The date for submitting questions shall be extended to 6/23/17.

3 Please provide a list of pre-approved security contractors. There is no pre-approved list. Acceptable Security Subcontractors shall meet the requirements of Specification Section 280500, 1.1 , Quality Assurance.

PROJECT: 1500102 Renovate South Entrance

1500110 Baird AHU Replacement

SOLICITATION: F17SOL100027

LAST UPDATED: 6/29/2017 12:00 PM

SI RFI # Bidder RFI # Date Submt'd Company QA# Request for Information SF Response

4 Spec section 104400: Please confirm that fire extinguisher cabinets are not applicable to this project.

Section 104400 is not application to this project. Spec section 104400 will be removed as part of ADD-002.

5 Spec section 129300 provides dimensions for the granite Bird Bath as

24”x24”x18”high. The listed manufacturer does not provide in these dimensions.

Please provide desired dimensions and quantity, as this is not shown on the plans.

Bird bath dimensions are nominal dimensions for the extents of the form of the bath. These are the desired dimensions and the two required are shown on LP451 and LP452 as “GRN BATH.” The intent is for this to be a solid (heavy) stone one piece bath.

6 Please confirm all key personnel outlined in the Solicitation and/or Contract

Documents should be dedicated to this project and cannot be shared with other on-going Smithsonian projects in the building.

All key personnel shall be dedicated to this project.

7 LS151, LS152: Please confirm that there are 4 retractable bollards in this project. There are 4 retractable bollards and 12 stationary bollards in the project. Drawings will be updated as part of ADD-002.

8 Vol 1, Details 1, 2 and 4 / S702 and detail 1/S703 indicate grout injection required at the vault. However the quantities are not quantified for pricing purposes as otherwise indicated on S701. Please clarify.

The assumed crack depth is the distance from the crown of the arch to the underside of the vaulted ceiling (approximately 305mm). The assumed width of the crack is the same as the width of the arches which equals the piers shown on 1S501

(457mm). Provide 54,000 mm of crack grout injection for the referenced details.

S006 5 6/15/2017 Forrester

Construction

1 Reference NMNH Renovate South Entrance Volume 1 Drawings Sheet AD111 |

Sheet Notes: states “Remove Existing Abrasive Strips. Typ. All Treads.” and references Ref details on A523. Sheet A523 is not included in the bid set. Please provide the missing sheet.

Sheet note 1 on AD111 will be revised in ADD-002 to say "SEE SHEET A533 FOR

DETAILS." These details are located on A533, which is included in the Bid Set.

S007 6/16/2017 Consigli 1 Are the prime contractor resumes included or excluded from the page count? Prime contractor resumes shall be included in the page count.

2 Are the subcontractor references and resumes included or excluded from the page count?

Sub contractor references and resumes shall be included in the page count.

3 Is the AIA A-305 included or excluded from the page count? AIA A-305 shall be excluded from the page count.

4 Please clarify what needs to be submitted within the Cost Proposal. Cost Proposal shall address all items in RFP section B, specifically see sections B.3, B3.1 and B3.2 for requirements

PROJECT: 1500102 Renovate South Entrance

1500110 Baird AHU Replacement

SOLICITATION: F17SOL100027

LAST UPDATED: 6/29/2017 12:00 PM

SI RFI # Bidder RFI # Date Submt'd Company QA# Request for Information SF Response

5 Please reference spec section 010000, 14.8. g states “All work must be coordinated so as not to interfere with the Museum’s Special Events Schedule and spring and summer month schedule. Normal museum off-hour and non-Special Event times are typically start of off-hours to 6:00 am, but may vary per special event.” Please provide the Museum’s special events schedule and spring and summer month schedule in order to incorporate into the schedule.

To help clarify the special events schedule please note the following: “Special

Events are primarily held in the evening after the museum is closed to the public and, therefore, have an impact on the night work schedule. There are approximately 180 Special Events held in the evening per year. The events may delay work start time from anywhere between 9:00pm to 12:00am/midnight. The periods of February through July, and September through December, are typically the most intense for Special Events. Some Special Events will preclude any construction work at all for the evening of the event. Coordination through COTR is required.”

6 In section 13.b of Form 1442 of the Solicitation indicates that an offer guarantee is not required, however section 52.228-S0014 on page 28 indicates it is required.

Please clarify if an offer guarantee is required for this bid.

An offer guarantee is not required

7 Does the Subcontracting Plan go in the Technical Proposal or Cost Proposal? Is it included in the page limit if in the Technical Proposal.

The subcontracting plan shall be included in the Technical Proposal and is included in page limit

S008 1 6/21/2017 Grunley 1 Please provide a list of the CQC Supplemental Personnel (Section L.2.B.) for which the Smithsonian Institution requires resumes.

GC is responsible for determining which CQC personnel are required in order to meet all CQC requirement listed in the specifications including those provided by

GC's own in house staff.

2 Please confirm that 11 x 17 size paper is acceptable for the CPM schedule and the

Organizational Chart.

11 x17 paper is acceptable if it folds into an 8 1/2 x 11 fold out

3 Section L.2.C. Workplan requires submission of subcontractor’s qualifications including project experience and resumes of key personnel for subcontractors performing "critical elements of work". Please define which trades are considered critical elements of work by the Smithsonian Institution. Please verify the number of subcontractors that are expected for each trade.

GC shall submit the names of all subcontractors they plan to utilize. GC to determine the most critical elements of work and submit project experience and resumes of key personnel for those subcontractors. Obvious critical elements include but are not limited to earthwork, sheeting, foundation micro piles, concrete, masonry, stone cleaning and restoration, metal railings, metal restoration

(optional security gate), electrical including FA and security, mechanical including

HVAC and plumbing, and landscaping.

4 Section L.2.C. Workplan requires submission of subcontractor’s qualifications for including project experience and resumes of key personnel for subcontractors performing "critical elements of work". Please verify the number of subcontractors that are expected for each trade.

See response to S008 - #3, above

PROJECT: 1500102 Renovate South Entrance

1500110 Baird AHU Replacement

SOLICITATION: F17SOL100027

LAST UPDATED: 6/29/2017 12:00 PM

SI RFI # Bidder RFI # Date Submt'd Company QA# Request for Information SF Response

5 Given the number of subcontractor qualifications that are required (18 trades) and the information that is being requested per trade, may this information be placed in an Appendix that does not count toward the 100 total pages? If multiple subcontractors are allowed for each trade, the subcontractor information alone could reach 100 pages.

This is acceptable. Provide only data for the subs that will be utilized. Multiple subs for each trade are not required.

6 Section L.3, Items B-F includes many multi-page documents including the A-305

(with attachments can exceed 30 pages), Financial Reports (20+ pages), etc. Can

Section L.3. Items B-F be provided in an appendix that does not count toward the

100 total pages?

A-305 shall be excluded from the page count.

7 Drawing A511 Volume 1 indicates (3) doors (Tag#'s V001, V008 & V009) that do not have door, frame & hardware designations on the door schedule. Please provide.

V008 and V009 will be removed from the schedule. They are not included in the project. V001 hardware is to be provided as part of the metal mesh partition system.

8 Please confirm that no parking will be provided by SI for the contractor on this project. The RFP indicates that (1) space will be provided.

One parking space will be provided located within the staging area - please reference specification section 01000-18.2. This parking is for the superintendent of the General Contractor in a marked Company vehicle. There will be NO subcontractor parking onsite.

9 Spec Section 081140 part 2.01 indicates (3) approved manufacturers for the bronze door assemblies, will other manufacturers be acceptable for this project if they can meet the performance requirements?

Yes, other manufacturers that meet the requirements will be accepted.

10 Please provide a specification section for the bronze windows that are indicated on the Volume 1 drawings.

There are no bronze windows on the project. Windows are steel, custom fabricated.

11 Drawing LS560 indicates providing a metal panels at columns but there is no specification section for these metal panels. Please provide.

See SECTION 057500 –DECORATIVE FORMED METAL. CUSTOM SS MTL PANEL refers to Metal column cladding mentioned in 057500 1.2 A.4.

12 Reference Option 2. Does the banner hanging system only go between the two columns shown on A821? Please clarify.

Banner hanging system extends to all 5 bays at the south entrance.

13 Please confirm that the new stone wall cladding at the accessible approach ramps is to be Lake Placid Granite.

Confirmed; the new stone wall cladding at the accessible approach ramps is to be

Lake Placid Granite. See sheet L051 for legend, including materials. See LS200 series sheets for elevations.

14 Reference the security bollards shown on LS150 thru LS152. Please confirm that the thirty-four (34) existing security bollards along Madison Drive are to remain.

Confirmed; the thirty-four (34) existing security bollards along Madison Drive are to remain.

15 Reference the security bollards shown on LS150 thru LS152 and LS551. Please confirm that the project requires ten (10) Fixed Bollards and four (4) Manual

Operable Bollards.

Confirmed; the project requires ten (10) Fixed Bollards and four (4) Manual

Operable Bollards.

PROJECT: 1500102 Renovate South Entrance

1500110 Baird AHU Replacement

SOLICITATION: F17SOL100027

LAST UPDATED: 6/29/2017 12:00 PM

SI RFI # Bidder RFI # Date Submt'd Company QA# Request for Information SF Response

16 Section L.2C of the RFP indicates providing subcontractor references for key trades.

One of those trades is "Structures" which is a unclear description as to what trades you are referring to for this category. Please confirm if you are requirement both

Steel and Concrete references for this section.

See the response to S008-03 above

17 Please confirm that the museum storage during construction shown on drawing

G008 will be provided by the owner and not the contractor.

The Museum storage containers will be provided by the Owner and will be onsite at the beginning of the project.

18 Please confirm if the dimensional letters shown on LS255, LS256, LS354, and LS553

"Smithsonian Institute, National Museum Natural History" are existing and to remain.

Incorrect; the walls and cladding are new. The text shall be inscribed on the new stone cladding per specifications; see 044200 2.8.H. Smithsonian COTR will provide the digital files for the creation of the wall text.

19 Please provide location of bird bath reference in spec section 129300 part 2.4. East bird bath is 8740 (28’-6”) east of Column Line 14 and 2140 (7’-0”) south of

Column Line B.West bird bath is 9250 (30’-0”) west of Column Line 3 and 2090 (6’-

10”) south of Column Line B. They are labeled as GRN BATH on LP451 and LP452.

The intent is to match other existing bird baths on-site. Photos of the existing baths are included for reference

20 Please provide information for the signage referenced on Note 10-43 shown on

A213.

Signage will be new. Updated drawings and specifications to be included in the addendum.

21 Drawing AD202 indicates that signage at the carriage way is to be removed and reinstalled. Drawing A213 indicates that the signage at the carriageway is new.

Please clarify.

Signage will be new. Updated drawings and specifications to be included in the addendum. See question S004-6

22 For the South Entrance, main doors, detail G1 / AD201 and site photos indicate or ornamental paneling above a row of glass panes at the Level 2 elevation. Detail C1

/ drawing A511 indicates a set of glass panes at this same location (ETR). Please confirm if there are glass panes behind the ornamental panels or is detail C1 / A511 incorrect?

There are glass panels behind the ornamental panels.

23 Please confirm if the bird netting at the security gate shown on drawing A812 is part of Option 1 or part of the base bid?

All bird netting is part of the base bid.

24 In reviewing the site phasing, please confirm that the South Entrance will be closed for public use during construction other than for emergency egress.

No, the South Entrance will not be closed for the public use during the construction.

Sheet G007 note SN-03 calls for a clear access from the Rotunda at all times with a minimum width of 2700mm. The only times the building may be closed are noted in spec section 01000-14.13. The South Entrance will remain open to the public. GC shall phase work to accommodate egress.

PROJECT: 1500102 Renovate South Entrance

1500110 Baird AHU Replacement

SOLICITATION: F17SOL100027

LAST UPDATED: 6/29/2017 12:00 PM

SI RFI # Bidder RFI # Date Submt'd Company QA# Request for Information SF Response

25 Please confirm if sidewalk closure permit costs on Madison Ave. are to be included in the contractor's price as indicated per Spec Section 010000-22.

Yes. Closure permits are required as needed to accommodate GC means and methods

26 The sheeting & lagging at column line 13 runs close to an existing steam tunnel.

Can you please confirm the depth of where the top of the steam tunnel is?

The castle tunnel located adjacent to column line 13 runs below the bottom of existing retaining wall footing at a maximum elevation of 2.694m. It is possible that this tunnel is lower than this elevation. Contractor to verify elevation in field.

27 Please confirm that use charges for utilities at the contractor's construction trailer must be included in the contractor's proposal and are not provided by the owner as indicated per spec section 10000-38.

Owner provides water and electricity for the Contractor's use. GC responsible for all shutdowns and infrastructure to accommodate their work plan, which shall be coordinated and approved by the COTR.

28 Temporary Doors indicated on drawing A-600B do not have hardware sets indicated on the door schedule. Please provide sets required.

Provide hardware set 1 for each of the two temporary doors on the schedule.

Turnover hardware to COTR once temp doors are removed.

29 Please confirm that the mockups indicated in spec section 010000 part 49 are part of permanent construction or are offsite / non-permanent construction mockups?

Mock-ups may be part of permanent construction where practical for construction, observation, and timeline purposes.

30 Is the contractor responsible for provide a vibration consultant (SCVC) for this project or will this be provided by the owner?

The Smithsonian will provide the SCVC, the Vibration Consultant responsible for monitoring vibrations. Division 01000 66.1.6 incorrectly states “Contractor shall engage a vibration consultant….” This will be corrected in Addendum 2 to say “SI shall engage a vibration consultant.”

31 Please confirm that the COTR trailer shown on drawing G057 is not to be provided by the contractor.

The COTR trailer is existing to remain and identified for information only

32 Spec Section 087100 part 2.2 indicates that the locksets & cylinders must be Yale

(no substitutions). Will other manufacturers be acceptable if they can meet the specified requirements?

No substitutions are accepted for the locksets and cylinders.

33 Door 105A,107A,107B and 108A are called to meet Blast Criteria. Ellison Bronze

(approved manufacturer per specifications) does not make an actual Blast Bronze doors. They can provide reinforced material to specific recommendations.

However, they will not be responsible for the passing or failing of the test due to these being modifications, please confirm if the doors must meet the blast criteria desired on this project based on this information.

GC is responsible for doors meeting blast criteria as specified.

S009 6/21/2017 Consigli 1 Allowance Numbers 1 and 2 are identified in specification 012100, and specified to be included in the Proposal sum. The base Bid form B.3.1 format does not provide for entering allowance items. Please clarify where these items are to be identified in our proposal.

Revised Bid Form attached. The Bid Form has been revised to include the 2

Allowances under Division 4 in the South Entrance project – please use this Bid

Form in your proposal.

PROJECT: 1500102 Renovate South Entrance

1500110 Baird AHU Replacement

SOLICITATION: F17SOL100027

LAST UPDATED: 6/29/2017 12:00 PM

SI RFI # Bidder RFI # Date Submt'd Company QA# Request for Information SF Response

2 Section 5 in specification 010000 references a unit price schedule. The schedule in section 5.8 does is empty. Please confirm there is no unit price schedule required for this price submission.

Confirmed. No unit prices.

3 FedBizOpps.gov lists an Amendment dated June 7, 2017 as “Amendment 1”. The

Form 30 designates it as Amendment 000002. Should the FBO reference be changed to “Amendment 2”?

All Amendments will be checked, confirmed and revised if needed before the bid date.

4 FedBizOpps.gov has reference to Amendment 3, changing the due date for additional RFI’s to June 21, 2017. Should a Form 30 be issued documenting

Amendment 000003?

All Amendments will be checked, confirmed and revised if needed before the bid date.

5 Recent RFI responses were issued via email today, June 21, 2017. Will those RFI responses be formalized in Amendment 000004? (We will need to reference all

Amendments in section 19 on SF 1442).

Yes. All Bid RFI will be included in an Amendment.

S010 6/23/2017 Consigli 0 We are respectfully requesting a 1 week extension to the current bid date (July 11, 2017). We are discovering many subcontractors are declining bid requests, due to the July 4th holiday week. We feel that the project will benefit from stronger subcontractor coverage if the bid date is extended. However, its important to provide notice to the subcontracting community, in well in advance of the current bid date, so subcontractors can work this project into their bid schedules

Bid has been extended in FedBizOpps.

1 Retractable bollards: Specifications, 11 12 34, reference for electric operable retractable bollards and manufacturer’s basis of design is electric operable. Details on LS551 reference manual operable retractable bollards. Are bollards to be manually operable or electric operable? If electric operable, please provide Electric

Power Unit (EPU) location(s) and push button control station location(s).

New bollards are manually retractable. The design for the manual retractable bollard is based off of the design for electrical retractable without the electrical hook-up, so no EPU or controls are required.

2 Retractable bollards: End-User to provide sequence of operation (SOO). Also, End-

User to specify what new or existing equipment retractable bollards are to integrate/interface with – makes, model #’s, control programs etc.

Retractable bollards are manual in nature and do not require a sequence of operation for their operation, nor integration with existing retractable bollards on site.

3 Retractable bollards: Specifications, 11 12 34, reference ASTM M40/DoS K8 rating;

what is the desired penetration rating? Reference additional supporting documentation attached herein.

The desired penetration rating is P1.

4 Retractable bollards: Reference specification section 11 12 34 1.8.A; what is the duration of manufacturer maintenance required? Monthly, Quarterly or Semi-

Annually? Manufacturer’s maintenance guidelines typically call for shift change inspections, daily inspections, weekly inspections and monthly inspections. What will be handled by end-user maintenance team vs. Manufacturer’s certified technician?

There will be limited times the bollards are retracted manually; this will be done primarily for maintenance. Assume the bollards will be retracted monthly.

PROJECT: 1500102 Renovate South Entrance

1500110 Baird AHU Replacement

SOLICITATION: F17SOL100027

LAST UPDATED: 6/29/2017 12:00 PM

SI RFI # Bidder RFI # Date Submt'd Company QA# Request for Information SF Response

5 Retractable bollards: The specified manufacturer’s product is not listed on the most recent Department of Defense (DoD) Anti-Ram Vehicle Barrier List. Please confirm that this is not a requirement despite the request for a certified M40/K8 system.

The specified manufacturer's product is not listed as it has not been through a physical crash test. The units should be engineered for the intended rating as with the specified product.

6 Retractable bollards: Metal Fabrications specifications, 05 50 00, do not reference a crash rating for fixed bollards. Are fixed bollards to be crash rated?

Fixed bollards are to have comparable crash ratings to the retractable bollards.

S011 6 06/23/2017

4:06pm

Forrester

Construction

1 Volume 1, A601, Item F01: According to the Manufacturer, this item has been discontinued. Please provide alternative.

Use Justrite Model No. 22607.

2 Door schedule calls out V008 & V009 doors to be HM door & HM frame. There is no hardware, finish, door type, or frame type indicated. They are also not called out on the plans. Please clarify.

These doors are to be removed from the door schedule.

3 107A & 107B doors have note #3 called out. Note mentions “Provide etched glass at Transom,” is there a detail or pattern for the etched glass?

Etching is to match the existing etching. Drawing to be included in addendum.

4 At areas where we weld new structural steel to existing steel, e.g. 2/S502, should we consider that there is no LBP on the existing steel, unless otherwise noted?

Existing steel should be assumed to be coated with LBP. Assume abatement required for new connections.

S012 7 6/23/2017 Forrester

Construction

1 Specification Section 050370-1.13 refers to laser scanning the Historic Night Gates.

The drawings do not include any references to Night Gates. Please confirm that this paragraph refers to the two security gates at the main entrance.

Yes, the Historic Night Gates reference is the same as the two security gates.

5 May 2017 NMNH Renovate South Entrance Bid Set QEA Project No. 31505100 SF Project No. 1500102

LED EXTERIOR LIGHTING 265619 - 1

SECTION 265619 – LED EXTERIOR LIGHTING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Exterior solid-state luminaires that are designed for and exclusively use LED lamp technology.

2. Luminaire supports.

3. Luminaire-mounted photoelectric relays.

1.3 DEFINITIONS

A. CCT: Correlated color temperature.

B. CRI: Color rendering index.

C. Fixture: See "Luminaire."

D. IP: International Protection or Ingress Protection Rating.

E. Lumen: Measured output of lamp and luminaire, or both.

F. Luminaire: Complete lighting unit, including lamp, reflector, and housing.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of luminaire.

1. Include data on features, accessories, and finishes.

2. Include physical description and dimensions of luminaire.

3. Lamps, include life, output (lumens, CCT, and CRI), and energy-efficiency data.

4. Photometric data and adjustment factors based on laboratory tests, complying with IES

Lighting Measurements Testing and Calculation Guides, of each luminaire type. The adjustment factors shall be for lamps and accessories identical to those indicated for the luminaire as applied in this Project.

a. Manufacturer's Certified Data: Photometric data certified by manufacturer's laboratory with a current accreditation under the NVLAP for Energy Efficient Lighting Products.

LED EXTERIOR LIGHTING 265619 - 2

b. Testing Agency Certified Data: For indicated luminaires, photometric data certified by a qualified independent testing agency. Photometric data for remaining luminaires shall be certified by manufacturer.

5. Wiring diagrams for power, control, and signal wiring.

6. Photoelectric relays.

7. Means of attaching luminaires to supports and indication that the attachment is suitable for components involved.

B. Shop Drawings: For nonstandard or custom luminaires.

1. Include plans, elevations, sections, and mounting and attachment details.

2. Include details of luminaire assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

3. Include diagrams for power, signal, and control wiring.

C. Product Schedule: For luminaires and lamps. Use same designations indicated on Drawings.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For testing laboratory providing photometric data for luminaires.

B. Product Test Reports: For each luminaire, for tests performed by manufacturer and witnessed by a qualified testing agency.

C. Source quality-control reports.

D. Sample warranty.

1.6 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: For luminaires to include in operation and maintenance manuals.

1. Provide a list of all lamp types used on Project. Use ANSI and manufacturers' codes.

2. Provide a list of all photoelectric relay types used on Project; use manufacturers' codes.

1.7 QUALITY ASSURANCE

A. Luminaire Photometric Data Testing Laboratory Qualifications: Luminaire manufacturers' laboratory that is accredited under the NVLAP for Energy Efficient Lighting Products.

B. Luminaire Photometric Data Testing Laboratory Qualifications: Provided by an independent agency, with the experience and capability to conduct the testing indicated, that is an NRTL as defined by OSHA in 29 CFR 1910.7, accredited under the NVLAP for Energy Efficient Lighting Products and complying with applicable IES testing standards.

C. Provide luminaires from a single manufacturer for each luminaire type.

LED EXTERIOR LIGHTING 265619 - 3

D. Each luminaire type shall be binned within a three-step MacAdam Ellipse to ensure color consistency among luminaires.

E. Installer Qualifications: An authorized representative who is trained and approved by manufacturer.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Protect finishes of exposed surfaces by applying a strippable, temporary protective covering prior to shipping.

1.9 FIELD CONDITIONS

A. Verify existing and proposed utility structures prior to the start of work associated with luminaire installation.

B. Mark locations of exterior luminaires for approval by COTR prior to the start of luminaire installation.

1.10 WARRANTY

A. Warranty: Manufacturer and Installer agree to repair or replace components of luminaires that fail in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:

a. Structural failures, including luminaire support components.

b. Faulty operation of luminaires and accessories.

c. Deterioration of metals, metal finishes, and other materials beyond normal weathering.

2. Warranty Period: 2 year(s) from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 LUMINAIRE REQUIREMENTS

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. NRTL Compliance: Luminaires shall be listed and labeled for indicated class and division of hazard by an NRTL.

C. FM Global Compliance: Luminaires for hazardous locations shall be listed and labeled for indicated class and division of hazard by FM Global.

D. UL Compliance: Comply with UL 1598 and listed for wet location.

E. Lamp base complying with ANSI C81.61 or IEC 60061-1.

LED EXTERIOR LIGHTING 265619 - 4

F. Bulb shape complying with ANSI C79.1.

G. Lamps dimmable from 100 percent to 0 percent of maximum light output.

H. Internal driver.

I. Lamp Rating: Lamp marked for outdoor use.

J. Source Limitations: Obtain luminaires from single source from a single manufacturer.

2.2 LUMINAIRE-MOUNTED PHOTOELECTRIC RELAYS

A. Comply with UL 773 or UL 773A.

B. Contact Relays: Factory mounted, single throw, designed to fail in the on position, and factory set to turn light unit on at 16 to 32 lx and off at 48 to 108 lx with 15-second minimum time delay. Relay shall have directional lens in front of photocell to prevent artificial light sources from causing false turnoff.

1. Relay with locking-type receptacle shall comply with ANSI C136.10.

2. Adjustable window slide for adjusting on-off set points.

2.3 MATERIALS

A. Metal Parts: Free of burrs and sharp corners and edges.

B. Sheet Metal Components: Corrosion-resistant aluminum. Form and support to prevent warping and sagging.

C. Doors, Frames, and Other Internal Access: Smooth operating, free of light leakage under operating conditions, and designed to permit relamping without use of tools. Designed to prevent doors, frames, lenses, diffusers, and other components from falling accidentally during relamping and when secured in operating position. Doors shall be removable for cleaning or replacing lenses.

D. Diffusers and Globes:

1. Acrylic Diffusers: 100 percent virgin acrylic plastic, with high resistance to yellowing and other changes due to aging, exposure to heat, and UV radiation.

2. Glass: Annealed crystal glass unless otherwise indicated.

3. Lens Thickness: At least 3.175 mm minimum unless otherwise indicated.

E. Lens and Refractor Gaskets: Use heat- and aging-resistant resilient gaskets to seal and cushion lenses and refractors in luminaire doors.

F. Reflecting surfaces shall have minimum reflectance as follows unless otherwise indicated:

1. White Surfaces: 85 percent.

2. Specular Surfaces: 83 percent.

3. Diffusing Specular Surfaces: 75 percent.

LED EXTERIOR LIGHTING 265619 - 5

G. Housings:

1. Rigidly formed, weather- and light-tight enclosure that will not warp, sag, or deform in use.

2. Provide filter/breather for enclosed luminaires.

H. Factory-Applied Labels: Comply with UL 1598. Include recommended lamps. Labels shall be located where they will be readily visible to service personnel, but not seen from normal viewing angles when lamps are in place.

1. Label shall include the following lamp characteristics:

a. "USE ONLY" and include specific lamp type.

b. Lamp diameter, shape, size, wattage and coating.

c. CCT and CRI for all luminaires.

2.4 FINISHES

A. Luminaire Finish: Manufacturer's standard paint applied to factory-assembled and -tested luminaire before shipping. Where indicated, match finish process and color of pole or support materials.

2.5 LUMINAIRE SUPPORT COMPONENTS

A. Comply with requirements in Section 26 0529 "Hangers and Supports for Electrical Systems" for channel and angle iron supports and nonmetallic channel and angle supports.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Examine roughing-in for luminaire electrical conduit to verify actual locations of conduit connections before luminaire installation.

C. Examine walls, and overhang ceilings for suitable conditions where luminaires will be installed.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 GENERAL INSTALLATION REQUIREMENTS

A. Comply with NECA 1, “Standard Practice for Good Workmanship in Electrical Construction.”

B. Install lamps in each luminaire.

C. Fasten luminaire to structural support.

LED EXTERIOR LIGHTING 265619 - 6

D. Supports:

1. Sized and rated for luminaire weight.

2. Able to maintain luminaire position after cleaning and relamping.

3. Support luminaires without causing deflection of finished surface.

4. Luminaire-mounting devices shall be capable of supporting a horizontal force of 100 percent of luminaire weight and a vertical force of 400 percent of luminaire weight.

E. Wiring Method: Install cables in raceways. Conceal raceways and cables.

F. Coordinate layout and installation of luminaires with other construction.

G. Adjust luminaires that require field adjustment or aiming. Include adjustment of photoelectric device to prevent false operation of relay by artificial light sources, favoring a north orientation.

H. Comply with requirements in Section 26 0519 "Low-Voltage Electrical Power Conductors and Cables" and 260533 "Raceways and Boxes for Electrical Systems" for wiring connections and wiring methods.

3.3 CORROSION PREVENTION

A. Aluminum: Do not use in contact with earth or concrete. When in direct contact with a dissimilar metal, protect aluminum by insulating fittings or treatment.

B. Steel Conduits: Comply with Section 26 0533 "Raceways and Boxes for Electrical Systems." In concrete foundations, wrap conduit with 0.254-mm- thick, pipe-wrapping plastic tape applied with a 50 percent overlap.

3.4 IDENTIFICATION

A. Identify system components, wiring, cabling, and terminals. Comply with requirements for identification specified in Section 26 0553 "Identification for Electrical Systems."

3.5 FIELD QUALITY CONTROL

A. Inspect each installed luminaire for damage. Replace damaged luminaires and components.

B. Luminaire will be considered defective if it does not pass tests and inspections.

C. Prepare a written report of tests, inspections, observations, and verifications indicating and interpreting results. If adjustments are made to lighting system, retest to demonstrate compliance with standards.

END OF SECTION 265619

LED EXTERIOR LIGHTING 265619 - 1

SECTION 265619 – LED EXTERIOR LIGHTING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Exterior solid-state luminaires that are designed for and exclusively use LED lamp technology.

2. Luminaire supports.

3. Luminaire-mounted photoelectric relays.

1.3 DEFINITIONS

A. CCT: Correlated color temperature.

B. CRI: Color rendering index.

C. Fixture: See "Luminaire."

D. IP: International Protection or Ingress Protection Rating.

E. Lumen: Measured output of lamp and luminaire, or both.

F. Luminaire: Complete lighting unit, including lamp, reflector, and housing.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of luminaire.

1. Include data on features, accessories, and finishes.

2. Include physical description and dimensions of luminaire.

3. Lamps, include life, output (lumens, CCT, and CRI), and energy-efficiency data.

4. Photometric data and adjustment factors based on laboratory tests, complying with IES

Lighting Measurements Testing and Calculation Guides, of each luminaire type. The adjustment factors shall be for lamps and accessories identical to those indicated for the luminaire as applied in this Project.

a. Manufacturer's Certified Data: Photometric data certified by manufacturer's laboratory with a current accreditation under the NVLAP for Energy Efficient Lighting Products.

LED EXTERIOR LIGHTING 265619 - 2

b. Testing Agency Certified Data: For indicated luminaires, photometric data certified by a qualified independent testing agency. Photometric data for remaining luminaires shall be certified by manufacturer.

5. Wiring diagrams for power, control, and signal wiring.

6. Photoelectric relays.

7. Means of attaching luminaires to supports and indication that the attachment is suitable for components involved.

B. Shop Drawings: For nonstandard or custom luminaires.

1. Include plans, elevations, sections, and mounting and attachment details.

2. Include details of luminaire assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

3. Include diagrams for power, signal, and control wiring.

C. Product Schedule: For luminaires and lamps. Use same designations indicated on Drawings.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For testing laboratory providing photometric data for luminaires.

B. Product Test Reports: For each luminaire, for tests performed by manufacturer and witnessed by a qualified testing agency.

C. Source quality-control reports.

D. Sample warranty.

1.6 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: For luminaires to include in operation and maintenance manuals.

1. Provide a list of all lamp types used on Project. Use ANSI and manufacturers' codes.

2. Provide a list of all photoelectric relay types used on…