PRAIRIE CREEK REMEDIATION Federal contract opportunity
Solicitation number
F16PS00359
Issued by
Department of the Interior Fish and Wildlife Service Region 9 Headquarters

About this file

Specs

View the file

Other files for this federal contract opportunity

Other files attached to PRAIRIE CREEK REMEDIATION, newest first.
File Type Posted
General_Decision_Number__IL_16.docx DOCX document
16-RF-022_DWGS.pdf PDF
F16PS00359_Clauses.docx DOCX document
Sol_F16PS00359.pdf PDF
Bid_Schedule1.PC_(2016).xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Station Name/Address:

Project Name:

CRAB ORCHARD NATIONAL WILDLIFE REFUGE

8588 Route 148, Marion, Illinois 62959

PRAIRIE CREEK - SITE INVESTIGATION

PHASE 2

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENTS

C.1.0 GENERAL

C.1.1 PROJECT DESCRIPTION

The Crab Orchard National Wildlife Refuge - Prairie Creek site had three leaking underground storage tanks (UST’s) removed in 1995. Subsequent site assessment investigations determined the soil and groundwater was contaminated with BTEX, MTBE, and lead. It was determined the soil component contaminant of concern is BTEX. All site investigations where done according to the Illinois Environmental Protection Agencies (IEPA) Leaking Underground Storage Tank (LUST) program, hereby referred to as the IEPA.

In 2014 Natural Resource Technologies (NRT) excavated approximately 355 cubic yards of overburdened soils from the approximate location original tank pit.

During the excavation evidence of additional overburdened material was visible in the sidewalls of the excavation. In 2015 Brownfield Development installed additional groundwater (GW) monitoring wells (MW) and began a yearlong quarterly GW monitoring program to determine the efficacy of the initial excavation.

In 2016 the Illinois Department of Transportation (IDOT) will begin work in preparation to widen highway 13 located adjacent to the sight. A Letter of Agreement was signed between the IDOT and FWS. The agreement states the IDOT will excavate, remove and dispose of up to 400 cubic yards contaminated overburdened soils from the site with the oversight of an FWS provided Environmental Consultant.

The Government, US Fish and Wildlife Service (USFWS), requires Environmental Consultant (EC) services to develop and implement a Work Plan to perform the following; determine the locations requiring additional excavation of overburdened soils;

coordinate and guide the IDOT’s excavation to ensure that as much contaminated soils are removed as possible; obtain and analyze all required soil samples during the excavation activities; coordinate and guide the IDOT’s backfilling activities; and develop and deliver a Stage 2 Site Assessment report of all remediation activities to the IEPA Program Manager.

Additional work will determine the efficacy of the IDOT excavation activities including: developing a Work Plan to perform the following: installation of three (3) GW monitoring wells at locations designated by the IEPA Program Manager; abandon minimum of five

(5) existing GW monitoring wells; begin a one (1) year quarterly GW monitoring program; and develop Corrective Action and Completion Report providing the efficacy of the second excavation site assessment activity.

All work shall done in strict accordance to the IEPA, Illinois Department of Public Health (IDPH), Occupational Safety and Health Administration (OSHA), and all other Federal, State, and local rules and regulations.

C.1.2 Location of Work

Crab Orchard National Wildlife Refuge Prairie Creek 8588 Route 148 Marion IL, 62959-5822

(618) 997-3344

Prairie Creek is located on the north end of Little Grassy Lake off of highway 10 on Crab Orchard NWR property.

C.1.3 Government Review Prior To Project Implementation

A. The Contractor shall meet with the Refuge staff and the COR to review plans and design prior to beginning Work.

C.1.4 Safety

A. All personnel working on the site shall have Hazardous Waste Operations (HAZWOPPER) training with a current annual refresher course.

B. All waste material including contaminated water shall be disposed of at a facility certified to accept hazardous waste of this type.

C. The EC is responsible for determining the exact locations of underground structures, utilities, power lines and wires. The EC shall be responsible for repair of such structures, utilities, lines and wires when broken or damaged.

D. The EC is responsible for obtaining all permits required for this project.

E. All equipment and work activities shall comply with OSHA Regulations and all accidents incidental to work performed under this contract shall be reported in accordance with OSHA reporting requirements.

Additionally a copy of the accident report shall be provided to the Contracting Officer.

E. The EC shall provide and install barricades, signs, or other warning devices to delineate the construction area and restrict public access to the construction site.

F. Provide at least one non-freezing-type fire extinguisher in each workshop and shed for storage of materials on the premises. Place in location readily accessible to workers. Provide at least one non-freezing-type fire extinguisher of the appropriate class of the appropriate class for each group of workers performing flammable procedures.

G. Provide and maintain a basic first aid kit for use of workers.

1. Provide first aid supply commensurate with size of project with items necessary for first aid treatment of all injuries. The first aid supply shall include items identified on MSDS in applicable locations.

2. Advise all workers of the location of first aid supplies.

3. Post telephone numbers of nearest hospital or ambulance service and fire station in conspicuous location. Advise all workers of location of telephone numbers.

K. The EC shall ensure all personnel working on the site are provided the necessary Personnel Protective Equipment (PPE) as identified by MSDS and OSHA regulations. Provide documentation, workers have been trained in use of PPE prior to individual use.

L. All excavations deeper than four (4) feet shall be in compliance with OSHA 29 CFR Part 1926. Include trenching safety procedures in the Health and Safety Plan (HASP).

C.1.5 Change Orders

A. In the event of a need for a Change Order the EC will receive a letter requesting a price quote for proposed change(s).

B. Any request for time extension must be justified and supported in detail.

C.1.6 Submittals

A. Submit a Health and Safety Plan, and Quality Assurance and Quality Control Plan signed by a licensed professional Environmental Engineer.

B. Submit certification showing that all personnel working on the site, including IDOT personnel, have Hazardous Waste Operations (HAZWOPPER) training with a current annual refresher course.

C. Submit the location and certification of the subtitle D landfill for disposal of all contaminated wastes

D. Submit a waste manifest including delivery tickets for the disposal of all contaminated soils.

E. Submit a Waste Manifest for disposal of Investigation Derived Waste (IDW) and all other materials disposed of during construction.

F. EC shall submit a price breakdown for all lump sum items as required by FAR clauses prior to the Pre-assessment meeting.

G. EC shall be responsible to submit all documentation as required in this Statement of Work (SOW).

H. EC shall complete and submit the attached Preconstruction Safety Checklist.

C.1.7 Inspection Intensity

A. There will be periodic inspections by the Government’s Construction Inspector, COR, or the Site Inspector.

C.1.8 Special Notes

A. All respondents are encouraged to visit the job site.

B. Work scheduled on Saturdays, Sundays, Federal Holidays or other normal working hours shall be approved by the Government.

C. Maintain and restore all Government roads, service areas and utilities used to pre-construction conduction.

C.2.0 DEFINITIONS

C.2.1 Contracting Officer - The officer signing the contract on behalf of the Government. The Contracting Officer has overall responsibility for the contract and is the only one who has the authority to terminate a contract, to authorize changes or modifications and to issue final decision. The Contracting Officer is:

Meaghan Nelson U.S. Fish and Wildlife Service Contracting and Facilities Management 5600 American Blvd. W., Suite 990 Bloomington, MN 55437-1458 Phone: (612) 713-5206

FAX: (612) 713-5291

C.2.2 Contracting Officer's Technical Representative (COTR)

- The Government Engineer who will have the following authority under the contract.

C.2.2.1 Represent the Contracting Officer for all technical matters that may arise under the contract.

C.2.2.2 Shall remain cognizant of the EC's technical efforts and progress and discuss these matters with him as appropriate.

C.2.2.3 Respond to the EC's inquiries on purely technical aspects of the contract.

C.2.2.4 Review progress payment requests from the EC.

C.2.2.5 The COTR is:

Mike Brickley M.E.

Department of Engineering 5600 American Blvd. W., Suite 990 Bloomington, MN 55437-1458 Phone: (612) 713-5258 Fax: (612) 713-5291

C.2.3 Site Contacts:

Kevin Reichert – Facilities Operations Specialist

Crab Orchard National Wildlife Refuge 8588 Route 148 Marion, IL 62959 Office: (618) 997-5980 Cell: (618) 997-6271

C.2.4 IDOT Contact

Brandy Maes Illinois Department of Transportation District 9 – Carbondale 618-351-5292

C.2.5 Contractor-Furnished Items

C.2.5.1 Contractor (EC) shall provide all tools, equipment and supplies necessary to provide support as outlined in this SOW.

C.2.5.2 EC shall obtain and pay for all permits and all IEPA review fees required to perform Work.

C.2.5.3 The EC shall be responsible for disposal of all instigative derived waste as a result of well installations, abandonments, and groundwater monitoring.

C.2.6 Government-Furnished Property/Items

C.2.6.1 Drawings show the site location, the approximate location of all existing GW monitoring wells, soil borings, approximate areas of further excavation, and the location of a proposed future asphalt barrier cap (Attachment A).

C.2.6.2 Preconstruction Safety Checklist (Attachment B).

C.2.6.3 Site Investigation Completion Report dated August 22, 2014 by NRT (Appendix A).

C.2.6.4 Summary of Groundwater Monitoring Results - shows the history of GW monitoring data obtained from 7-29-1999 to 4-26-2016. (Appendix B).

C.2.6.5 Prairie Creek Monitoring Well and Excavation Coordinates – Lists the coordinates of the existing monitoring wells and soil borings (Appendix C).

C.2.6.6 FWS CADD Standards (Appendix D).

C.2.7 IDOT-Furnished Property/Items

C.2.7.1 The IDOT will furnish all excavation and hauling equipment.

C.2.7.2 The IDOT will furnish all Equipment Operators.

C.2.7.3 The IDOT will furnish all approved backfill material including native soil and class V aggregate.

C.2.7.4 The IDOT will furnish all excavation, disposal, and backfill labor as directed by the EC and the approved Work Plan.

C.2.7.5 The IDOT will furnish all disposal of excavated and contaminated soils.

C.2.7.6 The IDOT will furnish all compaction testing.

C.3.0 TASKS

C.3.1 The EC shall provide a “Pre-Excavation” Work Plan for review and approval by the FWS, IDOT, and the IEPA in no less than two months before Work begins. IEPA approval may not be required prior to beginning work due to high IEPA workloads. If the IEPA provides comments prior to beginning work, comments will be incorporated into the Work Plan. A modification to this contract and the Work Plan may be required.

C.3.1.1 All Work shall be in compliance with requirements of the IEPA Title XVI and the 35 Illinois Administrative Codes 734 and 742.

C.3.1.2 The Work Plan will include coordination, communication, and management of all aspects of the excavation, backfill, and disposal activities between the EC, FWS, and IDOT.

C.3.1.3 The Work Plan shall include abandonment of three (3)

GW monitoring wells within the excavation limits at the locations as shown on the attached drawings according to IDPH Section 920.120 Water Well Construction Codes.

Included is the abandonment of all existing borings in within the excavation limits at the locations as shown on the attached drawings according to (‘Boring’ and ‘Water Bearing Formation’ Section 920.01) Section

920.120 of the Illinois Water Well Construction Code (Title 77 Ill. Adm. Code 920). (Attachment D).

C.3.1.4 The Work Plan shall include a detailed plan for the excavation, removal, and disposal of contaminated source material from areas as determined by the EC.

The EC will determine the approximate excavation limits using the Site Investigation Completion Report dated August 22, 2014 by NRT (Appendix A), Summary of Groundwater Monitoring Results (Appendix B), Prairie Creek MW and Soil Boring Coordinates sheet (Appendix C), and the attached drawings.

C.3.1.5 The Work Plan will include designing and implementing a soil sampling plan examining the base and side walls of the excavations by means of a photo-ionization detector (PID). The actual excavation dimensions will be dependent on the EC’s observations and PID readings in the soils of the pit bottom and side walls. The pit bottom will depend on the water table level at the time of excavation. Excavation will stop when the water table is hit and no additional material shall be removed from the bottom of pit. No standing water shall be allowed in the pit at any time.

C.3.1.6 The Work Plan shall include a soil sampling plan designed and implemented for analysis of BTEX, MTBE, and total lead contamination from the excavation pit bottom and sidewalls of the excavation to ensure that adequate source material are removed below IEPA Tier I and Tier 2 objectives. A minimum of three samples from the base and each sidewall shall be taken and analyzed. For the purposes of this SOW it is anticipated a maximum of 45 soil samples will be taken and analyzed for BTEX, MTBE, and total lead.

C.3.1.7 Excavation below the groundwater table is strictly prohibited.

C.3.1.8 The Work Plan will include a plan to ensure the excavation does not exceed the removal of material in excess of more than 400 cubic yards.

C.3.1.9 The Work Plan will provide and state the type backfill material to be used at the site. Backfill material will be of like soils as exists at the Prairie Creek site and shall be compacted to at least 80% standard proctor in eight (8) inch maximum lifts. The excavation shall be backfilled to six (6) inches of surface level.

C.3.1.10 The Work Plan shall include an additional excavation of six (6) inches of the 80’ x 50’ area as shown in yellow on the attached drawing. Class V fill material shall be placed and compacted to 90% standard proctor to bring the entire excavation surface level. Extra care shall be taken when excavation and compaction near GW monitoring wells. Monitoring well heads may require reinforcement.

C.3.1.11 The Work Plan shall be submitted to the FWS, IDOT, and

IEPA for approval.

C.3.2 Excavation Work Plan Implementation. The IDOT has determined work at Prairie Creek shall be done between September 6, 2016 and October 15, 2016.

C.3.2.1 A site meeting or teleconference will be held a minimum of one (1) month prior to beginning work to introduce and review the Work Plan with the EC, FWS, and the IDOT personnel. This meeting will include discussion of the following:

a. The Work Plan Schedule.

b. Coordination of roles and responsibilities between the EC, FWS, and the IDOT.

c. Discussion of Health and Safety Plan.

d. Submittals as per the approved Work Plan.

C.3.2.2 The EC shall notify the IEPA a minimum of ten (10) working days prior to beginning work.

C.3.2.3 The EC shall examine the site using coordinates provided and stake out the approximate excavation limits prior to beginning work on the site.

C.2.3.4 The EC shall abandon GW monitoring wells prior to beginning excavation activities as per the approved Work Plan.

C.3.2.5 The EC shall direct all IDOT excavation activities as per the approved Work Plan. Excavations of contaminated areas will be conducted in stages as shown on the drawings. When the EC concludes that Tier 1 or Tier 2 excavation criteria have been attained in one area the EC shall obtain soil samples as required per the Work Plan.

After all required samples are obtained backfill operations may begin according to the approved Work Plan.

C.3.2.6 If the EC believes the excavation limits require expanding notify the COR immediately prior to continuing excavation.

C.3.2.7 The EC shall obtain one (1) round of GW monitoring well samples and analyze for BTEX, MTBE, and lead from the remaining fourteen (14) GW monitoring wells.

C.3.2.8 After all site work is accomplished the EC shall prepare and submit a Stage 2 Site Investigation Report to the IEPA’s Site Project Manager and the FWS.

C.3.3 Stage 2 Site Investigation Report for Excavation

Activities

C.3.3.1 The EC shall prepare and submit a Stage 2 Site

Investigation Report to the IEPA’s Program Manager and FWS. The report will include a complete description of the Work Plan and site activities including: well abandonment procedures and records; EC, IDOT, and FWS coordination; excavation activities; all sidewall and pit-bottom soil sampling procedures, locations and analysis records; GW monitoring data; drawings to scale showing the extents and locations of the excavations; drawings to scale showing the extents of remaining contaminated soils; approximate location of the future engineered asphalt barrier cap; all drawings shall show site property boundaries and surrounding properties; include all tables indicating all laboratory samples to date, dates sampled, and results of each sample; and recommendations for further site remediation/evaluation activities including installation of GW monitoring wells, abandonment of existing GW monitoring wells, and institution of a GW monitoring program.

C.3.4 “Post Excavation” Work Plan

C.3.4.1 Upon receipt of the IEPA’s Directive letter for the

Stage 2 Site Assessment the EC shall begin a “Post Excavation” Site Assessment Work Plan for approval by the IEPA’s Program Manager and the FWS.

C.3.4.2 The Work Plan shall include the installation of three

(3) GW monitoring wells. Installation of GW monitoring wells shall be according to IDPH Section

920.170 Water Well Construction Codes. GW monitoring

wells will be installed in locations as provided by the IEPA Directive letter.

C.3.4.3 The Work Plan shall include abandonment of five (5) existing GW monitoring wells located at the site as determined by the IEPA Program Manager according to IDPH Section 920.120 Water Well Construction Codes.

C.3.4.4 The Work Plan shall include four (4) rounds of quarterly GW monitoring of fourteen (14) GW monitoring wells. GW monitoring will be for BTEX, MTBE, and lead.

C.3.5 “Post Excavation” Work Plan Implementation

C.3.5.1 The EC shall install three (3) GW monitoring wells according to the IEPA’s approved Work Plan.

C.3.5.2 The EC shall abandon (5) GW monitoring wells according to the IEPA’s approved Work Plan.

C.3.5.3 The EC institute a GW monitoring program according to the IEPA’s approved post Work Plan.

C.3.5.4 The EC shall develop and submit a Corrective Action

Completion Report (CACR) to the IEPA Program Manager and the FWS. The report will include a complete description of the approved Work Plan and site activities including: GW installation and abandonment procedures and records; GW monitoring program procedures, analysis, results and records; drawings showing the extents of remaining contaminated soils;

drawings showing approximate location of a future engineered asphalt barrier cap; all drawings shall be to scale, show site property boundaries and surrounding properties; tables indicating all laboratory samples to date, dates sampled, and results of each sample; and recommendations for further site evaluation activities including continuation of a GW monitoring program or abandonment of existing GW monitoring wells and installation of an engineered asphalt barrier cap including application of any institutional controls to the property; and receipt of a No Further Action Letter from the IEPA Program Manager.

C.4.0 CONSTRUCTION ADMINISTRATION

C.4.1 The EC shall consult with Government representatives as necessary to clarify the technical requirements and objectives of this contract. Consultations may be in the form of meetings, letters and/or telephone conversations.

C.4.2 Additional progress meetings may be held to discuss program requirements, job progress, or any problems or conflicts regarding the project. These meetings may be requested by the EC or the FWS. No extra compensation will be paid for these consultant services.

C.4.3 EC shall obtain and pay for all permits that are required to perform the proposed work plan.

C.4.4 The EC shall make corrections and modifications as requested by the Government at each level of submission/review.

C.5.0 DELIVERABLES

C.5.1 The contractor is responsible to provide the following:

C.5.1.1 The EC shall submit to the IDOT, FWS and the IEPA a pre-excavation Work Plan for approval by the IEPA’s Program Manager and the FWS. The Work Plan will specify the procedures and activities as stated in Section C.3.1.

C.5.1.2 The EC shall submit to the FWS and the IEPA a Stage 2

Site Investigation report. The report will specify the results of procedures, activities, and further recommendations as stated in C.3.3.1.

C.5.1.3 The EC shall submit to the FWS and the IEPA a “Post

Excavation” Work Plan for approval by the IEPA’s Program Manager. The Work Plan will specify the procedures and activities as stated in C.3.4.

C.5.1.4 The EC shall submit a post excavation Corrective

Action and Completion Report (CACR) to the IEPA and FWS. The CACR will specify the results as stated in C.3.5.4.

C.5.1.5 All Work Plans and Reports provided by the EC shall be signed and sealed by a Licensed Environmental Professional Engineer.

C.5.1.6 EC shall provide the following copies of the Reports delivered to the specified locations:

• Refuge Field Station

One (1) hard copy of the report

• Contracting Officer’s Technical Representative office Three (3) hard copies of the report Three (1) digital .pdf copy of the report Copies of all drawings in AutoCadd format shall be provided on a separate CD to the

COR.

C.5.2 Digital Files

C.5.2.1 All drawings are to be produced using AutoCAD software version 2007 or newer and as specified in the attached CADD standards (Appendix D).

C.5.3 Ownership of Documents

C.5.3.1 All documents and digital files submitted to the

Government are considered to be the property of the Government once said documents are submitted. The Government shall have authority to use, modify, or supplement the documents as needed for staking the improvements and for future construction projects.

C.6.0 PROJECT SCHEDULE

C.6.1 Project Schedule and Submittals

C.6.1.1 The EC shall provide a schedule with the following milestones:

• Site Visit/Teleconference

• Pre-Excavation Work Plan Submittal

• Pre-Excavation Work Plan Meeting/Site Visit

• Work Plan Implementation

• Stage 2 Site Investigation Report

• Post-Excavation Work Plan Submittal

• Post-Excavation Work Plan Activities

• CACR Submittal.

C.6.1.2 The EC shall provide the schedule in calendar days.

C.6.1.3 The FWS has set a Final Date of June 8, 2016 to submit the Pre-Excavation Work Plan.

C.6.1.4 The FWS has set a final date of November 28, 2017 to submit results of the final round of quarterly GW monitoring.

C.6.1.5 The FWS has set a final date of this contract as March

26, 2018.

C.7.0 PAYMENT

C.7.1 Payments shall be made to the EC monthly.

PRECONSTRUCTION SAFETY CHECKLIST

PROJECT LOCATION:

PRECONSTRUCTION MEETING

DATE:

NAME AND ADDRESS OF

CO NT RACT OR :

NAME OF CONTRACTOR

SU PER INT EN DE NT /FO RE M AN

NAME OF SERVICE

CONTRACTING OFFICER:

NAM E O F C ON TR ACT OR ’S

COM PETEN T PERSO N (PER 29

CFR

PROPOSED CONSTRUCTION

STAR T D ATE:

PROJECT T ITLE: CONTRACT NUMBER:

The Fish and Wildlife Service (FWS) places safety and health as a top priority at all Service contracted construction sites (360 FW 4). The contractor has ultimate responsibility for safety during construction until final completion and acceptance of the project by FWS.

This checklist serves as an assurance tool/guide in assessing safety program preparations of the contractor, and is not all-inclusive. As tasks change and new risks and hazards are introduced, you may need to address additional safeguards and corrective measures.

The contractor and subcontractor(s) must comply with all Occupational Safety and Health Administration (OSHA) regulations applicable to the construction project, including requirements set forth w ithin solicitation provisions and contract clauses (e.g., FAR 52.236-13 “Accident Prevention” with Alternate I and Special Provisions). It is the responsibility of the contractor/subcontractor(s) to adhere to regulations found at 29 CFR 1910, 1926, and 1928. (See page 5 for Table of Contents of OSHA Construction Safety Standards.) Each contractor/subcontractor must initiate and maintain an effective safety program that provides adequate systematic policies, procedures, and practices to protect their employees from, and allow them to recognize, job-related safety and health hazards. The program must include provisions for the systematic identification, evaluation, and prevention/control of general work s ite hazards, specific job hazards, and potential hazards that may arise from foreseeable conditions, as well as providing a competent person to conduct frequent and regular inspections. The contractor must instruct each employee to recognize and avoid unsafe conditions and the regulations applicable to the work environm ent.

The contractor will address the following items prior to and/or during the Preconstruction Conference (the Contracting

Officer/Contracting Officer’s Representative will record these items):

1.

FAR 52.236-13, Accident Prevention, Alternate I and applicable safety provisions?

The contractor has read and understands his/her re spo nsibilities for compliance with contractual safety language -

NO ___YES ___

2. Has contractor prepared a Safety Plan that analyzes anticipated hazards of the project and indicates how the hazards will be controlled?

use, scaffolding, excavat

Contractor must identify specific procedures for controlling hazardous operations such as crane

NO ___ion/trenching, hot work/welding, etc,. ES ___ Y N/A

FWS Form 3-2199 05/03 Page 1 of 5

3. How will contractor/subcontractor address the four leading hazards of construction work: falls, struck by, caught in/betw nd electr ical?

4. The “Designated Competent Person” (responsible for the pro ject’s safety and health performance) is knowledgeable corrective measures?

in applicable OSHA regulations and capable of identifying existing/predictable hazards, and has the authority to prompt

YES ___ NO ___

5.

haza

Do contractor and subcon tractor em ployees know wha t to do in the event of an em erge ncy (e.g., injury, fire, accident, ESYrdous material spill, etc.) with regard to the following actions? NO

a. Notification of Departm ent, FW S Facility Manager, CO, COR, CI, etc.

b. Means of com munication with contact numbers (e.g., radio, cellular, pager, etc.).

c. Availability of first-aid/medically-trained contractor personnel with appropriate medical supplies.

d. Personnel (including subcontractors) knowledge of location for imm ediate aid (e.g., first-aid, etc.).

e. Evacuation routes, signals, and procedures are provided to all on-site personnel.

f. Safety and health information disseminated to all site personnel (e.g., contractor and subcontractor employees).

6.

(If no, skip to # 7)

a. Location and type of trailer (office or equipment).

b. Telephone hook-up.

c. Electrical hook-up.

d.

W ill a contractor/s ubc ontra ctor tra iler be broug ht on site and its hook-up/p lacem ent coord inated with COR /CI?

e. Propane used for heating?

f. Serve as first-aid station? YES

Vehicle parking arrang em ent (adequate space).

YES ___

___NO ___

NO ___

7. Is contractor aware that he/she must ensure construction area is clearly delineated and posted with appropriate warning signs (e .g., “Hard Hat Area”, “Construction Site – CLOSED”, rea C losed to Public”, etc.), and that instructional signs (e.g., designated parking area, etc.) and flagmen or barriers may be required? Yes No

Housekeeping - Is contractor/subcontractor aware that they must ensure that following acceptable housekeeping

NO

“A

8.

standards are practiced from project’s start to finish?

YES

a. Form/scrap lumber with protruding nails and all other debris shall be kept clear from work areas.

b. Combustible scrap and debris shall be removed at regular/frequent intervals.

c. Materials shall be stored with regard to their fire characteristics with effective fire protection and prevention measures used.

d. An enclosed chute shall be used whenever materials are dropped more than 20 feet to an exterior point of a building.

e. Aisles, exits, and passageways shall be kept clear and in good repair.

9.

Is contractor aware of following Environmental and Personal Controls standards? YES NO

a. Potable water provided.

b. Restroom facilities provided.

c. W ashing facility provided for employees engaged in operations involving harmful substances.

d. Intoxicating beverages, controlled substances, and/or firearms are not permitted under any circumstances on the construction site.

e. All activities in or around water bodies must be in compliance with regulations for worker safety, including personal flotation devices or buoyant work vests, lifelines, ring buoys and guardrails while working over or adjacent to water hazards, and from barges, boats, and/or launches.

FWS Form 3-2199 05/03 Page 2 of 5

10.

a. Confined Space.

b. Scaffolding.

c. Fall Protection.

d. Hazard Comm unication.

e. Lockout/Tagout.

f. Respiratory Protection.

g. First Aid.

Is contractor/subcontactor aware that following employee training considerations may need to be addressed?

YES NO

11. Contractor/subcontractor is responsible for requiring the wearing of appropriate personal protective equipment in all operations where there is an exposure to hazardous conditions or where the need is indicated for using such equipment to reduce the hazard to their employee(s). The contractor/subcontractor is also responsible for ensuring equipment may include the following: Discussed with contractor?

that personnel using protective equipment shall be trained and medically qualified to do so. Such personal protective

a. Eye and face protection (safety goggles, safety glasses, welding goggles, face shields, etc.).

b. Protective footwear (safety shoes, boots).

c. Protective gloves (leather, rubber, insulated).

d. Respirators (dust, half-face, full-face, etc.).

e. Hearing protection (ear plugs, muffs, etc.).

f. Coast Guard-approved PFD/buoyant vest.

g. Fall protection equipm ent.

12. Tools (hand, electric, pneumatic) Standards: Discussed with contractor?

a. Hand tools, power tools, and jacks are maintained in safe operating condition and used only for the purpose for which they were designed.

b. Electric power-operated tools must be either approved double-insulated, or be properly grounded (see Item

#13 “Electrical” for additional considerations).

13. Electrical Standards:

a. Ground Fault Circuit Interrupters (GFCIs) or an assured equipment-grounding conductor program must be used to protect employees from ground-fault hazards.

b. Electrical cords/insulation must be in good condition (not frayed or damaged).

c. All ground plugs must be on electrical cords, if so designed by the manufacturer.

d. W orkspace, walkways, and similar locations shall be kept clear of electrical cords.

e.

f.

All electrical extension cords must be of the three-wire type.

Contractor/subcontractor must determine need and implem ent an appropriate Lock-out/Tag-out program.

14. W ill motor vehicles, cranes, and/or heavy equipment be used? YES NO __ (If no, skip to #15)

a. Crane and derrick use must comply with applicable standards.

b. Rollover protection as required.

c. Back-up alarms or observer signals as required.

d. No crawler type vehicles are allowed on an improved road.

e. All utilities must be located prior to excavating soil.

15. Excavating and Trenching work? YES ___ NO ___ (If no, skip to #16)

a. All excavating/trenching must be in accordance with applicable safety standards.

b. All utilities must be located prior to excavating.

FWS Form 3-2199 05/03 Page 3 of 5

16. Elevated W ork? YES ___ NO ___ (If no, skip to #17) a.

Ladders and their use must conform to standards.

b. Aerial lift usage must meet applicable requirements.

c. Fall protection needs must be assessed per standards.

d. Scaffold work must conform to standards.

e. Stair design, construction, and use must meet applicable requirements.

f. Toeboards, when used to protect workers from falling objects, must be erected along the edge of the overhead walking/working surface.

g. Safety net use must comply with standards.

h. Railing must conform to standards.

17.

construction.

Contractor is aware of and understands the need to incorporate app licable requirem ents for concrete and m asonry

YES ___ NO ___ N/A ___

18. Contractor is aware of and understands the need to incorporate welding and cutting operations that com ply with etc.).

applicable safe ty requirem ents (e.g., compressed gas cylinders are protected from vehicle traffic, valve caps secured, 19.

paint

Contrac tor is aw are o f and understands the need to m anage hazard ous m aterials/waste appro priately (e.g., YES N/A

N/A ___ s, solvents, fuels, etc.) including the following: NO ___

a. Use and storage of flammable/combustible liquids.

b. Aboveground fuel storage tanks properly managed/contained.

c. Com pressed gases and cylinders managed correctly (e.g., secured and protected from damage, etc.).

d. Procedures for managing use, storage, and disposal of hazardous materials properly established.

e. Excess/waste product(s) and containers properly disposed of per environmental regulations.

f. Hazards of product use and the need for protective measures (e .g., personal protective equipment, etc.)

conveyed to employees.

g. Asbestos work conform s to applicable standards.

h. Exposure to toxic gases, vapors, fum es, dusts , and m ists managed correctly.

i. Lead, laser, and any other hazardous components managed per the applicable standard.

j. Contract employees must conduct hazardous waste operations work within the parameters of a written safety

& health plan.

20. Comments, notes, additional requirements:

The contractor has the ultimate responsibility for safety on the project site at all times until final completion and acceptance of the project.

The contractor’s signature below indicates the above information was discussed and understood.

Contractor signature: _________________________________________ Date: __________________________

Date: __________________________

Contracting Officer/Contracting Officer’s Representative

FWS Form 3-2199 05/03 Page 4 of 5

OSHA CONSTRUCTION SAFETY STANDARDS - 29 CFR 1926:

(Following standards can be accessed at http://www.osha.gov):

Subpart A (1926.1 - 1926.5) - General

Subpart B (1926.10 - 1926.16) - General Interpretations

Subpart C (1926.20 - 1926.35) - General Safety and Health Provisions

Subpart D (1926.50 - 1926.66) - Occupational Health and Environm ental Controls

Subpart E (1926.95 - 1926.107) - Personal Protective and Life Saving Equipment

Subpart F (1926.150 - 1926.155) - Fire Protection and Prevention

Subpart G (1926.200 - 1926.203) - Signs, Signals and Barricades

Subpart H (1926.250 - 1926.252) - Materials Handling, Storage, Use and Disposal

Subpart I (1926.300 - 1926.307) - Tools - Hand and Power

Subpart J (1926.350 - 1926.354) - W elding and Cutting

Subpart K (1926.400 - 1926.449) - Electrical

Subpart L (1926.450 - 1926.454) - Scaffolds

Subpart M (1926.500 - 1926.503) - Fall Protection

Subpart N (1926.550 - 1926.555) - Cranes, Derricks, Hoists, Elevators and Conveyors

Subpart O (1926. 600 - 1926.606) - Motor Vehicles, Mechanized Equipment and Marine Operations

Subpart P (1926.650 - 1926.652) - Excavations

Subpart Q ( 1926.700 - 1926.706) - Concrete and Masonry Construction

Subpart R (1926.750 - 1926.752) - Steel Erection

Subpart S (1926.800 - 1926.804) - Underground Construction, Caissons, Cofferdam s and Compressed Air

Subpart T (1926.850 - 1926.860) - Demolition

Subpart U (1926.900 - 1926.914) - Blasting and the Use of Explosives

Subpart V (1926.950 - 1926.960) - Power Transmission and Distribution

Subpart W (1926.1000-1926.1003)- Rollover Protective Structures; Overhead Protection

Subpart X (1926.1050 -1926.1060)- Stairways and Ladders

Subpart Y (1926.1071 -1926.1092)- Diving

Subpart Z (1926.1100 -1926.1152)- Toxic and Hazardous Substances

FWS Form 3-2199 05/03 Page 5 of 5

Appendix A

Smarter Solutions

Exceptional Service

Value

NATURAL

RESOURCE

TECHNOLOGY

Environmental Consultants

Site Investigation Completion Report

Crab Orchard National Wildlife Refuge Prairie Creek Undergound Storage Tank Site Carbondale, Illinois

Project No: 2153

DRAFT

August 22, 2014

300 S. Wacker Drive, Suite 2050

Chicago, Illinois 60606

(P) 312.465.1740

(F) 414.837.3608

SITE INVESTIGATION COMPLETION REPORT

CRAB ORCHARD NATIONAL WILDLIFE REFUGE

PRAIRIE CREEK UNDERGROUND STORAGE TANK SITE

CARBONDALE, ILLINOIS

Project No. 2153

Prepared For:

Contracting and Facilities Management

5600 American Blvd. W., Suite 990 Bloomington, Minnesota 55437

Prepared By:

Natural Resource Technology 300 S. Wacker Drive, Suite 2050

Chicago, Illinois 60606

DRAFT

August 22, 2014

John M. Nardozzi, PE Robert C. Woodruff, IV, EIT Principal Engineer Environmental Engineer

Todd A. Lewis Construction Manager

Environmental consultants

WWW.NATURALRT.COM

TABLE OF CONTENTS

1 OVERVIEW .......................................................................................................................................... 1-1

1.1 Site Description and History ...................................................................................................... 1-1

1.2 Corrective Action Summary ...................................................................................................... 1-2

1.3 Site Investigation Summary ...................................................................................................... 1-2

2 SITE DESCRIPTION ............................................................................................................................ 2-1

2.1 Surrounding Area ...................................................................................................................... 2-1

2.2 Local Geology, Hydrogeology, and Hydrology .......................................................................... 2-1

2.3 Local Geography and Topography ........................................................................................... 2-1

2.4 Contaminants of Concern ......................................................................................................... 2-1

2.5 Migration Pathways and Exposure Routes ............................................................................... 2-1

2.6 Current and Future Land Use ................................................................................................... 2-2

3 SITE INVESTIGATION RESULTS....................................................................................................... 3-1

3.1 Description of Activities Completed........................................................................................... 3-1

3.2 Evaluation of Soil Analytical Results ......................................................................................... 3-3

3.3 Evaluation of Groundwater Analytical Results .......................................................................... 3-4

3.4 Groundwater Flow Direction ...................................................................................................... 3-5

3.5 Site-Specific Physical Parameters ............................................................................................ 3-5

3.6 Potable Water Well Supply Survey ........................................................................................... 3-6

3.7 Drilling Methods......................................................................................................................... 3-6

3.8 Monitoring Well Installation and Development .......................................................................... 3-6

3.9 Soil Sampling Protocol .............................................................................................................. 3-7

3.10 Groundwater Sampling Protocol ............................................................................................... 3-7

4 INTERIM CORRECTIVE ACTION RESULTS ..................................................................................... 4-1

4.1 Overview ................................................................................................................................... 4-1

4.2 Excavation and Disposal ........................................................................................................... 4-2

4.3 Excavation Sampling ................................................................................................................. 4-2

4.4 Backfill ....................................................................................................................................... 4-4

4.5 Waste Disposal ......................................................................................................................... 4-4

4.6 Monitoring Well Abandonment .................................................................................................. 4-4

4.7 Asphalt Layer Installation .......................................................................................................... 4-4

5 CONCLUSIONS ................................................................................................................................... 5-1 6 RECOMMENDATIONS ........................................................................................................................ 6-1 7 REFERENCES ..................................................................................................................................... 7-1 8 PROFESSIONAL ENGINEER AFFIRMATION ................................................................................... 8-1

Site Investigation Completion Report Prairie Creek UST Site DRAFT 140822 i

TABLE OF CONTENTS

FIGURES

Figure 1 Site Location/Topographic Map Figure 2 Site Map Figure 3 Soil Boring and Monitoring Well Locations Figure 4 Corrective Action Excavation Location Figure 5A Groundwater Elevations (March 2014) Figure 5B Groundwater Elevations (June 2014) Figure 6A Soil Contamination Values (0 – 5 Feet) Figure 6B Soil Contamination Values (5 – 10 Feet) Figure 6C Soil Contamination Values (10 – 15 Feet) Figure 6D Soil Contamination Values (15 – 20 Feet) Figure 7 Groundwater Contamination Values (June 2014)

TABLES

Table 1a Summary of Historical Soil Analytical Data Table 1b Summary of Soil Analytical Data Table 2 Summary of Groundwater Analytical Data

APPENDICES

Appendix A: IEPA Site Investigation Completion Report Form Appendix B: Analytical Results, Chain of Custody Forms, and Laboratory Certifications Appendix C: Soil Boring Logs Appendix D: Monitoring Well Completion Reports

Site Investigation Completion Report Prairie Creek UST Site DRAFT 140822140814 ii

1 OVERVIEW

1.1 Site Description and History

The Crab Orchard National Wildlife Refuge Prairie Creek Underground Storage Tank (UST) Site had three leaking underground storage tanks removed on December 11, 1995. The site, owned by the U.S.

Fish and Wildlife Service (USFWS), is located at 10239 Campground Drive, Carbondale, Illinois 62901.

The USTs were located at the southwest intersection of Illinois Route 13 and Campground Drive, adjacent to Crab Orchard Lake, in the NW ¼ of the NE ¼ of the NE ¼ of Section 17, Township 9 South of the Centralia Baseline and Range 1 East of the Third Principal Meridian (Figure 1).

Incident #95-2425 was assigned to a release from the USTs on November 30, 1995. It should be noted that detailed information regarding the initial release, tank closures, and tank removal was not available through an open review of Illinois Environmental Protection Agency (IEPA) records. NRT received all available IEPA records through a Freedom of Information Act (FOIA) request. In addition, the Crab

Orchard Wildlife Refuge did not have records pertaining to the initial release, tank closures, or tank removal.

Site Information

Site Name: U.S. Fish & Wildlife Service

Tank Owner/Operator: Crab Orchard Wildlife Refuge, U.S. Department of the Interior

Size & Product of Tanks: (1) 1,000-gal, (1) 2,000-gal, (1) 4,000-gal gasoline

IEMA #: 952425

IEMA Date: 11/30/1995

LPC #: 1998620014

Address: Rt. 2 & New Rt. 13, Marion, Illinois 62959 (As listed in IEPA UST database)

County: Williamson

IEPA Project Manager: Jason Donnelly

A Corrective Action Completion Report (CACR) was prepared by Massac Environmental Technologies, Inc. (Massac) and submitted to the IEPA on May 16, 2003 (Massac, 2003). The IEPA denied the CACR on June 5, 2003 (IEPA, 2003). A Stage 2 Site Investigation Plan (SIP) prepared by Brownfields, Inc.

(Brownfields) was submitted to the IEPA on August 19, 2011 (Brownfields, 2011), and approved on

October 20, 2011 (IEPA, 2011). Following investigation work, a second Stage 2 SIP was submitted to the

1-1

SITE HISTORY/OVERVIEW

IEPA on November 8, 2011 (Brownfields, 2011a), and approved, with modifications, on January 25, 2012

(IEPA, 2012). Following investigation work, a third Stage 2 SIP was submitted to the IEPA on

September 17, 2012 (Brownfields, 2012), and approved with modifications, on November 1, 2012

(IEPA, 2012a). A Stage 2 SIP and Interim Corrective Action Plan (Work Plan) was submitted to the IEPA on December 11, 2013 (NRT, 2013), and approved with modifications, on January 31, 2014 (IEPA, 2014).

A Notification Letter detailing modifications to the interim corrective action excavation was submitted to the IEPA on April 15, 2014 (NRT, 2014).

This Site Investigation Completion Report (SICR) summarizes the site investigation and corrective action performed at the site. The report details activities performed in 2014 by Natural Resource Technology, Inc. (NRT) on behalf of USFWS. In addition, interim corrective action activities performed on-site by NRT in 2014 are documented herein. The IEPA Site Investigation Completion Report Form is provided as

Appendix A.

1.2 Corrective Action Summary

Massac advanced seven soil borings in June 1992 and five additional soil borings in March 1995 to evaluate site soils for the presence of contaminants associated with the petroleum UST system. United

Science Industries (USI) permanently closed three USTs at the facility in December 1995. In June 1999, Massac initiated remedial activities, which included the implementation of soil flushing and air sparging technologies, and the installation of five groundwater monitoring wells (MW-1, MW-2, MW-3, MW-4, and

MW-5). The remedial system was operated from June 1999 through April 2002 (Brownfields, 2012). Upon termination of remedial activities, Massac submitted a CACR to the IEPA on May 16, 2003. The IEPA denied the CACR on June 5, 2003. The IEPA required that additional soil and groundwater sampling be conducted to establish site conditions and to define the extent of soil and groundwater contamination.

In June 2014, NRT carried out interim corrective action activities which included the removal of 357.49 cubic yards (536.23 tons) of LUST impacted soil. Excavation wall samples (N-1, N-2, W-1, W-2, S-1, S-2, E-2, and E-3) were collected for lab analysis on June 24, 2014, prior to backfilling the excavation.

Excavation floor samples were collected from soil borings (F-1, F-2, F-3, F-4, F-5, and F-6) on February

26, 2014, prior to the excavation, in order to avoid groundwater recharge implications during excavation activities. No floor samples were collected following the interim corrective action excavation because the excavation was advanced through the groundwater table. Restoration activities included backfilling the excavation area. The interim corrective action activities were intended to remove source material.

1.3 Site Investigation Summary

As part of site investigation activities, soil samples were collected and analyzed for benzene, toluene, ethylbenzene, and total xylenes (BTEX), methyl tert-butyl ether (MTBE), total lead, and toxicity

1-2

SITE HISTORY/OVERVIEW

characteristic leaching procedure (TCLP) lead. Table 1a summarizes the historical soil analytical results collected by previous consultants and Table 1b summarizes the soil analytical results collected by NRT in

2014. Soil analytical results indicate that the contamination plume has been defined on-site to the most stringent Tiered Approach to Corrective Action Objectives (TACO) Tier 1 Remediation Objectives. See

Figures 6A, 6B, 6C, and 6D for the location of the soil contamination plume.

As part of site investigation activities, groundwater samples were collected and analyzed for BTEX, MTBE, and total lead. Table 2 summarizes of all groundwater analytical results collected on-site.

Groundwater analytical results indicate that the contamination plume has been generally defined on-site with respect to the most stringent Tier 1 Remediation Objectives and other applicable criteria. See Figure

7 for the location of the groundwater contamination plumes.

1-3

2 SITE DESCRIPTION

2.1 Surrounding Area

The former UST site is part of the Crab Orchard Wildlife Refuge. Illinois Route 13 borders the site to the north and the Crab Orchard Lake is immediately west of the subject UST site. Crab Orchard Lake is a man-made reservoir encompassing approximately 7,000 acres. Historically, the reservoir was used as a drinking water source for the National Wildlife Refuge and nearby communities including Carbondale, Carterville, Herrin, and Marion; however, since 1993, use of the lake as a potable water source has been discontinued due to the listing of the Crab Orchard National Wildlife Refuge on the National Priorities List

(NPL) by the US Environmental Protection Agency (USEPA).1

2.2 Local Geology, Hydrogeology, and Hydrology

Information regarding the local geology, hydrogeology, and hydrology was provided in Appendix G of

CACR prepared by Massac and submitted to the IEPA on May 16, 2003 (Massac, 2003). This information is supplemented by the soil boring logs included in Appendix C.

2.3 Local Geography and Topography

The site is part of the Crab Orchard Wildlife Refuge. See Figure 1 for the Site Location / Topographic

Map.

2.4 Contaminants of Concern

Based on the prior investigation work conducted at the site, the initial contaminants of concern for the

UST site were identified as BTEX, MTBE, total lead, and…

This is the start of the file's text. The full file is on GovTribe.