Link Correction on Page 13 Section C.3.5.h

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Correction on Page 13, Section C.3.5.h

C. 3.5 h. Smithsonian Design and Performance Considerations (corrected link)

SD-410 Review Process The Smithsonian SD 410 review, see Attachment J.4.v, is conducted by Smithsonian reviewers responsible for construction and MEP/FP code compliance, life safety, accessibility, and related issues. Therefore, the document packages to be submitted at each phase shall include floor plans, sections and elevations; large-scale plans, elevations, sections and details of any items to be constructed and installed within the space; and security, fire protection, electrical, mechanical, and plumbing drawings where modifications to any of these systems are required. Contractor will be required to respond in writing within three (3) weeks to Smithsonian comments generated by the deliverables through the Smithsonian’s Office of Facilities, Engineering, and Operations (“OFEO”) online “I-Manage” system. For more information on the SD-410 review process, please refer to: http://www.ofeo.si.edu/ae_center/sd-410-process.html