Flint Hill Roof and PV system Specs

View the file

Other files

File Type Posted
FH_ROOF_PV_15_004.pdf PDF
Sol_F15PS00676_Amd_000002.pdf PDF
Sol_F15PS00676_Amd_000001.pdf PDF
wage_decision_rates.txt TXT text file
FH_ROOF_PV_15_004.pdf PDF
Submittal_Log.xls XLS spreadsheet
Section_B_Bid_Form_rev_1_15.doc DOC document
Sol_F15PS00676.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Statement of Work

FLINT HILLS NWR

COFFEY County, North Dakota

REPLACE ROOF PHOTOVOLTAIC SYSTEM

DATE: April 28, 2015

United States Fish and Wildlife Service Division of Engineering 134 Union Blvd.

Lakewood CO 80228 i

TECHNICAL SPECIFICATIONS

FLINT HILLS NATIONAL WILDLIFE REFUGE

COFFEY COUNTY, KANSAS

REPLACE ROOF AND PHOTOVOLTAIC SYSTEM

15-004

INDEX

DIVISION 01 - GENERAL REQUIREMENTS No. of Pages

SECTION 011000 SUMMARY 6

012900 PAYMENT PROCEDURE 1

013200 CONSTRUCTION PROGRESS 2

DOCUMENTATION

013300 SUBMITTAL PROCEDURES 6

014000 QUALITY REQUIREMENTS 2

015000 TEMPORARY FACILITIES AND CONTROLS 3

017700 CLOSEOUT PROCEDURES 4

DIVISION 02 -06 NOT USED

DIVISIONS 07 – THERMAL AND MOISTURE PROTECTION

SECTION 074113 STANDING-SEAM METAL ROOF PANELS 7

DIVISIONS 09 -25 NOT USED– FINISHES

DIVISION 26 – ELECTRICAL

SECTION 260500 BASIC ELECTRICAL MATERIALS & METHODS 5

260519 CONDUCTORS AND CABLES 4

260526 GROUNDING AND BONDING 5

SECTION 260533 RACEWAYS AND BOXES 6

260625 ENCLOSED SWITCHES 3

262416 PANELBOARDS 5

263100 GRID TIED PHOTOVOLTAIC SYSTEMS 14

DIVISION 33 – SITE WORK

SECTION 330500 TRENCHING & BACKFILLING FOR UTILITIES 4

ii

DRAWING TABLE

OF CONTENTS

DRAWING

T-1 Title, Vicinity Map, & Index of Drawings C-1 Site Plan A-1 Roof Plan / Sections A-2 Elevations E-1 Electrical One Line Diagram E-2 Electrical Details

DIVISION 1 SECTION 011000

GENERAL REQUIREMENTS SUMMARY

SUMMARY 011000 - 1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Work under separate contracts.

4. Access to site.

5. Coordination with occupants.

6. Work restrictions.

7. Permits and Fees.

8. Applicable codes, standards, and specifications.

9. Means and methods.

10. Safety.

11. Environmental Protection.

B. Related Requirements:

1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1.2 PROJECT INFORMATION

A. Project Location: 530 W. Maple, Hartford, Kansas 66584.

B. Station Contact Information: Vic Elam, Assistant Project Leader, (620) 392-5553 ext 102.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. A roof replacement and installation of an roof mounted photovoltaic (PV) system for the Shop building at the Flint Hills National Wildlife Refuge is required. Project includes: demolition of existing roof shingles, felt drip edge, roof flashing and replace with new metal roof. Installation of new underlayment, metal roofing, ridge vents, vent flashing and a roof mounted PV system.

1.4 WORK UNDER SEPARATE CONTRACTS

A. General: Cooperate fully with separate Contractors so work on all contracts may be carried out smoothly, without interfering with or delaying work under this Contract or other Contracts.

Coordinate the Work of this Contract with work performed under separate Contracts.

SUMMARY 011000 - 2

1.5 ACCESS TO SITE

A. All operations of the Contractor (including storage of materials) upon Government premises shall be confined to areas authorized or approved by the Contracting Officer. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations to specified building and immediate areas around specified building.

2. Driveways, Walkways and Entrances: Keep driveways and loading areas, and entrances serving premises clear and available to Government, Government Representatives, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

B. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weather-tight condition throughout construction period. Repair all damage caused by construction operations.

1.6 COORDINATION WITH OCCUPANTS

A. Full Government Occupancy: Government will occupy the site and building during entire construction period. Cooperate with Station Manager during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits unless otherwise indicated.

1. Notify Station Manager not less than 48 hours in advance of activities that will affect Station operations.

1.7 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.

B. On-Site Work Hours: Limit work to normal business working hours of 7:00 a.m. to 4:00 p.m., Monday through Friday, unless otherwise indicated.

1. Work on weekends shall be restricted to Contracting Officers approval and at the Station Managers discretion.

2. No work shall take place over Federally recognized holidays.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

1. Notify Station Manager not less than two days in advance of proposed utility interruptions.

SUMMARY 011000 - 3

D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruptions to the Government.

1. Notify Station Manager not less than two days in advance of proposed disruptive operations.

E. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of entrances, operable windows, or outdoor-air intakes.

1.8 PERMITS AND FEES

A. The Contractor shall be responsible for obtaining all necessary local, State, and Federal permits and licenses, and payment of related fees, per the Contract Clauses.

1.9 APPLICABLE CODES, STANDARDS AND SPECIFICATIONS

A. All work shall comply with the codes and standards applicable to each type of work and to this location.

B. Where a conflict occurs between a referenced document and the Project Specifications, the Project Specifications govern.

C. Where a conflict occurs between referenced documents, the document containing the most stringent requirements governs.

D. Where referenced documents are not specified by date, the document current at the bid opening applies.

E. Materials, applications, and tests specified by reference to published standards of society, association, code, or other published standards are included in the specifications as if written in their entirety.

F. Conform to all regulations and statutes of the State of Kansas and to all Federal Regulations which apply.

1.10 MEANS AND METHODS

A. Means and methods of construction shall be such as the Contractor or subcontractors may choose; subject, however, to the Contracting Officer's right to reject means and methods proposed which:

1. Constitute a hazard to the work, persons, or property.

2. Will not produce finished work in accordance with terms of the contract.

3. Are contrary to specified means or methods included in the contract.

B. The right to reject means and methods of the Contractor or subcontractor shall not be construed or interpreted as acceptance of control of means and methods by the Contracting Officer.

SUMMARY 011000 - 4

C. The Contracting Officer's approval of means and methods or failure to exercise right to reject means and methods shall not relieve the Contractor of the obligation to complete the work required by the contract.

D. Total responsibility for control of all means and methods lies with the Contractor for all work.

1.11 SAFETY

A. The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient flasher lights, flagmen, danger signals and signs, and shall take all necessary precautions for the protection of the work and the safety of the public. All ponds and water control structures shall remain accessible by vehicle. Roads closed to traffic shall be protected by effective barricades and shall be placed with acceptable warning signs. All barricades and obstructions shall be illuminated at night and all lights shall be kept burning from sunset until sunrise. Install appropriate traffic signs at crossroads and approaches to site as needed to direct affected public traffic.

B. The Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local regulations pertaining to the protection of workers, visitors to the site, and persons occupying areas adjacent to the site, including the provisions of 29CFR1910 and 29CFR1926 of the Code of Federal Regulations. The Contractor shall hold harmless the Government for failure to comply with any applicable safety or health regulation on the part of himself, his employees, or his subcontractors.

C. Provide personal safety equipment and training commensurate with the hazards which may exist at the work site. The personal safety equipment and training shall be determined by a thorough hazard analysis of all work site areas. The safety program available at all work sites shall include a minimum of:

1. One nonfreezing-type fire extinguisher in each workshop and shed used for storage of materials at the work site and at each work location involving open flame. Place in location readily accessible to construction personnel.

2. A first aid kit for use of construction personnel commensurate with size of project with items necessary for first aid treatment of all injuries.

3. The Contractor shall conduct regular onsite safety inspections and all construction personnel shall receive a safety orientation.

4. Post telephone numbers of nearest hospital, ambulance service or flight for life, and fire station in conspicuous location. Advise all workers of location of telephone numbers.

1.12 ENVIRONMENTAL PROTECTION

A. The Contractor shall abate and control all environmental pollution arising from construction activities by complying with all applicable Federal, State, and local laws and regulations concerning environmental pollution control and abatement, as well as the specified requirements in this contract. Compliance with this requirement by subcontractors will be the responsibility of the Contractor.

SUMMARY 011000 - 5

B. Fossils and Artifacts

1. Should the Contractor discover any fossils or artifacts during construction operations, such objects shall become the property of the Government. The Contractor shall cease construction operations in the area of the "find," and immediately notify the station manager of such discovery. Construction operations may proceed in other areas not affected by this clause. Care shall be exercised by the Contractor not to damage fossils or artifacts uncovered during excavation operations.

2. Failure to comply with this requirement may be considered a violation of the Archeological Resources Protection Act of 1979 as amended. Destruction of historic and prehistoric sites and/or unauthorized collection of cultural materials can result in criminal and/or civil penalties. Penalties can include fines, prison sentences, and/or confiscation of equipment.

3. If the Contractor uses fill from a nongovernmental source to perform work that is required under this project, and a new borrow site is opened or an existing borrow area is expanded in order to obtain such materials, the Contractor shall assure that any new borrow area disturbance meet the requirements of Section 106 of the National Historic Preservation Act.

C. Abatement of Air Pollution

1. The Contractor shall comply with applicable Federal, State, and local laws and regulations concerning the prevention and control of air pollution.

2. Construction activities shall be performed in such a manner that air pollution will be held to a minimum.

3. Burning of materials, trees and brush, combustible construction materials, and rubbish will not be permitted. Construction debris shall be disposed of at a location designated by the Contracting Officer or hauled off the Station to an approved disposal site.

D. Prevention of Water Pollution

1. During construction the Contractor shall comply with all applicable Federal, State, and local laws and regulations concerning the control and abatement of water pollution.

2. The Contractor's construction activities shall be performed by methods that will prevent entrance or accidental spillage of solid matter, contaminants, debris, and other objectionable pollutants and wastes into streams, flowing or dry water-courses, lakes, ponds, and underground water sources. The Contractor shall dispose of all pollutants such as petroleum products, rubbish, cement, concrete, etc., and objectionable material shall be hauled away in tanks or barrels or buried in an approved landfill.

3. Sanitary facilities, such as chemical toilets shall be located far enough from wells, live streams, or ponds to prevent pollution of the water.

4. Dewatering work for structure foundations or earthwork operations adjacent to, or encroaching on, streams or watercourses shall be conducted in a manner which prevents muddy water and eroded materials from entering the streams or water courses. This shall be accomplished by construction of intercepting ditches, bypass channels, barriers, settling ponds, or other approved means. Excavated material shall not be placed in, or adjacent to, watercourses where it can be washed away by high water or storm runoff.

SUMMARY 011000 - 6

E. Environmental Litigation: Time lost due to work stoppage because of failure of the Contractor to comply with these requirements may not be the subject of a claim for extension of time, for additional costs, or damages.

END OF SECTION 011000

DIVISION 1 SECTION 012900

GENERAL REQUIREMENTS PAYMENT PROCEEDURES

PAYMENT PROCEDURES 012900 - 1

SECTION 012900 – PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements necessary to prepare and process Applications for Payment.

1.2 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule.

1. Submit the schedule of values to Contracting Officer at earliest possible date but no later than 7 days before the date scheduled for submittal of initial Applications for Payment.

1.3 APPLICATIONS FOR PAYMENT

A. Progress Payments are allowed for work that has been completed as determined by the following. Payment request shall be submitted using the proper form:

1. Schedule of values.

2. Contractor's construction schedule (preliminary if not final).

3. Prior to payment submittal provide Contracting Officer’s Representative and On-site

Inspector with a copy of Payment Application for verification of work completed. Once verified, submit to Contracting Officer.

B. Final Payment Application: After completing Project closeout requirements, submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:

1. Evidence of completion of Project closeout requirements.

2. Written guarantees, warranties, and certificates.

3. Prior to final payment submittal provide Contracting Officer’s Representative and On-site

Inspector with a copy of Payment Application for verification of work completed. Once verified, submit to Contracting Officer.

END OF SECTION 012900

DIVISION 1 SECTION 013200

GENERAL REQUIREMENTS CONSTRUCTION PROGRESS DOCUMENTATION

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 1

SECTION 013200 – CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Contractor's construction schedule.

2. Construction schedule updating reports.

3. Site condition reports.

1.2 INFORMATIONAL SUBMITTALS

A. Construction Schedule Updating Reports: Submit with Applications for Payment if the current project status is behind the status projected on the most recent schedule.

1.3 COORDINATION

A. Coordinate Contractor's construction schedule with the schedule of values, submittal schedule, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from entities involved.

2. Coordinate, if applicable, each construction activity in the network with other activities and schedule them in proper sequence.

PART 2 - PRODUCTS

2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Time Frame: Extend schedule from date established by the Notice to Proceed to the date of completion.

B. Activities: Treat each task as a separate numbered activity for each main element of the Work.

Comply with the following:

1. Activity Duration

2. Procurement Activities

3. Submittal Review Time: 10 day submittal review

4. Punch List and Final Completion: Include not more than 15 days for completion of punch list items and final completion.

DIVISION 1 SECTION 013200

GENERAL REQUIREMENTS CONSTRUCTION PROGRESS DOCUMENTATION

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 2

C. Constraints: If applicable, include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.

1. Phasing: Arrange list of activities on schedule by phase.

2. Work Restrictions: Show the effect of the following items on the schedule as applicable:

a. Coordination with existing construction.

b. Limitations of continued occupancies.

c. Uninterruptible services.

d. Use of premises restrictions.

e. Seasonal variations.

f. Environmental control.

3. Work Stages: Indicate important stages of construction for each major portion of the Work.

D. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and final completion and the following interim milestones.

1. Insert milestones not indicated elsewhere.

END OF SECTION 013200

DIVISION 1 SECTION 013300

GENERAL REQUIREMENTS SUBMITTALS

SUBMITTALS 013300-1

SECTION 01300-SUBMITTALS

PART 1 GENERAL

1.01 SUBMITTALS - GENERAL

A. Submit action submittals and informational submittals on the technical and administrative aspects of the project. The types of information and documentation required to be submitted during the course of the project may include but not be limited to:

Construction Progress Schedule / Sequence of Operations Schedule of Values Guarantees, Warranties and Certificates Test Reports Technical submittals Project Record Drawings Operation and Maintenance Manuals

B. All submittals shall be sent to the Contracting Officer.

1.02 CONSTRUCTION PROGRESS SCHEDULE / SEQUENCE OF OPERATIONS

A. Submit construction schedule for review within 15 days after Notice to Proceed, to illustrate the sequence and time allotted for each construction activity in order to achieve completion of the work within the time limit specified in the contract.

The schedule shall include the following:

1. Breakdown of work activities in categories as necessary, to allow monitoring of progress of work during construction.

2. Sequence of construction by activity with start dates, duration, and finish dates.

1.03 SCHEDULE OF VALUES

A. Prior to the first progress payment application submit a Schedule of Values to indicate the dollar value of each category of work or construction trade. At a minimum, the Schedule of Values shall have a line item for each specification section in Divisions 1 through 16.

1.04 GUARANTEES, WARRANTIES, AND CERTIFICATES

SUBMITTALS 013300-2

A. Submit guarantees and warranties for building components, systems, or equipment specified to have a warranty period which exceeds the basic one year construction warranty. Complete all blank spaces on warranty forms requiring information prior to submittal.

B. Guarantees shall extend the full period of the required guarantee period after:

1. Replacement of work found defective during guarantee period.

2. Repair of inoperative items or adjustments to proper working condition of items not operating properly at time of inspection at final completion.

1.05 TECHNICAL SUBMITTALS

A. Prior to the use or installation of any material or item specified as requiring submittal, the Contractor shall submit the types of data required by each section of the technical specifications (Divisions 2 through 16). This data may include manufacturer’s product data, shop drawings, schedules, performance data, samples, color selections, test reports, certifications, and instructions.

B. The Contractor shall not perform work for which submittals are required prior to receipt of the submittals or samples, approved by the Fish and Wildlife Service.

C. The Contractor shall allow time in his schedule for submittal review by the

Government of a minimum 10 days from time of receipt by the Contracting Officer to time of return posting.

1.06 PROJECT RECORD (AS-BUILT) DRAWINGS

A. Definition.

1. “Project Record Drawings”, also referred to as “As-Built Drawings” or

“Redlines”, means drawings submitted by the Contractor to show the construction as actually completed under the contract.

B. As-Built Drawing Maintenance

1. Maintain at jobsite one complete set of full-size prints of contract drawings, including amendments and modifications, marked and dimensioned to show variations between the construction shown or specified in the contract documents and that actually provided.

2. Mark as-built drawings to show all deviations from the original contract

SUBMITTALS 013300-3

drawings. Include dimensions, locations, elevations, material sizes and specifications, existing conditions that affected the construction and were not shown, and other information required to show the actual as-built condition. Show buried or concealed construction, utilities, items, and features. Show existing utility lines, items, and features revealed during the course of construction. Accurately locate and record existing topographic features which differ from those shown on the contract drawings.

3. Use standard drafting practice to represent such changes and include such supplementary notes, legends, and details as necessary to clearly portray the as-built construction. Mark the as-built drawings in the following colors:

Red - Additions to the original drawings.

Green - Deletions to the original drawings.

Blue - Any notations necessary to describe or interpret as-built conditions.

4. Maintain as-built drawings as work progresses. Mark drawings as items and features of work are completed. Do not use record drawings for other purposes. Make available for review by Government at all times.

5. Upon completion of work, certify marked-up print set as correct, sign by

Contractor, and deliver to the Contracting Officer.

1.07 OPERATION MANUALS

a. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and the following information:

1) System, subsystem, and equipment descriptions. Use designations for systems and equipment indicated on Contract Documents.

2) Performance and design criteria if Contractor is delegated design responsibility.

3) Operating standards.

4) Operating procedures.

5) Operating logs.

6) Wiring diagrams.

7) Control diagrams.

8) Piped system diagrams.

9) Precautions against improper use.

10) License requirements including inspection and renewal dates.

SUBMITTALS 013300-4

b. Descriptions: Include the following:

1) Product name and model number. Use designations for products indicated on Contract Documents.

2) Manufacturer's name.

3) Equipment identification with serial number of each component.

4) Equipment function.

5) Operating characteristics.

6) Limiting conditions.

7) Performance curves.

8) Engineering data and tests.

9) Complete nomenclature and number of replacement parts.

c. Operating Procedures: Include the following, as applicable:

1) Startup procedures.

2) Equipment or system break-in procedures.

3) Routine and normal operating instructions.

4) Regulation and control procedures.

5) Instructions on stopping.

6) Normal shutdown instructions.

7) Seasonal and weekend operating instructions.

8) Required sequences for electric or electronic systems.

9) Special operating instructions and procedures.

d. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as installed.

e. Piped Systems: Diagram piping as installed, and identify color-coding where required for identification.

f. Provide 3 copies of Operation and Maintenance Manual

PART 2 PRODUCTS

(Not Applicable)

PART 3 EXECUTION

3.01 TECHNICAL SUBMITTAL PROCESS

A. All submittals shall be sent to the Contracting Officer accompanied by a Government-furnished submittal form for each specifications section or group of

SUBMITTALS 013300-5

equipment/materials, which shall be used as the document for approving or disapproving the material. A minimum of four (4) copies of data shall be submitted to allow the Government to retain two copies.

B. Make all submittals of data, items, materials and samples within the time frame necessary to allow the specified review time, and manufacturer’s lead time, fabrication, shipping, etc. so products will be delivered in time for scheduled

SUBMITTALS 013300-6

incorporation into the work Contractor shall check submittals for completeness and conformity to the contract documents, and mark them to this effect before submitting to the Contracting Officer.

C. Submit in sufficient detail to establish conformity with contract requirements and specifications. Shop drawings shall be in sufficient detail compatible with the complexity of the project to adequately illustrate the relationship of major components. Submittals on component parts forming a system, or that are inter-related, shall be submitted together as a single submittal.

D. Where more than one product, option, or feature is described in the submittal, clearly mark the specific item proposed for use. Selection of unmarked items or options will be made by the Government.

E. Reviewed submittals shall be returned to the Contractor marked with one of the following actions:

Approved as submitted.

Approved, except as noted. Resubmission not required.

Approved, except as noted. Resubmission required.

No action taken. See comments on reverse. Resubmission required.

Disapproved.

Other: (comments as noted)

F. The Contracting Officer’s indication of “Approved” on submittals and samples shall not relieve the Contractor from responsibility for deviations from the requirements of the Contract Documents, unless the Government has been notified in writing and has given its approval to such deviation, nor shall approval by the Government relieve the Contractor from responsibility for errors and omissions in submittals.

END OF SECTION 01300

DIVISION 1 SECTION 014000

GENERAL REQUIREMENTS QUALITY REQUIREMENTS

QUALITY REQUIREMENTS 014000 - 1

SECTION 014000 - QUALITY REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for quality assurance and quality control.

1.2 DEFINITIONS

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Contracting Officer.

C. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.

D. Experienced: When used with an entity or individual, "experienced" means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project;

being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.

1.3 CONFLICTING REQUIREMENTS

A. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.

1.4 QUALITY ASSURANCE

A. General: Qualifications paragraphs in this article establish the minimum qualification levels required; individual Specification Sections specify additional requirements.

B. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

DIVISION 1 SECTION 014000

GENERAL REQUIREMENTS QUALITY REQUIREMENTS

QUALITY REQUIREMENTS 014000 - 2

C. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.

1.5 QUALITY CONTROL

A. Government Responsibilities: Where quality-control services are indicated as Government's responsibility, Government or firm acting on the Government’s behalf will perform inspections.

B. Contractor Responsibilities: Inspections not explicitly assigned to Government are Contractor's responsibility. Perform additional quality-control activities required to verify that the Work complies with requirements, whether specified or not.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 014000

DIVISION 1 SECTION 015000

GENERAL REQUIREMENTS TEMPORARY FACILITIES AND CONTROL

TEMPORARY FACILITIES AND CONTROLS 015000 - 1

SECTION 015000 – TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

B. Related Requirements:

1. Section 011000 "Summary" for work restrictions and limitations on utility interruptions.

1.2 USE CHARGES

A. General: Installation and removal of and use charges for temporary facilities shall be included in the Contract Sum unless otherwise indicated. Allow other entities to use temporary services and facilities without cost.

B. Water and Sewer Service from Existing System:

1. Potable water from Government’s existing water system is available for use without metering and without payment for uses directly related to the project. Provide connections and extensions of services as required for construction operations. Provide anti-siphon devices at all temporary connections.

2. The Contractor may use the restroom facilities available within the Shop building. This privilege may be withdrawn if problems with cleanliness are encountered.

3. Plumbing fixtures may not be used for cleaning tools or equipment; building sewers may not be used for disposal of construction waste, including paints.

C. Electric Power Service from Existing System:

1. Electrical power from the existing electrical system within the building is available for use without charge, except for the purpose of temporary heating. The Contractor shall be responsible for providing temporary connections and extensions of services as required for construction operations.

1.3 QUALITY ASSURANCE

A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.

B. Site Maintenance. Maintain exterior site free of scrap and waste material, packaging, and items that could attract rodents or could be wind-blown. Maintain interior floor areas free of scrap and hazardous materials on a daily basis. Provide a trash can with lid for workers food wrappings and waste, and enforce its use.

TEMPORARY FACILITIES AND CONTROLS 015000 - 2

C. Duct Protection. In areas where dust-generating activities are in progress, seal openings into HVAC supply and return ducts to prevent dust accumulation in ducts.

PART 2 - PRODUCTS

2.1 TEMPORARY FACILITIES

A. Storage: Contractor may store material and equipment in area designated by Project Leader and approved by Contracting Officer. Contractor shall provide pallets, tarps, etc. to protect material from the weather.

B. Office: Contractor shall be responsible for providing space for his own office use, such as a mobile or prefabricated structure.

C. Telephone: Contractor shall be responsible for providing temporary cellular or land-line telephone service as required for construction operations.

D. Heat. Contractor shall be responsible for providing temporary heating required in any construction areas open to outside temperatures.

2.2 EQUIPMENT

A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.

B. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and not temporary facilities.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Locate equipment where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.

1. Locate facilities to limit site disturbance as specified in Section 011000 "Summary."

B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.

TEMPORARY FACILITIES AND CONTROLS 015000 - 3

3.2 SUPPORT FACILITIES INSTALLATION

A. Traffic Controls: Comply with requirements of authorities having jurisdiction.

1. Protect existing site improvements to remain including curbs, pavement, and utilities.

2. Maintain access for fire-fighting equipment and access to fire hydrants.

B. Parking: use areas designated by Contracting Officer or Station Manager as parking areas for construction personnel.

C. Waste Disposal: Fuels, lubricants, petroleum products, chemicals or other waste materials shall be disposed of in properly designated areas off Government premises.

3.3 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Protection of Existing Facilities: Protect existing vegetation, equipment, structures, utilities, and other improvements at Project site and on adjacent properties, except those indicated to be removed or altered. Repair damage to existing facilities.

END OF SECTION 015000

DIVISION 1 SECTION 017700

GENERAL REQUIREMENTS CLOSEOUT PROCEDURES

CLOSEOUT PROCEDURES 017700 - 1

SECTION 017700 – CLOSEOUT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Final completion procedures.

2. Closeout Submittals.

3. Final cleaning.

4. Repair of the Work.

1.2 FINAL COMPLETION PROCEDURES

A. Submit a written request for inspection to Contracting Officer to determine Final Completion a minimum of 10 days prior to date the work will be completed and ready for final inspection and tests. Contracting Officer will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Government, that must be completed or corrected.

1.3 CLOSEOUT SUBMITTALS

A. Submit all items listed per the requirements under Section 013300 to the Contracting Officer prior to final payment.

1. Guarantees, warranties, and certificates.

2. Record (As-Built) Drawings.

3. Final reports of all tests.

4. Operation and Maintenance Manuals.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 FINAL CLEANING

A. General: Perform final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

DIVISION 1 SECTION 017700

GENERAL REQUIREMENTS CLOSEOUT PROCEDURES

CLOSEOUT PROCEDURES 017700 - 2

B. Fuels, lubricants, petroleum products, chemicals or other waste materials shall be disposed of in properly designated areas off Government premises.

C. No burning of rubbish on Government premises will be allowed.

3.2 REPAIR OF THE WORK

A. Complete repair and restoration operations before requesting inspection for determination of Substantial Completion.

B. Repair or remove and replace defective construction. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment. Where damaged or worn items cannot be repaired or restored, provide replacements. Remove and replace operating components that cannot be repaired.

Restore damaged construction and permanent facilities used during construction to specified condition.

1. Remove and replace chipped, scratched, and broken glass, reflective surfaces, and other damaged transparent materials.

2. Touch up and otherwise repair and restore marred or exposed finishes and surfaces.

Replace finishes and surfaces that that already show evidence of repair or restoration.

a. Do not paint over "UL" and other required labels and identification, including mechanical and electrical nameplates. Remove paint applied to required labels and identification.

3. Replace parts subject to operating conditions during construction that may impede operation or reduce longevity.

4. Replace burned-out bulbs, bulbs noticeably dimmed by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.

END OF SECTION 017700

DIVISION 7 SECTION 074113

THERMAL AND MOISTURE PROTECTION STANDING SEAM METAL ROOF

STANDING SEAM METAL ROOFING 074113-1

PART 1 GENERAL

1.01 DESCRIPTION OF WORK

A. Remove existing asphalt shingled roof and replace with standing seam metal roofing on specified underlayment materials; associated flashing, trim, and sealants on the Shop Building. The color shall be medium bronze. Contractor must verify all dimensions and quantities.

1.02 QUALITY ASSURANCE

A. Applicable Standards:

1. ASTM A653, “Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated by the Hot-Dip Process”

2. ASTM E1592, “Test Method for Structural Performance of Sheet Metal

Roof and Siding Systems by Uniform Static Air Pressure Difference

3. ASTM E1646, “Test Method for Water Penetration of Exterior Metal Roof

Panel Systems by Uniform Static Air Pressure Difference”

4. ASTM E1680, “Test Method for Rate of Air Leakage through Exterior

Metal Roof Panels Systems”

5. UL 580, “Tests for Uplift Resistance of Roof Assemblies”

6. UL 2218, “Impact Resistance of Prepared Roof Covering Materials”

B. Design Criteria:

1. Roof panels, clips and fasteners shall be designed for a basic wind speed of 90 mph, applied in accordance with the 2012 IBC including amendments by the State of Kansas. The roof panel, clip and fastener shall have been tested and passed a wind uplifting of UL Class 90 for the specified fastener spacing. The roof system shall be listed in Underwriters Laboratories “Roofing Materials and System Directory.”

C. Manufacturers Qualifications:

1. Manufacturer shall have a minimum of 10 years experience in

STANDING SEAM METAL ROOFING 074113-2

manufacturing metal roofing systems. Panels specified in this section shall be produced and finished in a factory environment with fixed base roll-forming equipment. A letter certifying the manufacturer’s qualifications shall accompany the product material submittals.

D. Installer Qualifications:

1. The installer shall have received training and licensing from the metal roofing manufacturer for the installation of the specified system.

2. A letter certifying the installer as a Manufacturer’s Certified Installer shall accompany the submittal package.

1.03 SYSTEM PERFORMANCE REQUIREMENTS

A. Performance testing

1. Metal roof panel systems shall have a maximum air infiltration rate of

0.007 cfm/sqft at a pressure differential of 6.24psf.

2. Metal roof panel systems shall have no uncontrollable water leakage at a pressure differential of 2.86 psf.

3. Metal roof panel systems shall be rated to withstand 120 MPH wind loads.

1.04 SUBMITTALS

A. Submit under provisions of Section 013300.

1. Product Data. Submit manufacturer’s product data including material and finish description, panel profile, anchorage system including provisions for expansion and contraction, accessories, and performance criteria test results. Submit product data for snow retention system components

2. Shop Drawings. Submit shop drawings showing panel width, panel layout, details at ridge, gable, eave, and roof penetrations, and field-applied sealant locations. Submit shop drawings showing snow retention locations on roof and clamp location.

3. Manufacturer’s standard and optional colors on minimum 3" x 4" metal sample chips, for color matching to above specified building.

STANDING SEAM METAL ROOFING 074113-3

1.05 DELIVERY, STORAGE, AND HANDLING

A. Protect products and accessories from damage and discoloration during transit and at project site. Store panels and accessories off the ground, in a dry area, to prevent condensation on the concealed surface.

B. Store rolled materials on end, and off the ground. Protect from moisture.

1.06 WARRANTY

A. Product and installation warranty to be 20 years and include all system panels, components, and accessories manufactured by the panel product producer.

B. Finish Warranty. Provide a written warranty from the roofing panel manufacturer warranting the factory-applied finish on the roofing panels against failure including blistering, peeling, cracking, flacking, checking and chipping for a period of 20 years from date of Final Completion.

C. Weathertightness. The entire roof system including all roof panels, flashings, jacks, etc. shall be warranted against leaks for a period of 20 years, non-prorated.

The warranty shall be issued to the owner by the manufacturer.

PART 2 PRODUCTS

2.01 PANEL MANUFACTURER

A. Panels shall be 24 gage minimum interlocking standing seam. Panel finish shall have a 70% full strength Kynar 500/Hylar 5000 fluoropolymer coating of 1.0±mil totally dry film thickness. A wash coat of 0.2 – 0.3 mils dry film thickness shall be applied to the reverse side.

B. Roof panels with lap type side joints or those requiring battens or other non-integral sealing means or exposed structural fasteners shall not be considered acceptable.

C. Roof panels shall be roll formed in the Manufacturer’s plant to control quality.

On-site roll formed panels are not acceptable.

B. Roof panels shall have plant-installed sealant for quality control.

2.02 MATERIALS AND FABRICATION

STANDING SEAM METAL ROOFING 074113-4

A. Roof

1. Steel Panels: ASTM A653, G90 (lock-forming quality), extra smooth, tension-leveled, galvanized steel, minimum spangle. Thickness 24 gauge.

Panels shall be of the standing seam interlocking design and secured to the supports with a concealed structural fastening system. Panel manufacturer shall recommend fasteners for roof mounted photovoltaic system.

2. The concealed attachment system shall eliminate all through fasteners penetrations of the exposed roofing surface into the structural supports and allow the roof covering to move independently of any differential thermal movement by the framing system. Fasteners shall not be exposed on interior ceiling surface (shall not extend beyond original roof deck).

3. The panel-to-structural clip shall be designed to accommodate on inch of thermal movement in both expansion and contraction. The clip shall incorporate a self-centering feature to assure on inch of movement in both directions.

4. The standing seam panels shall have integral male and female interlocking ribs with a plant applied, non-hardening sealant, and the seams shall be continuously locked or crimped together by mechanical means during installation.

5. Roof panels shall flush horizontal and vertical surfaces, to facilitate sealing at the terminations. Panel configurations which create voids requiring supplemental closure devices shall not be considered acceptable.

6. Roof panels shall be fastened to the support framing members with a concealed clip or backing device of steel having a protective metallic coating. Through penetration of the roofing surface by exposed fasteners shall occur only for non-structural connections at panel termination and roof perimeter flashing locations. Such fasteners shall be corrosion resistant aluminum-zinc ally die cast head steel screws with weather seal washers.

7. Manufacturer shall apply a strippable plastic film to the panels for protection during fabrication.

8. Panel termination and perimeter flashings (attached to roof panels) shall e sealed with sealants recommended and furnished by the Manufacturer.

STANDING SEAM METAL ROOFING 074113-5

9. Roof shall be a medium bronze color, Metal Sales H4 or approved equal.

B. Underlayment Materials

1. Provide self-adhering, polymer-modified, bituminous sheet material at eaves to 6' up roof from face of eave. Material shall be 40 mil thick and meet ASTM D1970. Maximum water vapor permeance of 0.1 perms.

Provide primer when recommended by manufacturer.

2. Provide one layer of 30# asphalt-saturated organic felt, ASTM D 226-89, Type II, over the balance of the roof.

C. Accessories

1. Pre-finished metal flashing and trim matching the color of the roof panels, including ridge cap, gable, rack and eave flashings.

2. Touch-up Paint: matching color, air-drying spray finish.

3. Installation Clips. Minimum 18 gauge stainless steel for concealed securement of panels; designed to interlock with panel seam, and allow expansion and contraction of roofing panels. Exposed fasteners in roofing panels will not be permitted.

4. Fasteners. Self-drilling, pancake head Phillips drive screws, minimum

#10-12 x 1" long.

2.03 ACCESSORIES AND MISCELLANEOUS MATERIALS

A. Field-applied Sealant. Color-coordinated or clear silicone, as recommended by panel manufacturer.

B. Roof jacks. For pipe penetration openings 12 inches in diameter or smaller, flash and seal these penetrations to the roof panel by roof jacks. Roof jack material shall be EPDM with an aluminum sealing rink base. Roof jacks are acceptable, providing attachments can be made in the flat of a panel and no standing seam rib has been altered. For penetration interfering with standing seam rib, provide roof curbs in accordance with the standing metal seam roof manufacturer’s recommendations.

STANDING SEAM METAL ROOFING 074113-6

PART 3 EXECUTION

3.01 PREPARATION

A. Coordinate installation of metal roofing with flashing and trim and gutter/downspouts.

B. Inspect the exposed roof substrate for soundness prior to the start of installation.

Report any unsound substrate to the Contracting Officer immediately. Do not proceed with installation until the substrate is acceptable to the panel manufacturer to meet their warranty requirements.

C. Install the membrane underlayment on sound substrate and according to the manufacturer’s recommendations.

3.02 ROOF PANEL INSTALLATION

A. Install the roof panel system in accordance with the manufacturer’s instructions and approved shop drawings.

B. The installation shall be completed so that it is weathertight.

C. Locate and space all fasteners in accordance with specifications.

D. Install panels and flashings to allow for thermal expansion and contraction.

E. Install flashings or temporarily seal exposed edges of installed panels at the end of each day’s work to prevent water penetration under installed panels.

F. Field cutting of panels, trim, and/or flashing shall be accomplished by hand or electric shears. At no time shall a hot/friction saw be used.

3.03 ADJUSTING AND CLEANING

A. Repair panels with minor damage.

B. Remove panels damaged beyond repair and replace with new panels to match adjacent undamaged panels.

C. Clean exposed panel surfaces promptly after installation in accordance with

STANDING SEAM METAL ROOFING 074113-7

recommendations of panel and coating manufacturers.

D. Remove protective film immediately after installation.

END OF SECTION 074113

DIVISION 26 SECTION 260500

ELECTRICAL BASIC ELECTRICAL MATERIALS AND METHODS

BASIC ELECTRICAL MATERIALS AND METHODS 260500-1

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Supporting devices for electrical components.

2. Electrical identification.

3. Electrical demolition.

4. Cutting and patching for electrical construction.

5. Touchup painting.

1.2 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in

NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

B. Comply with NFPA 70.

1.3 COORDINATION

A. Coordinate chases, slots, inserts, sleeves, and openings through concrete slabs during construction progress to facilitate the electrical installations that follow. Set inserts and sleeves in poured-in-place concrete, masonry work, and other structural components as they are constructed.

B. Sequence, coordinate, and integrate installing electrical materials and equipment for efficient flow of the Work.

C. Coordinate location of access panels and doors for electrical items that are concealed by finished surfaces.

D. Where electrical identification devices are applied to field-finished surfaces, coordinate installation of identification devices with completion of finished surface.

PART 2 - PRODUCTS

2.1 SUPPORTING DEVICES

A. Material: Cold-formed steel, with corrosion-resistant coating

B. Metal Items for Use Outdoors or in Damp Locations: Hot-dip galvanized steel.

C. Slotted-Steel Channel Supports: Flange edges turned toward web, and 9/16-inch- (14

BASIC ELECTRICAL MATERIALS AND METHODS 260500-2

mm-) diameter slotted holes at a maximum of 2 inches (50 mm) o.c., in webs.

D. Raceway and Cable Supports: Manufactured clevis hangers, riser clamps, straps, threaded C- clamps with retainers, ceiling trapeze hangers, wall brackets, and spring-steel clamps or click- type hangers.

E. Pipe Sleeves: ASTM A 53, Type E, Grade A, Schedule 40, galvanized steel, plain ends.

F. Cable Supports for Vertical Conduit:…