20150417_Construction_SOW_Homer_Roof_Repair_REV_8_(Final).doc

DOC document 112 KB Posted

Attached to
ISLAND AND OCEANS VC ROOF REPLACEMENT
Solicitation number
F15PS00447
Issued by

About this file

REVISION 8 - Statement of Work

View the file

Other files

File Type Posted
Sol_F15PS00447_Amd_000002.pdf PDF
oceans_and_islands_roof.zip ZIP file
Sol_F15PS00447_Amd_000001.pdf PDF
Sol_F15PS00447.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work: Islands and Oceans Visitors Center Roof Replacement

PR 000000000 & PR 0000000000

Revision: April 17, 2015

1.0 SCOPE OF OBJECTIVES

1.1 Background:

1.1.1 The US Fish and Wildlife Service Islands and Oceans Visitor Center is located in Homer, AK and is approximately 25,000 square feet under roof. The facility is a multi-story structure that is a steel framed construction built in 2002. The existing roof is aging and in need of replacement. The roof structure is mechanically fastened 60 mil EPDM roof membrane over rigid insulations, wood, and steel decking.

1.1.2 Scope: Provide construction services to remove and replace the existing roof system that meet the following general performance criteria:

1.1.2.1 General: Install sheet membrane roofing and base flashing that are watertight; will not permit the passage of liquid water; and will withstand wind loads, thermally induced movement, and exposure to weather without failure.

1.1.2.2 Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required, as demonstrated by roofing system manufacturer based on testing and field experience.

1.1.2.3 Manufacturer’s Warranty: Provide a full manufacturer’s non-prorated, no dollar limit, material and labor warranty for no less than 30 years. This is a watertight warranty that is good for wind speeds up to 120mph.

1.1.2.4 Roofing System Design: Provide a membrane roofing system that is identical to systems that have been successfully tested by a qualified testing and inspection agency to resist uplift pressure calculated according to ASCE 7 to resist design and wind pressures.

1.1.2.5 FMG Listing: Provide roofing membrane, base flashings, and component materials that comply with requirements FMG 4450 and FMG 4470 as part of a membrane roofing system and that are listed in FMG’s “approval guide” for Class 1 or noncombustible construction, as applicable. Identify with FMG Markings.

1.1.2.6 Conform to ICC and IBC as adopted by the state of Alaska for roof assembly fire hazards and wind uplift resistance requirements. Design for 120 mph wind, Exposure D.

1.1.2.7 Roofing System Design: Provide a roofing system design that is identical to systems that have been successfully tested by a qualified testing and inspection agency to resist factored design uplift pressure calculated according to SPRI. The basis of design is the existing condition as detailed by the provided as-built drawings. Design should utilize to the extent possible the existing condition, and include any modifications necessary to account for increased insulation as required by ASHRAE 90.1.

1.1.2.8 Fire-Test Response Characteristics: Provide membrane roofing materials with the fire-test-response characteristics indicated as determined by testing identical products per test method below by UL, FMG, or other testing and inspecting agency acceptable to agencies having jurisdiction. Materials shall be identified with appropriate markings of applicable testing and inspection agency.

1.1.2.9 Exterior Fire-Test Exposure: Class C; ASTM E 108, for application and roof slopes indicated.

1.1.2.10 Fire resistance Ratings: ASTME E 119, for fire-resistance-rated roof assemblies of which roofing system is part.

1.1.2.11 Flashing: Install/reinstall sheet metal flashing and trim to withstand wind loads, structural movements, thermally induced movement, and exposure to weather without failing. Adhere to 2009 IBC Section 1503 performance standards. Fabricate and install flashings at roof edges to comply with recommendations of FM Loss Prevention Data Sheet 1-49 for wind zone 2, with wind pressures of 31-45 psf.

1.2 Base Proposal:

1.2.1 Demolition: Remove all existing membrane, flashing, and insulation. Dispose of materials as outlined by the general engineering requirements. Remove and dispose of existing large chiller that is currently not operational. Remove and cap existing glycol lines at wall penetration.

1.2.2 Roofing :

1.2.2.1 Fully Adhered EPDM Roof System: Install a 90 mil fully adhered Elastomeric membrane (EPDM). Membrane is to be installed to meet all requirements of the International Building Code (IBC) 2009 Section 1503. The installed membrane must meet all performance requirements outlined in Section 1507.12 of the IBC 2009 for non-ballasted thermoset single-ply roofing. Auxiliary materials recommending by roofing system manufacturer for intended use and compatible with roofing membrane must be used. Installation must meet all manufacturers’ requirements to provide a 30 year watertight warrantee (for wind speeds up to 120mph) for this project.

1.2.2.2 Polyethylene Vapor Retarder: ASTM D 4397, 6 mils thick, minimum, with maximum permeance rating of 0.13 perm (7.5 ng/Pa x s x sq. m.). Utilize tape and adhesive in accordance with vapor retarder manufacturer recommendations.

1.2.2.3 Roof Insulation: Provide preformed roof insulation boards that comply with requirements and reference standards, selected from manufacturer’s standard sizes and of thickness indicated. Achieve a minimum R38. Ensure compliance with the International Building Code Section 1508 and ensure compatibility with roof membrane system.

1.2.2.4 Flashing: Remove and re-use flashing where possible. Provide new flashing to match where necessary to meet code requirements. All weather protection must be installed in accordance with the International Building Code 2009 Section 1503 as well as compatibility requirements and manufacturers guidelines. This applies to ALL weather protection on the roof, new or existing referenced in section 1503 above.

1.2.3 Period of Performance: 120 days from date of award.

1.3 Option 1

1.3.1 Openings

1.3.1.1 Inspect and Re-caulk all exterior windows as needed to eliminate water penetration with an approved caulking suited for this type of use.

1.4 Option 2

1.4.1 In lieu up 90 mil EPDM roof membrane, provide a fully adhered, 80 mil reinforced PVC membrane.

1.5 LOCATION OF WORK

1.5.1 Administrative Field Station:

U.S. Fish and Wildlife Service (USFWS), Islands and Oceans Visitors Center 95 Sterling Hwy Homer, AK 99603

1.5.2 Physical Project Location:

95 Sterling Hwy Homer, AK 99603.

1.6 INQUIRIES

1.6.1 Contracting Officer:

Eric Mead, Contracting Officer, 907-786-3818

1.6.2 Contracting Officer Representative

Jason Hayes, Project Manager, 907-786-3402 Division of Engineering

U.S. Fish and Wildlife Service

1011 E Tudor Rd Anchorage, AK 99503 Jason_hayes@fws.gov

1.6.3 Site Contact:

TBD

1.7 DEFINITIONS

COTR

Contracting Officer’s Representative

LS

Lump Sum

Provide

Furnish and install.

USFWS

U.S. Fish and Wildlife Service

UL

Underwriters Laboratories Design Uplift Pressure The uplift , calculated according to procedures in SPRI’s “Wind Load Design Guide for Fully adhered and mechanically fastened Roof Systems”. Before multiplication by a safety factor

Factored Design Uplift Pressure.

The uplift pressure, calculated according to procedures in SPRI’s “Wind Loading Design Guide for Fully Adhered and Mechanically Fastened Roofing Systems,” After multiplications by a safety factor.

1.8 SITE AVAILIBILITY

1.8.1 The work site is accessible from existing roads. Travel to Homer, AK will be necessary if the contract is awarded to a contractor outside of Homer, AK and all access to the structure must be coordinated with the Contracting Officer or Designated COR prior to arrival.

1.8.2 Work Hours: Monday through Friday, 8:00 a.m. to 5:00 p.m. except federal holidays, unless approved otherwise by the Contracting Officer. Work hours may be extended, with approval of the Contracting Officer to the extent allowable by local ordinance, as long as no access is required to the building. If off hours work requires access to the structure it will only be made available to the contractor a maximum of 2 days per week for one hour before or after normal business hours published above.

1.8.3 Work limits are a staging area (approved by the local USFWS staff) and within 30 feet of the improvements. Primary staging locations will be located away from primary visitor center doors. A portion of the guest and employee parking will be made available for material staging with prior approval by the Contracting Officer. Access to peak visitor use areas must be protected and remain open to the extent possible. Only one entrance may be blocked at any given time, and access must be made in the event of an emergency to allow guests to exit the building through all exits.

1.8.4 USFWS escort required unless previously arranged with the Contracting Officer . Contact the Site Contact above for site access procedures.

1.9 GOVERNMENT FURNISHED EQUIPMENT, MATERIALS, INFORMATION

1.9.1 USFWS will provide the Division 01000 – General Engineering Requirements.

1.9.2 As built drawing set.

1.9.3 As Designed AutoCAD drawings.

1.10 INSPECTION AND ACCEPTANCE

1.10.1 Inspection: The Work is subject to observation and/or inspection by the USFWS and other authorities having jurisdiction.

1.10.2 Acceptance: Acceptance of the work is contingent on compliance with the requirements set forth in the specifications, drawings, and other documents awarded with (or referenced by) the contract for this project.

1.11 CONSTRUCTION COST PROPOSAL

1.11.1 At the time of offer, submit the following

1.11.1.1 Qualification letter from the roof system manufacturer showing that you are a licensed installer of the proposed roof system at the location listed in this proposal.

1.11.1.2 Experience detailing a minimum of 7 years of experience performing similar size and scope of work.

1.11.1.3 Work breakdown structure (WBS) that details the construction cost according to the CSI Uniformat breakdown of construction systems. The work breakdown structure should include a detailed task list and identify cost and duration of each task which are related to the overall project schedule.

1.11.1.4 Preliminary project schedule.

1.12 DELIVERABLES AND MEETINGS

1.12.1 Provide a manufacturers letter identifying the contracted installer as a licensed and certified installer of their product.

1.12.2 Provide a manufacturers letter identifying the proposed product as suitable for this project scope and location.

1.12.3 Provide a complete, detailed roof plan with cross referenced, manufacturer approved, details of all flashing, penetrations, and transitions for review by the COR and edge conditions.

1.12.4 All submittals must be reviewed by the COR prior to receiving a notice to proceed from the Contracting Officer.

1.12.5 Deliverables & submittals shall be electronic; typically as Adobe, Word, Excel. Final drawings Adobe and AutoCAD with CTB plot file.

1.12.6 Routine submittals shall be delivered to the USFWS in Anchorage, AK via FEDEX or electronic submission via email to the Contracting Officer. Resolve routine review comments with the Contracting Officer’s Representative by e-mail, fax, and telephone.

1.12.7 informational including plans, details, and data sheets on all aspects of the roof must be submitted for review by the COR and allow 10 working days to review and response.

1.12.8 Meetings(See General Engineering Requirements for more Detail)

1.12.8.1 Site visit

Reference the SF 1442 for Site Visit information (date and time).

1.12.8.2 Pre-Construction Conference

Should occur prior to any site work progressing and is a condition of receiving a Notice to Proceed (NTP) issued by the Contracting Officer.

1.12.8.3 Final Walk through

1.12.9 Submit a letter of warrantee documentation from the manufacturer certifying that the installation described herein is covered for no less than 30 years for water tightness at windspeeds up to 120mph.

1.13 SCHEDULE OF ACTIVITIES

1.13.1 Project Schedule (or as otherwise agreed with awarded fee proposal.) Schedule shall follow contract clause 52.211-10 After Award Target Date

Event (Office Entry)

10 Days

Conduct Pre-Con and Bonding Review.

20 Days

Submittals due

20 Days

Order Materials & Mobilize to Site 70 Days

Construction Period 120 Total Days

Final Inspection & Acceptance Statement of Objectives 14 April, 2015