Sol_F15PS00173_Amd_000002.pdf

PDF 103 KB Posted

Attached to
IDIQ Conservation, Habitat, Wetland, Restoration
Solicitation number
F15PS00173
Issued by

About this file

F15PS00173

View the file

Other files

File Type Posted
Sol_F15PS00173_Amd_000001.pdf PDF
F15PS00173_Wetland_Habitat_Restoration1.docx DOCX document
Sol_F15PS00173.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

F15PS00173

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

F01

PORTLAND OR 97232-4181

911 NE 11TH AVENUE

EASTSIDE FEDERAL COMPLEX

FWS, DIVISION OF CONTRACTING AND GE

05/08/2015000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/20/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Indefinite Delivery Indefinite Quantity (IDIQ) for Engineering Services. Phase 1 Base

Contracts - to firms selected exclusively using technical factors, i.e. technical capability/ experience, past performance and management experience. Failure of any IDIQ contractor to actively participate when requested to propose on a requirement, may result in the Government determining not to enact an option period. Small Business Set Aside 100%

NAICS 541330 Engineering Services $15,000,0000

Phase 1 is evaluating for best value of experienced firms that can perform necessary engineering service, while Phase 2 will be issuance of Individual Task Orders (TO).

Orders will be based on the firms hourly price schedule (fully loaded) and estimated hours

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Lorrie Gleghorn

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

F15PS00173/000002

to complete projects. Each TO will state the services required and time for completion.

Amendment 1

5/8/2015

The following changes to the solicitation are in effect as of May 8, 2015.

1) See Revised Pages 3 and 5

A) Delete the following language on page 3 and anywhere else in the document that it may appear -

"During Phase 2, Individual Orders will be negotiated with number 1 ranked firm, if unable to come to a binding agreement, negotiations will be ended and negotiations will start with the second firm."

B) Add language in the general scope of work to indicate that some projects will be in tidally influenced wetlands and streams. Add a Section

1.2.3 under "Location of the Project Work" on page 5, as follows:

1.2.3 Projects may be located in various habitat

types, including both inland and tidally influenced wetlands and streams.

Applicable Service Contract Act prevailing wage determination will be provided with each Task

Order.

Questions and Answers

1. Can the 5 example projects come from the team, or do they solely need to come from the Prime?

Answer: Yes the 5 examples projects need to come from the Prime.

2. Under #1, does the stipulation (subcontract less than 50%) refer to every project, or the complete 5 year solicitation term?

i. Answer: The 50% pertains to the Prime contractors overall involvement on each Task Order

3. Can #5 and #8 come from the team ¿ or do they need to come from the Prime?

i. Answer: We are evaluating for two prime contractors who have experience and capability to do at least 50% of all projects. If subs were to provide the answers to the questions, then we would not know that the prime has the capability to do the work. If the prime has worked on a prior project with a specific sub then I would say they have the experience.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

F15PS00173/000002

4. Who is/are the technical lead(s) from USFWS on this contract?

i. Answer: Usually the lead USFWS biologist where the project will be located and partnering cooperators.

5. The solicitation says that 50% of the contract must be served by the prime firm. If two small businesses team on the project -- is it acceptable for them to share the responsibilities and percentage of workload --as one prime?

i. Answer: See number 1 above.

6. Typically we use the SF330 Section E for federal submittals, do you have a preference for resume formats?

i. Answer: We are not considering this A & E or Construction, This is for a Service Contract

Award against Product Service Code F ¿ Natural

Resources and Conservation Services. Service

Contract Act prevailing wage determinations will be provided with each Task Order as applicable.

7. Are we restricted to five key personnel for resume submittal or would it be acceptable to have additional resumes for interdisciplinary staff?

i. Answer: The evaluation team will only look at the first five key personnel resumes.

8. Is there a page limit preference on resumes?

i. Answer: Resumes should not be more than 2 pages each and are part of the Management Experience: FACTOR 3

9. Do subcontractors need to be signed up with

SAM?

i. Answer: Not at this time. It is recommended that any potential government contractor be registered.

10. Is it recommended that Subcontractors also have a FEDCONNECT registration?

i. Answer: It is recommended that any potential government contractor be registered.

11. In Factor 1 of the RFP, you ask for ¿offerors [to] submit five past complex

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

F15PS00173/000002

conservation/restoration projects¿¿ Are we limited to five projects for the entire team, or can we submit project examples for subconsultants in addition to the Prime¿s five?

i. Answer: See number 1.

12. Sections E, H and I appear to be directed at construction contractors, not A&E design firms.

Was this an oversight, or does the USFWS seek bidders to also have a construction branch?

i. Answer: We may have some Service Contract Act ¿construction¿ see Page 3

13. Similarly, in Section M, in the second paragraph under Factor 1 and bullet 5 under

Factor 3, it is stated that a Project Management

Plan and Safety Plan should be submitted:

i. Answer: no-comment

ii. Answer: Project Management Plan and Safety Plan can come as an attachment, and not be counted against the 10 page limit.

14. Should project examples and resumes be provided in SF 330 format?

i. Answer: no comment

15. If resumes from 5 key staff are required, are these included in the 10-page limit for Volume 3?

i. Answer: yes

16. 15. In the middle of page 2 of the RFQ it states, ¿During Phase 2, Individual Orders will be negotiated with number 1 ranked firm, if unable to come to a binding agreement, negotiations will be ended and negotiations will start with the second firm.¿ Is it the intent of the USFWS to work with mainly one firm/team, or do you think that there will be reasonable opportunity for firms ranked 2nd, 3rd, or 4th to also have work under this IDIQ? As written you have created a situation that is `winner takes all¿. Is that your intent?

i. Answer: verbiage changed

17. Page 41, Item 1 states, ¿Must be able to complete projects without needing to subcontract more than 50% of project budget for completion of discrete project tasks.¿ Does this mean that the subcontractor can only use up to 50% of the total project budget, or that the subcontractor can only use up to 50% of each project task?

i. Answer: The plan is to only have at least two base contracts and request task order

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

5 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

F15PS00173/000002

proposal from those each time we have a requirement. If one of the awardees doesn¿t have a specialty and we need it and the other does, then we would ask the requester to send a justification memo recommending the one contractor that could provide the service.

18. We have considerable fish passage and fish barrier design and construction experience in

Montana. Item 8, page 41 states, ¿Must have completed successful restoration projects in

Washington, Oregon or Idaho entailing assessment, planning, recommending and restoration oversight for the following types of projects: roughened channel design; fish passage at small dams that meet state and federal passage requirements, and fish passage at road crossings that meet state and federal passage requirements.¿ If we do not have fish passage experience in the three states listed, but do have experience in other states, would we be disqualified from bidding on the solicitation? Or is the fish passage experience in those three states simply preferred?

i. Answer: The intent is not eliminate or disqualify any firms. But to acknowledge experience in specific areas. The Pacific

Northwest is unique in terms of many of the species present, life history requirements of these species, habitat types, climate, geology, and the rules and regulations that govern restoration activities. Previous experience with all these factors is important to successful restoration projects.

19. Why is the IDIQ titled ¿Wetland Restoration¿ if all of the example projects on page 5 (section

1.4.4) are fish passage and stream restoration projects? Will more wetland focused projects be forthcoming?

i. Answer: I change the title a couple of times trying to figure out what would fit and still be descriptive of the requirement, maybe I didn¿t do so well. Additional wetland and stream projects not identified in the solicitation are expected to be forthcoming.

20. Is this RFP associated with a specific program within the USFWS? Another way to ask this is, do the example projects listed in the

RFP have any relationship to one another, such as anadromous fish habitat improvements, etc. or are they completely unrelated projects?

i. Answer: Our Partners for Fish and Wildlife Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

6 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

F15PS00173/000002

Program, Coastal Program & various fisheries programs is interested in these awards to simplify the process by having set awards for projects as they become known.

21. Is more information available on the 5 listed projects on page 5 of the RFP? For example, are they mainly focused on in-stream work, or are they more focused on riparian or wetland restoration?

i. Answer: not all projects are known, but the types of expertise needed to do them are listed in other areas of the solicitation.

22. Is wetland experience in estuaries and coastal areas a requirement under this IDIQ?

Another way to ask this is, will the USFWS contract with a firm that only does work in freshwater?

i. Answer: no, The way it¿s written now, we¿re not requiring experience in coastal and estuarine areas, but some projects will likely be in these areas.

23. Will the USFWS look unfavorably at teams that have more than one firm on them? If so, how would that be reflected in the scoring?

i. Answer: Team information is not needed unless the prime is providing the names of their key personnel. The evaluation factors are going to be based on the primes experience to include previous subcontractors. (but, not new teams that haven¿t worked with the Prime ¿ that would basically show that the prime didn¿t have the experience with that sub.)

24. Does the USFWS want teams that can do everything, or would you consider having qualified vendors that specialize in specific disciplines or geographic areas?

i. Answer: we need qualified prime contractors who can do the projects and are familiar with the geographic areas.

Period of Performance: 06/15/2015 to 06/14/2020