Harpers Ferry Center
NATIONAL PARK SERVICE
STANDARD EXHIBIT FABRICATION
SPECIFICATIONS
DECEMBER 2006
P.O. Box 50 Harpers Ferry, WV 25425-0050
National Park Service U.S. Department of the Interior
Standard Exhibit Fabrication Specifications
Harpers Ferry Center Harpers Ferry, West Virginia
Table of Contents
Division 1 Project Management
Division 2 Fabrication Drawings
Division 3 Samples/Mock-ups/Prototypes
Division 4 Exhibit Structures
Division 5 Electrical/Electronic
Division 6 Graphics
Division 7 Conservation Guidelines
Division 8 Setup and Installation
Division 9 Project Closeout i
Harpers Ferry Center
Division 1. PROJECT MANAGEMENT
1.1 Introduction
Schedule, coordinate, oversee, and manage work produced and installed under this contract.
1.2 Contacts
The Project Manager shall be the single point of contact between the contractor and the National Park Service (NPS) Contracting Officer's Representative (COR).
1.3 Specific Requirements
The contractor's Project Manager shall be in contact with the COR, Harpers Ferry Center, on no less than a weekly basis. The Project Manager shall perform the following work:
A. Quality Control - Provide quality control to ensure that all elements of project work meet the requirements of the contract specifications and that all modifications are implemented. Provide routine inspections of shop-fabricated work and subcontracted work. Oversee quality of all work during installation.
Ensure that all work not acceptable or compliant with the specifications is corrected prior to inspection or review by the COR.
B. Schedule - Track work progress to ensure that the project is completed according to the schedule. Coordinate and confirm the dates for shipment, delivery, and installation of the work at the exhibit site with the COR.
C. Meetings - Meet with the Contracting Officer and COR in accordance with this
Division, 1.4, Meetings and Inspections, and as specified in individual task orders.
D. Travel - In accordance with this Division, 1.5, Travel, and as specified in individual task orders.
E. Government-Furnished Materials - Receive all government-furnished materials and inspect the materials to ensure that the quality is suitable for use in the exhibit. The Project Manager shall notify the COR immediately if government-furnished materials are not received in sufficient time to meet critical milestones, if damaged, or when use of the material would result in an unsatisfactory product.
F. Organize Resource Materials - Identify and compile all resource material into a production package and ensure that this material is forwarded to the appropriate unit or person within the contractor's organization for use in the project.
Harpers Ferry Center
G. Submittals - Coordinate all contractor's submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward all submittals to the COR for review and approval. Receive all reviewed submittals and take appropriate action according to the approval or rejection by the COR.
1. Approved Submittals - Ensure that all changes, revisions, or additions are noted, and fabrication drawings and instructions are updated and forwarded to the COR.
2. Rejected Submittals - When submittals are rejected, the COR will notify the Project Manager, in writing, identifying the reasons for rejection. The Project Manager shall revise and/or correct and resubmit, identifying changes.
H. Final Inspection - Inspect completed work, including that of subcontractors, prior to final inspection by the COR and shipment to the site. Ensure that all elements of the project are complete and ready for the final inspection. The Project Manager shall notify the COR prior to the inspection if any elements will not be ready for final inspection as scheduled.
I. Delivery and Installation - Ensure that all work is delivered and installed as scheduled. In the event that the COR reports problems during or after shipment, delivery, and/or installation, the Project Manager shall:
1. Determine the nature of the reported problem, damage, or production error and provide a proposal for resolution to the COR for review and approval; and
2. Ensure that approved corrections or repairs are made in a satisfactory manner within the time scheduled by the COR.
J. Closeout Package - Compile, prepare, and forward a closeout package to the
COR in accordance with Division 9, Project Closeout.
1.4 Meetings and Inspections
The contractor's Project Manager shall meet with the Contracting Officer and COR as specified below and in individual task orders. After all scheduled meetings, the Project Manager shall prepare and provide written documentation to the COR enumerating all issues discussed and decisions made relative to the project.
Harpers Ferry Center
A. Postaward Conference - The minimum agenda for this meeting includes the following:
1. General project review, including discussion of the following:
a. Contracting Officer and COR responsibilities;
b. Specifications and other work requirements;
c. Special contract requirements;
d. Correspondence procedures;
e. Subcontractors;
f. Delays and extensions;
g. Contract modifications;
h. Changes;
i. Submittals;
j. Project schedule;
k. Orientation to the park, including key personnel, location, and special conditions onsite; and
l. Billing and payment procedures.
2. Provide government-furnished material to the contractor, including drawings, plan documents, reference and source materials, and other related materials.
3. Review of exhibit plan and design.
4. Review of government-furnished reference and source materials.
5. Inspect and measure artifacts, verifying final dimensions.
Harpers Ferry Center
B. Progress Meetings and Inspections - The COR will schedule progress meetings to coincide with project work inspections at the contractor's facility. The minimum agenda for the progress meetings includes the following:
1. Inspection of work in progress and completed work;
2. Identification of problem areas and discussion of proposed solutions;
3. Review of schedule;
4. Discussion of planned progress during succeeding work period; and
5. Discussion of work standards and practices to maintain quality.
C. Pre-installation Meeting - The COR will meet with the Project Manager, Installation Team, and others of the contractor's staff, at the contractor's facility, prior to shipping and installation of the exhibits. The minimum agenda for the Pre-Installation Meeting includes the following:
1. Inspection of the fully setup staged exhibits as specified in Division 8, Setup and Installation.
2. Review of existing conditions at the installation site, identifying potential problems and proposed solutions.
3. Review of installation schedule, including:
a. Sequence in which work will be shipped, unloaded, setup, and installed; and
b. Projected work schedule onsite, including working days and hours.
4. Review of preliminary maintenance manual in accordance with Division 9, Project Closeout.
1.5 Travel
The Project Manager shall travel to Harpers Ferry Center, Harpers Ferry, West Virginia, to the park site, or to other locations as specified in individual task orders in order to attend meetings and perform other duties required under the contract.
Harpers Ferry Center
A. Postaward Conference - The Project Manager shall travel to Harpers Ferry
Center, Harpers Ferry, West Virginia, to the park site, or to other locations in order to attend the postaward conference. The location will be specified in individual task orders.
B. Site Visits - The Project Manager shall travel to the park to review existing conditions prior to fabrication of the exhibits. The Project Manager shall make additional trips to the site as specified in individual task orders in order to review conditions that have changed or to examine artifacts not available to be viewed previously. At a minimum, the Project Manager shall perform the following:
1. Assess existing conditions for onsite work. Take detailed measurements of the exhibit space to ensure proper fit of all exhibit elements. The contractor shall assess locations of heating and ventilation ducts, doors, windows, lighting fixtures, wall switches and controls, security system alarms and sensors, changes in floor level, floor finishes, ceiling beams, building structures and finishes, and other elements which impact on proper fit and operation of the exhibits;
2. Assess existing conditions which impact on the installation of the exhibits, including: unloading areas, doorway clearances, curbs, stairs, elevators, available storage areas, available areas for setup of power tool work stations, offsite facilities for disposal of debris, parking, and local availability of food, gas, hardware, and other supplies and services;
3. Assess existing electrical and lighting systems for determination of their impact on installation and operation of all exhibit elements;
4. Inspect and measure artifacts, verifying final dimensions; and
5. Meet with the general contractor, as specified in individual task orders, to exchange contact information for future coordination of work and to review and inspect the ongoing progress of the general contractor’s work as it relates to the exhibits.
C. Installation - Travel to the park to oversee installation of exhibits at the site by the Installation Team, and to submit the Final Maintenance Manuals to the COR, in accordance with Division 8, Setup and Installation, 8.4, G.
Harpers Ferry Center
Division 2. FABRICATION DRAWINGS
2.1 Introduction
Provide drawings for review and approval detailing proposed fabrication of all structures indicated in the government-furnished exhibit design drawings and other elements as specified in individual task orders. Provide drawings documenting fabrication of the completed exhibits, including illustrations describing operational and maintenance procedures.
2.2 Specifications
A. Review all measurements relating to the fabrication and installation of work required under this contract.
B. Prepare Fabrication Drawings and Revised Fabrication Drawings.
Incorporate all changes required into fabrication drawings and all additional elements specified in individual task orders that were not included in the exhibit design drawings. Fabrication drawings shall include the following that are changed from, or in addition to, the government-furnished exhibit design drawings:
1. Plan, Elevation, and Section View Drawings indicating final dimensions and layouts;
2. Materials, Finishes, Colors, and Hardware identified, including manufacturer's name and associated color, finish, or product identification number. Provide up-to-date information on all colors, finishes, and products; and
3. Exhibit Elements in Drawings Identified and Numbered in accordance with original government-furnished exhibit design drawings and in accordance with Attachment B, Exhibit Numbering System Guidelines.
C. Provide catalog cuts for all equipment and hardware, as specified in Division
3, Samples/Mockups/Prototypes, 3.2.A.
D. Execute Isometric Drawings to illustrate access into the exhibits for maintenance and repairs by the park staff. Drawings shall include, but are not limited to, access into all exhibit artifact cases, audiovisual equipment, lighting equipment, and storage areas inside the exhibits. The isometric drawings shall be incorporated into all copies of the maintenance manual.
E. Prepare Artifact Mount Drawings, in accordance with Division 7, Conservation
Guidelines, 7.7,B.
F. Prepare a Preliminary Maintenance Manual in accordance with this Division, 2.4.F.
Harpers Ferry Center
G. Prepare As-Built Drawings in accordance with this Division, 2.4, G.
2.3 Materials
The contractor shall provide all materials for the production of work included in this Division.
2.4 Execution
A. Drawing Technique - General
Drawing sheet size shall match the government-furnished exhibit design drawings, since the contractor's fabrication drawings will be incorporated with the exhibit design drawings by the NPS upon completion of the project. Because completed drawings are entered into the government microfilm system, the contractor shall prepare them so they can be reproduced as clear and legible half-size prints. The contractor shall use American National Standards symbols.
Each drawing shall be identified with the park name, project name, exhibit number, sheet number, and date of submittal.
B. Fabrication Drawings
The contractor shall prepare and submit, for review and approval by the COR, fabrication drawings in quantities of copies as specified in individual task orders.
C. Revised Fabrication Drawings
As specified in individual task orders, the contractor shall prepare and submit revised fabrication drawings incorporating all corrections or revisions required by the COR. If revised fabrication drawings are not specified in individual task orders, all corrections and revisions shall be incorporated into the as-built drawings.
D. Isometric Drawings
The contractor shall prepare isometric drawings for inclusion into the maintenance manual in accordance with Division 9, Project Closeout. The isometric drawings shall illustrate access into exhibit artifact cases, audiovisual equipment, lighting equipment, storage areas within the exhibits, and any other maintenance and operation procedures which require illustrations to supplement the written instructions.
Harpers Ferry Center
The drawings shall be prepared for an 8-1/2" x 11" format and shall be punched for a three-ring binder. The drawings shall include notations to clearly communicate the step-by-step procedures for operating locking mechanisms, opening access doors, removing silica gel, replacing lamps, and all other relevant maintenance procedures. The contractor shall be responsible for making the instructions accurate and clear for the park staff. The alternative use of photographic images to illustrate the instructions instead of drawings is acceptable with prior approval by the COR, if the images provide equal or greater clarity of information.
E. Artifact Mount Drawings
In task orders in which artifact mounting is included in the scope of work, the contractor shall provide artifact mount drawings for review and approval by the COR. The drawings shall illustrate all custom hardware to be used to mount artifacts in the exhibit, identifying relevant artifact number, dimensions, materials, and finishes. Where identical mounts are to be used for multiple artifacts, the contractor may submit a typical drawing that identifies the artifacts referred to by number. Materials and finishes shall be in accordance with Attachment E, Summary of Exhibit Conservation Guidelines, and Division 7, Conservation Guidelines, of these Specifications.
F. Preliminary Maintenance Manual
Maintenance manuals shall be prepared and submitted to the COR on the following schedule: a preliminary draft of the maintenance manual shall be submitted with the fabrication drawings and catalog cuts; completed maintenance manuals shall be submitted at the installation of the exhibits; and one copy of the completed maintenance manual shall be submitted with the closeout package.
Prepare a preliminary maintenance manual for review and approval by the COR.
The preliminary maintenance manual shall be assembled into a three-ring binder and shall include, at a minimum, a table of contents, tabbed and labeled page dividers for each section including those sections for which no content is available at this time, and all content information that is appropriate for development at this phase of the project such as catalog cuts, maintenance instructions, list of vendors, suppliers, and subcontractors.
1. Assembly of Maintenance Manual
Pages shall be 8-1/2" x 11" sheets and shall be punched and inserted into three-ring binders. Insert a full-length sheet of card stock into the sleeve along the spine of the binder labeled "Maintenance manual," the name of the project, site, and month/year of installation.
Harpers Ferry Center
Organize the manual in sections in accordance with 2.4, F.2, and separate each section with labeled and tabbed dividers. Organize content of the maintenance manual to facilitate easy use as a reference document. Include page numbers or headers, and organize information in a logical manner.
When audiovisual equipment is installed as part of the exhibit, the maintenance manual shall consist of two volumes, the second of which shall be dedicated to the operation and maintenance of the audiovisual equipment.
2. Content of Maintenance Manual
a. Title Page - Provide a title page with the name of the exhibit, the site, and installation date.
b. Table of Contents - Provide a list of contents.
c. Contract Information - Provide name, address, and telephone number for all contractors and suppliers who produced work for the exhibit, identifying the portion of the work which they provided.
d. Cleaning Instructions - Provide instructions for cleaning all exhibit structures, finishes, graphic panels, tactile models, and screen printed material. Include brand names of recommended cleaning materials. Provide the name, address, telephone number, and website (if applicable) of the manufacturers or distributors of the cleaning products. Listed cleaning products shall correspond with supplies included in the maintenance kit furnished by the contractor. "Not to be used" materials and techniques shall be identified.
e. Repair Instructions - Describe specific techniques for repairing damage to exhibit surface materials such as: wood and painted finishes, screen printed areas, plastic laminates, faux finishes, fabric, metal, acrylic, polycarbonate, and glass.
f. Artifact Care and Handling - Provide information or direction for care, maintenance, and cleaning of the artifact mounts, including how to detach the object from the mount. Provide copies of all final artifact mount drawings.
g. Product List and Catalog Cuts - List brand names of off-the-shelf products purchased for use in the exhibit and the name, address, telephone number, and website address (if applicable).
Harpers Ferry Center
Provide legible machine copies of catalog cuts for all products listed. However, if copy of original cannot be produced without loss of readability, original catalog cuts shall be provided. Include at least one original copy of the manufacturer's information packed with contractor purchased off-the-shelf equipment, inserted into 8- 1/2” x 11" clear plastic sleeves, punched for three-ring binders.
h. Warranties - Provide manufacturer's warranties for all off-the-shelf equipment purchased by the contractor.
i. Access Instructions - Provide visuals clearly and sufficiently illustrating access to artifacts, desiccant, lighting equipment, mechanical devices, and audiovisual equipment within the exhibits. The illustrations shall include the exhibit number(s), step-by-step instructions, and any other information relevant to opening or dismantling the structures. The illustrations shall be accomplished in one or both of the following ways:
1) Isometric or exploded view drawings, as specified in this
Division, 2.4, D.
2) Photographs combined with text, showing a person following the step-by-step instructions. Include close-up views of specialized locks or hardware, identified by captions.
j. Electrical and Mechanical Instructions - Provide maintenance and operation instructions for all lighting, electrical, and mechanical equipment as follows:
1) As-Built Lighting Plan
(a) As-built drawings of the exhibit lighting plan which shows final fixture placement, orientation, and the lamp specifications for each fixture.
(b) Identification of the manufacturer and model number of all fixtures, including any specialized equipment such as gels, diffusers, and louvers.
(c) Specific instructions for re-lamping.
2) Wiring Diagrams - Include as-built wiring diagrams for all lighting and equipment installed by the contractor. Include a copy of government-furnished instructions for repair or replacement of audiovisual equipment.
Harpers Ferry Center
3) Catalog Cuts - Catalog cuts and manufacturer's printed instructions for all ceiling lighting fixtures, lighting tracks, lighting track fixtures, lamps, connectors, transformers, adapters, power strips, clocks, sensors, timers, ventilation fans, thermostats, motors, switches, pushbuttons, fibers, lenses, illuminators, dimmer controls, or other electrical, mechanical, or lighting equipment.
k. Color and Finish Samples -
1) Provide actual samples of all materials used in the exhibit such as: woods, veneers, masonry, metal trim, laminates, fabrics, carpets, paints, and inks. Material shall be mounted on 8-1/2" x 11" white illustration board, clearly labeled with the color name and number, the manufacturer's brand name, and other pertinent product identification, keyed to the drawings for location.
2) One 8-1/2" x 11" mounted sample shall be provided for each type of digital output print and for each screen printing ink color and substrate combination used in the exhibit.
3) Samples of specialized techniques such as sandblasted or etched graphics or finishes shall also be provided.
l. As-Built Exhibit Plan – The contractor shall update the government-furnished planning database to reflect all changes that occur during fabrication, and provide a hard copy and electronic version of the resulting as-built schedules and facsimiles. All revisions and updated information shall be clearly noted.
m. As-Built Exhibit Drawings - Include one copy of as-built exhibit drawings printed onto 11” x 17” sheets as specified in this Division, 2.4, G.
3. Volume 2, Audiovisual Operations Manual
The contractor shall provide a separate notebook that contains the audiovisual operations manual. This manual shall describe the operation and simple troubleshooting of the audiovisual systems specified in individual task orders. Each copy shall include the owner’s operating/service manuals for each item of equipment used in the specified system. The manual content minimum shall be:
Harpers Ferry Center
a. Title Page - Provide a title page with the name of the exhibit, the site, and installation date
b. Table of Contents - Provide a list of contents
c. Systems Block diagram(s), 11”x17”
d. Systems Overview description(s)
e. Daily System Startup and Shutdown Procedures
f. System Adjustments
1) Audio
2) Video
g. Troubleshooting Guide
1) Video
2) Audio
3) Controls
h. Maintenance Procedures
1) Describe routine procedures required with time intervals.
This includes audiovisual programs, lighting equipment, computer interactive displays, mechanical interactive displays, and other electrical, electronic or mechanical equipment provided and/or installed by the contractor.
2) For each audiovisual display, provide a list of parts needed for routine maintenance with make, model, time frequency needed, quantity per year, and price as of what date.
3) Provide a written proposal at installation for an optional service contract for audiovisual equipment or audiovisual systems as specified in individual task orders. Include proposed pricing for service at scheduled intervals as well as for fixed labor rates for individual service calls. Provide the contractor’s contact information including name, address, telephone numbers, and names of the project manager, sales representative, and service manager.
Harpers Ferry Center
i. As-built wiring diagrams for each audiovisual system. Provide hard copies as well as the electronic files in PDF format.
j. A hard copy and electronic version of the final control program(s).
k. The manufacturer’s installation, maintenance, and user instruction manuals for all components of the system. When electronic versions are available, they shall be included.
l. Provide manufacturer's warranties for all off-the-shelf equipment purchased by the contractor. Include documentation for date of purchase of the equipment.
G. As-Built Drawings
The contractor shall prepare a completed set of as-built drawings containing all approved revisions and additions to the fabrication drawings and any subsequent changes to the original plan. The as-built drawings shall be submitted in the maintenance manuals in accordance with this Division. All original drawings produced under this contract will be the property of the government.
Harpers Ferry Center
Division 3. SAMPLES/MOCK-UPS/PROTOTYPES
3.1 Introduction
Provide samples for all materials, colors, and finishes specified for the exhibits.
Fabricate mock-ups and prototypes as specified in individual task orders.
3.2 Specifications
A. Catalog Cuts - Catalog cuts shall be provided for all specialized hardware and off-the-shelf items provided by the contractor, including:
1. Lighting fixtures and associated hardware;
2. Electronic and electrical equipment and hardware, including audiovisual equipment, computer systems, control systems, cables, pushbuttons, and ventilation fans;
3. Security hardware and locks;
4. Specialized cabinet hardware, including hinges, casters, drawer pulls, door handles, levelers, etc.; and
5. Specialized fasteners, including cable hanging systems, wall or floor anchors, and other fasteners specified for anchoring or supporting exhibit structures in place.
Catalog cuts shall be legible originals or copies. When more than one product is shown on a page, highlight, circle, or otherwise identify the specific product, including all appropriate specifications such as model or part number, color, size, etc.
B. Materials and Finishes Samples - All samples shall be identified with the brand name, number, color name and number, and the manufacturer's name, address, and telephone number. Sample sizes shall be a minimum of 12" x 12" or as specified in individual task orders.
1. Finish Samples -
a. Paint - Paint colors mixed to match the specified exhibit color, applied to substrate of same material to be used in the exhibit.
All samples shall be identified with exhibit color number.
b. Plastic laminate
Harpers Ferry Center
c. Wood - Solid wood or wood veneer finish in specified species of wood and thickness and with specified finish, such as stain, sealant, or oil finish.
d. Metal - Finish and metal specified, including but not limited to, paint, powder coating, patina, and anodized finish.
2. Glazing - Glass or acrylic glazing, in specified type and thickness.
3. Gasketing for Artifact Cases - One-foot long sample of each type of gasketing to be used.
4. Models - Including topographic models, natural history models/dioramas - as specified in individual task orders. Samples of models shall represent the actual materials, finishes, and colors from which the model will be made.
5. Custom Life-size Figures - Cast from live models (real people), samples shall include photographs of the people from whom the castings are to be made. Samples of finishes and colors for custom figures shall be provided in the same materials from which the custom figure surface will be fabricated.
C. Graphics - Graphic media, including but not limited to, samples of digital and photographic prints, mounting and overlaminating, screen printing, porcelain enamel, etched glass, vinyl cutouts, and fiberglass embedments. Graphic media samples shall represent typical images, colors, and typography specified in the exhibit.
1. Digital Output Graphic Proofs -
a. Paper Proofs
1) Provide full-size (100%) paper proofs for all graphic images and layouts in quantities as specified in individual task orders. Proofs shall be full-color and include final, high-resolution scanned images.
2) Proofs that have been reviewed by the COR and require changes shall be corrected and resubmitted as revised proofs.
Harpers Ferry Center
a) Each sheet shall be identified with the following minimum information:
• Project Name (SHEN-BYRD VC)
• Exhibit label number(s)
• Font(s)
• Type size(s)
• Date of submittal
b) For large murals, it is acceptable for the contractor to submit the proof in sections. For reference in assembling the sections, the contractor shall submit a reduced-scale print of the entire mural on one sheet, with the seams marked.
b. Production Samples
1) Provide full-size (100%), full-color graphic samples of images and layouts. The samples shall be produced using the final output media specified (i.e.: inkjet, Lambda, screen print), with final colors and resolution.
2) Production samples shall represent all combinations of colors, typography, and types of images as they will appear in the final panels.
3) Quantities of each sample shall be as specified in individual task orders. When no quantity is specified, one copy of each sample shall be submitted.
4) The individual task order may also specify particular areas of exhibit graphic panels, at full size, which the COR requires in addition to the production samples. Dimensions of these sections shall be a minimum of 12" by 12", or as specified in individual task orders.
2. Mounting and Overlaminating - Provide one 8" by 10" sample of a mounted and laminated print for each type of mounting substrate and overlaminate specified on the drawings or in individual task orders.
3. Screen Printing – Provide samples of all screen inks printed on the exact finished substrate specified on the drawings or in the individual task order. Samples of type shall use the smallest and lightest version of each typeface specified on the drawings, but no smaller than 24 point.
Samples will be reviewed by the COR for color accuracy, and to evaluate contrast and readability.
Harpers Ferry Center
4. Other Graphic Samples – Provide samples of porcelain enamel, etched glass, vinyl cutouts, fiberglass embedments, graphics on fabrics, dimensional letters, and all other graphic elements specified for the project.
D. Mock-ups - Mock-ups are full-scale representations of portions of an exhibit for the purpose of review and testing of exhibit elements that are undeveloped and need further evaluation. Mock-ups shall be fabricated as specified in individual task orders. Mock-ups are for review only, and shall not be incorporated into the final exhibit.
E. Prototypes - Prototypes are portions of an exhibit such as an artifact case or an interactive mechanism that has a particular need to be reviewed and tested prior to fabrication of more elements of the same design. Unless otherwise specified in individual task orders, prototypes shall be corrected, in accordance with the review and approval by the COR, and incorporated into the final exhibit along with the other elements of the same design.
Harpers Ferry Center
Division 4. EXHIBIT STRUCTURES
4.1 Introduction
Provide fabrication of all exhibit elements including cabinetry, panels, platforms, artifact cases, cabinets or kiosks containing computer equipment, vitrines, or other elements that constitute the basic structural elements of the exhibits.
4.2 Quality Assurance
Refer to the Architectural Woodwork's Institute (AWI) quality standards for cabinetry and laminate work. All manufacturer's printed recommendations for materials, coatings, and adhesives are a part of these specifications. Copies of the publication, AWI Quality Standards, are available from:
Architectural Woodwork Institute
46179 Westlake Drive, Suite 120 Potomac Falls, Virginia 20165 571-323-3636 www.awinet.org
All materials and fabrication methods for artifact cases, including all structures to be installed inside artifact cases, shall be in accordance with Attachment E, Summary of Exhibit Conservation Guidelines.
4.3 Product Handling
Store lumber and millwork in a dry location. Do not expose wood to extreme changes in temperature or humidity. Protect panels, cases, and other structures from damage during handling, production, storage, shipping, and installation.
4.4 Materials
A. Wood Products - As specified on the drawings and in accordance with the following.
1. Plywood - For exhibit finish substrate and structure use American
Plywood Association (APA) Grade B or better, birch veneer plywood, sanded and touch-sanded, 3/4" thick. In areas where moisture is a factor, use marine grade birch plywood. Bending plywood shall be used for curved surfaces.
2. Medium Density Fiberboard (MDF) - Artifact case structures and pedestals or platforms for use inside artifact cases shall be fabricated using Medite II, industrial grade medium density fiberboard (MDF) manufactured with a formaldehyde-free binder which meets the requirements of ANSI A208.2-2002.
Harpers Ferry Center
Medite II, as manufactured by:
Sierrapine, Ltd.
Lava Ridge Court, Suite 220 Roseville, California 95661 800-676-3339 www.sierrapine.com
3. Framing Lumber - Number 2 Grade Poplar, Douglas Fir, or Number 1 Grade Southern Pine.
B. Plastics - As specified on the drawings and in accordance with the following.
1. Artifact Vitrines - Plastic glazing for artifact cases or vitrines shall be clear, UV-filtering cast acrylic sheet, as specified below.
Plexiglas, UF-3, as manufactured by:
Altuglas International c/o Arkema, Inc.
2000 Market Street Philadelphia, Pennsylvania 19103 215-419-7000 http://www.altuglasint.com
Acrylite OP-2, as manufactured by:
Cyro Industries
100 Enterprise Drive P. O. Box 5055 Rockaway, New Jersey 07866 800-223-2976 www.cyro.com
2. Subsurface Laminated Graphics -
a. Exhibit graphics which are output as paper prints and exposed to higher than normal wear from visitor use shall be subsurface laminated to clear, non-glare cast acrylic or polycarbonate sheet, in accordance with Division 6, Graphics, 6.10, and then mounted to a rigid substrate.
Examples of exhibit graphics which are considered as receiving higher than normal wear include the following:
• Panels mounted with a mainly horizontal orientation;
Harpers Ferry Center
• Instructional label panels adjacent to push buttons, interactive devices, models, and maps.
• Cut-out graphics, as an alternative to the standard for fabrication of cut-out graphics as a phenolic resin graphic panel, in accordance with Division 6, Graphics, 6.10, E.
b. Non-glare cast acrylic sheet shall be as manufactured by Altuglas
International or Cyro Industries. Non-glare polycarbonate sheet, as manufactured by:
GE Plastics One Plastics Avenue Pittsfield, Massachusetts 01201 413-448-7110 www.geplastics.com
3. Moderately Expanded PVC Sheet - Moderately expanded PVC sheet shall not be used for fabrication of any elements which are to be installed in the interior of an artifact case, including panels, pedestals, or graphic substrates.
C. Metals - As specified on the drawings and in accordance with the following.
1. Steel - Steel for fabrication of exhibit structures shall be as recommended by the American Society for Testing and Materials (ASTM) for the application specified.
American Society For Testing and Materials 100 Barr Harbor Drive West Conshohocken, Pennsylvania 19428-2959 610-832-9585 www.astm.org
2. Aluminum - Flat plate shall be anodized. Extrusions for structural supports shall be 6060-T or 6063-T52 alloy and anodized or painted.
3. Miscellaneous - Railings and ornamental metalwork shall be in accordance with recommendations of the National Ornamental & Miscellaneous Metals Association (NOMMA).
National Ornamental & Miscellaneous Metals Association
1535 Pennsylvania Avenue McDonough, Georgia 30253 888-516-8585 www.nomma.org
Harpers Ferry Center
D. Glass - As specified on the drawings and in accordance with the following. All glass shall be either tempered or laminated safety glass.
1. Laminated Glass - Polyvinyl butyral (PVB) UV-filtering layer between two laminations. All glass to be used as glazing for artifact cases shall be clear, UV-filtering laminated glass.
2. Tempered Glass - Fully-tempered glass which breaks into small cubes if broken.
3. Anti-Reflective Glass - AMIRAN anti-reflective glass, in thickness as specified on the drawings. AMIRAN used for artifact case glazing shall be laminated. AMIRAN is manufactured by:
SCHOTT North American, Inc.
555 Taxter Road Elmsford, New York 10523 914-831-2200 www.us.schott.com
E. Gasketing - The contractor shall use only silicone gasketing as specified in
Attachment E, Summary of Exhibit Conservation Guidelines, Section 3, "Sealing of Exhibit Cases." Manufacturers of silicone gasket materials include the following:
Rogers Corporation BISCO™ Silicones One Technology Drive P.O. Box 188 Rogers, Connecticut 06263-0188 860-744-9605 www.rogers-corp.com/bmu/info.htm
Clean Seal, Inc.
21900 West Ireland Road South Bend, Indiana 46614 800-366-3682 www.cleanseal.com
Delta Designs, Ltd.
P.O. Box 1733 Topeka, Kansas 66601 785-234-2244 800-656-7426 www.deltadesignsltd.com
Netherland Rubber Company
Harpers Ferry Center
2931 Exon Avenue Cincinnati, Ohio 45241 800-733-6107 www.netherlandrubber.com
F. Adhesives and Sealants - As specified on the drawings or as recommended in the manufacturer's specifications for installation of materials. All adhesives and sealants to be used on the internal surfaces of artifact cases or for case furnishings such as platforms, pedestals, or panels shall be in accordance with Attachment E, Summary of Exhibit Conservation Guidelines, Section 3, "Sealing of Exhibit Cases."
1. High Pressure Laminate Adhesive -
a. Laminate-to-Substrate - Use a nonpigmented contact cement or the manufacturer's recommended adhesive.
b. Laminate-to-Laminate - Use a nonpigmented two-part epoxy or the manufacturer's recommended adhesive.
2. Glass - Silicone SCS1201 clear, white or black, as manufactured by:
General Electric Company GE Silicones 260 Hudson River Road Waterford, New York 12188 518-237-3330 800-332-3390 www.gesilicones.com
3. Artifact Case Wood Sealant - Seal all exposed wood inside artifact cases which shares the same air space with the artifacts and desiccant chamber so that artifacts will not be harmed by volatile chemicals outgassing into the air inside the case. Exposed wood inside case furnishings such as platforms, pedestals, or panels shall also be sealed.
Surfaces already finished with high-pressure laminate do not need additional sealant. Sealants shall be in accordance with Attachment E, Summary of Exhibit Conservation Guidelines, Section 5, "Exhibit Case Construction Materials." Follow manufacturer's specifications for application of the finish.
Harpers Ferry Center
Camger 1-175 Series Poly Preserve Aliphatic Urethane Barrier, as manufactured by:
Camger Chemical Systems, Inc.
364 Main Street Norfolk, Massachusetts 02056 508-528-5787 www.camger.com
4. Artifact Case Crack and Gap Sealant - To ensure a tight seal, fill all seams which could allow air exchange with outside air using silicone, acrylic latex, or acrylic latex silicone caulk which is neutral curing, does not emit acetic acid during curing, and has low volatile organic compounds (VOC’s). Examples of some acceptable neutral curing caulks, and caulks with low VOC's, include the following:
a. Dow Corning neutral-curing silicone glass sealant, as
The Dow Chemical Company 2030 Dow Center Midland, Michigan 48674 989-636-1000 www.dowcorning.com
b. OSI Pro-Series VP-275™ multi-purpose silicone sealant, neutral-curing, as manufactured by:
Henkel Consumer Adhesives 7405 Production Drive Mentor, Ohio 44060 800-321-0253 www.osiproseries.com
c. Liquid nails super caulk, indoor-outdoor acrylic latex caulk, as manufactured by:
MACCO
15885 West Sprague Road Strongsville, Ohio 44136 800-545-2643 www.liquidnails.com
Harpers Ferry Center
d. DAP® ALEX PLUS® acrylic latex caulk plus silicone, as
DAP Inc.
2400 Boston Street Suite 200 Baltimore, Maryland 21224-4723 888-327-8477 www.dap.com
e. Red Devil 25-Year acrylic latex interior wall and wood caulk, and
Red Devil LIFETIME® siliconized acrylic adhesive sealant, as
Red Devil, Incorporated 4175 Webb Street Pryor, Oklahoma 74361 918-825-5744 www.reddevil.com
5. General Purpose Caulk - Clear silicone rubber, standard grade RTV
Silicone Number 108, as manufactured by the General Electric Company, as specified in this Division, 4.4, F., 2.
6. Acrylic Cement - Weld-On 40 adhesive, as manufactured by:
IPS Corporation 455 West Victoria Street Compton, California 90220 310-898-3300 800-421-2677 www.ipscorp.com
7. Graphic Mounting Adhesives - In accordance with Division 6, Graphics, 6.10.
8. Artifact Case Curing Time - All artifact case adhesives, sealants, and finishes shall be allowed to cure while exposed to the fabrication shop environment for a minimum of two weeks prior to enclosing the case structure and installing the artifacts. The contractor shall be responsible for consulting the manufacturers' technical data to verify exact conditions of time, temperature, and humidity for the adhesives, sealants, and finishes to fully cure.
G. Finishes - As specified on the drawings and in accordance with the following.
Finishes inside artifact cases shall be in accordance with Attachment E, Summary of Exhibit Conservation Guidelines, Section 5, "Exhibit Case Construction Materials."
Harpers Ferry Center
1. Plastic Laminates - High pressure decorative laminates shall meet the minimum performance standards of the International Organization of Standardization (ISO) ISO-4586-2:2004 and the National Electrical Manufacturer's Association, LD3-2005. Laminate shall be Grade 10, general purpose grade, with the exception of curved, vertical surfaces, then Grade 20, vertical postforming grade is acceptable.
2. Paint
a. Artifact Case Interiors - Use paints with a low Volatile Organic Compound (VOC) rating for surfaces inside the artifact chamber, in accordance with Attachment E, Summary of Exhibit Conservation Guidelines, Section 5, "Exhibit Case Construction Materials."
b. Aluminum and Steel - Use Polane T polyurethane enamel and primer, as manufactured by:
The Sherwin-Williams Company 101 Prospect Avenue, Northwest Cleveland, Ohio 44115-1075 800-474-3794 www.sherwin.com
3. Powder Coating - As manufactured by:
TIGER Drylac U.S.A., Inc.
Headquarters 1261 East Belmont Street Ontario, California 91761 909-930-9100 www.tigerdrylac.com
4. Fabric - Fabric for use inside artifact cases shall be in accordance with the drawings and Attachment E, Summary of Exhibit Conservation Guidelines, Section 5, "Exhibit Case Construction Materials."
H. Hardware
1. Rough - Nails, screws, bolts, nuts, washers, anchors, threaded inserts, flush clips, and similar items of proper size and number to secure materials in place. Any fasteners used in areas where moisture is a factor shall be galvanized or aluminum.
Harpers Ferry Center
2. Finish - Hinges, key-hole fasteners, concealed hinges, cam locks, slides, push locks and keys, casters, levelers, handles, and knobs as specified on approved drawings and catalog cuts. All doors in exhibit structures which provide access to interior storage cabinetry and audiovisual equipment shall be fastened with concealed hinges and provided with locks. Locks that are installed as multiples shall be keyed alike.
4.5 Execution
A. Woodworking - General
1. Quality Standards - AWI Quality Standards are by reference made part of this Specification. Unless otherwise clearly detailed or specified in individual task orders, all cabinetry shall be fabricated to conform to AWI Quality Standards, Section 400, for custom grade material and workmanship.
2. Cabinetry - All casework shall be plant assembled. Cases too large for access into the exhibit area shall be made in detachable sections with provisions for assembly inside the exhibit space.
a. Fabrication Methods - All faceplates, panel ends, and doors shall be of mortise and tenon or doweled fabrication, glued under pressure, with nails only furnishing the pressure. All nails shall be properly set for filling. Filled areas shall be sanded smooth to receive laminate, paint, or other specified finish. Edges of panels and signs shall be filled, sanded smooth, and finished or covered with material matching the panel face. Edges shall not be left unfinished unless otherwise specified on the drawings.
b. Shelving - Unless otherwise specified in individual task orders, any shelving used as part of the interior of cabinets shall be 3/4" Birch plywood. At a minimum, audiovisual equipment shelving shall have 12" square center portions of perforated metal to allow ventilation around equipment. The contractor shall be responsible for ensuring that each shelf is fabricated of material of sufficient strength for the piece of equipment for which it is intended.
3. Architectural Millwork - Fabricate and assemble units complete in the shop, insofar as their dimensions will permit for transportation and proper handling. All woodwork shall be shop finished and delivered to the installation site with protective covering. Use solid stock for frames, jambs, heads, stops, and edges. Where veneer plywood is used, trim exposed edges with hardwood without face nailings. Accurately fit and align separate parts.
Harpers Ferry Center
Provide ample screw, glue-and-bolt blocks, draw-bolts, tongues, grooves, splines, dowels, tenons, mortises, and other means of fastening to render the work substantial, rigid, and permanently secured in the proper position. Provide material to permit scribing to walls, floors, and related work. Provide sufficient allowance for shrinkage occurring after installation. Provide mitered corners at doorframes with hairline joints. Fit and adjust doors to achieve smooth and noiseless operation. Exposed fasteners are unacceptable without prior approval from the COR.
Countersink face nails and face screws, fill with plastic wood or wood plugs, sand flush to surface, and finish without visible markings.
B. Artifact Case Fabrication - All materials and fabrication methods for artifact cases, including all structures to be installed inside artifact cases, shall be in accordance with Attachment E, Summary of Exhibit Conservation Guidelines.
1. Sealed Case Environment - To ensure that artifact case vitrines are as airtight as possible, seal all seams which could allow air exchange with the air outside the artifact and silica gel chambers. Fabrication shall be in accordance with Attachment E, Summary of Exhibit Conservation Guidelines, "Case Details and Illustrations, Section 6, Case Air Seal."
2. Silica Gel Chambers - Chambers that house silica gel shall be fabricated to maximize exchange of air with the chamber containing the artifacts and minimize exchange of air outside of the case. The chamber shall provide a sealed, stable environment necessary to protect the artifact(s) in the case. Fabrication shall be in accordance with Attachment E, Summary of Exhibit Conservation Guidelines, "Case Details and Illustrations, Section 5, Environmental Control."
C. Finishes
1. Substrates - Surfaces scheduled to receive etching, sandblasting, paint, laminate, photo mounts, and graphic prints, shall be made true and even with joints and nail holes filled, and shall be primed, sealed, and properly supported to prevent warping or bending.
2. Paint - All exposed surfaces to receive paint shall be finished smooth.
Finished paint surface shall be without runs, sags, and other imperfections. Match colors specified on the drawings. Colors shall be consistent from surface-to-surface. Paint shall be applied under dry, dust-free conditions, in accordance with the manufacturer's specifications.
Edges, crevices, corners, and joints shall be thoroughly cleaned. Painting shall be of uniform thickness. All exposed edges of painted panels shall be filled, sanded, and painted to match the panel face unless otherwise specified on the drawings.
Harpers Ferry Center
3. Plastic Laminate - All laminate and substrate shall be stored together for at least 72 hours and assembled in an environment of approximately 70 degrees Fahrenheit and 50 percent relative humidity. Face of the substrates shall be sanded smooth and free of grease, wax, dust, or other contaminates which interfere with adhesion. Control of the glue line and its thickness and uniformity of spread shall be given constant attention.
Spot bonding shall never be used. Cover all areas where contact is made with adhesive. IN ALL CASES, THE ADHESIVE MANUFACTURER'S INSTRUCTIONS FOR USE SHALL BE FOLLOWED. Avoid chipping of laminate by the saw blade. Finish smooth edges on curved cut by sawing the part oversize and finish it by routing, filing, or sanding. When cutting laminate, make certain to prevent hairline cracks or over-cutting at inside corners. Inside corners shall be rounded to prevent corner cracking.
4. Veneer - All veneer shall be ordered in a minimum 3:1 ratio per square foot of plywood substrate required. Face veneer shall be flat sliced with adjacent pieces randomly matched. The maximum width of sapwood per flitch shall not exceed two-inches. Panel face assembly shall be running matched. Veneer millwork shall not be sequence matched. All edges shall be veneer banded on all four edges for final use in the exhibit.
5. Panel Edges and Backs, Concealed Areas - Finish in accordance with the following unless specified otherwise on the drawings.
a. Concealed Areas - Those areas completely enclosed by solid opaque framing and skin. No finish required.
b. Semi-Exposed Areas - Those areas only visible by opening doors or access panels. Finish with wood sealer.
c. Flat Panels, Framed - The back side of plywood or other framed material. A minimum of two coats flat lacquer primer for the surface.
d. Flat Panels, Unframed - The back side of plywood or other material without framing such as cabinet doors and applied panels. A minimum of three coats of paint, laminate backing sheet, or other finish equal in density and weight to that specified on the drawings for the exposed surface.
e. Edges - All exposed edges of panels, plaques, and graphic prints shall be fitted and sanded smooth. Edges shall be finished to match adjoining surfaces as specified on the drawings.
f. Panel Backs - Backs of panels shall be finished with spray-applied lacquer finish or laminate backing sheet in color specified on the drawings.
Harpers Ferry Center
6. Artifact Case Interiors - All surfaces inside artifact cases which share air exchange with the artifact and silica gel chambers shall be finished in accordance with Attachment E, Summary of Exhibit Conservation Guidelines, "Technical Notes, Section 5, Exhibit Case Construction Materials."
D. Plastic - Follow manufacturer's printed instructions.