Amendment 2 - Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NZP Bridge Repairs Amend_3.pdf | ||
| NZPBridge Repair Amend 1.pdf | ||
| F09SOL00031-NZP Bridge RepairPKG.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
F09SOL00031
x x
3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
OCON
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
SMITHSONIAN INSTITUTION
093310806/29/2009000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/29/2009
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This is amendment # 2 to the Smithsonian Institution solicitation reference in Block 9 a of the SF Form 30, Amendment/Modification. The solicitation is amended as follows:
1. Addendum # 1- Provides drawings and specifications for alternate pricing of concrete paving in lieu of asphalt paving. Reference SI Addendum No. 3 dated August 7, 2009.
2. This portion of the amendment addresses some last minute questions and answers regarding the solicitation from perspective bidders:
a. It is mentioned in the Drawings that On Bridge "3" that one lane should remain opened all the time. Kindly let me know if the opened lane will be used one way or both ways for
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Robert Fraga
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 20
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
F09SOL00031/000002
incoming/outgoing traffic? The Contractor shall maintain two way traffic on the one open lane.
b. Can Detour routes be suggested in the Traffic Control Plan? No detours
c. Can both lanes at bridge "2" be shutdown at same time? Per note on S106, bridge #02 shall be shut down for 5 weeks. Maintain pedestrian and one lane vehicular traffic during soffit repairs.
d. Can both lanes at bridge "1" be shutdown at same time? Per note on S101 bridge #01 shall be shut down for 8 weeks
e. Traffic Control Plan should be in regulation to DDOT or Smithsonian? Provide traffic control per note 30 on C100
f. Proposal needs Site Coordination Plan? Can you give us some idea who are we dealing with in
Smithsonian? Does it deal with Permits, Utilities etc? All coordination for permits and shutdowns will be coordinated through the Smithsonian
Institution except for the soil and erosion control permit which shall be obtained by the
Contractor through DCRA
3. Davis Bacon Wage DC20080004, Mod 5 for
Construction and DC20080001, Mod 25 both dated
July 31, 2009 are applicable.
4. Date and time to submit proposals remain unchanged.
Period of Performance: 08/31/2009 to 03/02/2010
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Smithsonian Institution Addendum Office of Engineering Design & Construction
Project No: 0933108
Project Title: Repair Bridges (Road/Walkway Improvements)
Facility: Smithsonian National Zoological Park
Addendum No. 3
The following addendum involves responses to questions received from prospective offerors:
Q1 – “I went to the National Zoo yesterday to access the bridge repair work and would like to know that we will be able to use shortcrete concrete to repair under side of the bridge (soffit) area. I used to work at VDOT for over 18 years. When I was with VDOT I did some bridge repairs work near Pentagon and George Washington Parkway bridges. It that time VDOT used shortcrete concrete to repair Soffit Area. Hand repair under Soffit area could not achieve quality of work. Please consider "Shortcrete Concrete Placement" for National Zoo Bridges. You can have a better quality products which will last longer than specified patching work.” (sic)
A1 – Prospective offerors are directed to price plans and specifications as shown. "Shotcrete Concrete Placement" will not be considered as a substitution for the specified bridge repair material. Prospective offerors are referred to substitution request procedures per the specifications that are available to the successful offeror once the contract has been awarded.
All other terms and conditions to remain the same.
You are to acknowledge receipt of this addendum in your proposal.
(END OF ADDENDUM NO. THREE)
August 7, 2009
600 Maryland Avenue, S.W. USPS Mail: OEDC Capital Gallery Suite 5001 MRC 511 Washington, D.C. 20024 P.O. Box 37012 Voice: 202.633.6230 Fax: 202.633.6233 Washington, D.C. 20013-7012 http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=Davis-Bacon&docid=DC20080004[8/12/2009 3:16:00 PM]
GENERAL DECISION: DC20080004 07/31/2009 DC4
Date: July 31, 2009 General Decision Number: DC20080004 07/31/2009
State: District of Columbia
Construction Type: Building
County: District of Columbia Statewide.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 06/12/2009 1 06/19/2009 2 06/26/2009 3 07/03/2009 4 07/10/2009 5 07/31/2009
ASBE0024-007 10/01/2008
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 29.18 14.18
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
ASBE0024-008 10/01/2008
Rates Fringes
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER (REMOVAL
FROM MECHANICAL SYSTEMS,
WHICH WILL NOT BE REPLACED OR
SCRAPPED)........................$ 17.85 6.60
BRDC0001-002 05/04/2009
Rates Fringes
BRICKLAYER.......................$ 26.31 7.11
CARP0132-008 05/01/2009
Rates Fringes
CARPENTER, Including Drywall Hanging, Formsetting and Carpet/Soft Floor Laying.........$ 26.38 7.00
PILEDRIVERMAN....................$ 24.48 7.70
CARP1831-002 04/01/2009
Rates Fringes
MILLWRIGHT.......................$ 29.39 6.55
ELEC0026-016 11/03/2008
Rates Fringes
ELECTRICIAN, Including HVAC Temperature Control Installation.....................$ 36.65 11.45+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Jr.'s Birthday, Inauguration Day, Memorial Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, the day after Thanksgiving and Christmas Day or days designated as legal holidays by the Federal Government.
ELEC0026-017 09/01/2008
http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=Davis-Bacon&docid=DC20080004[8/12/2009 3:16:00 PM]
Rates Fringes
ELECTRICIAN: COMMUNICATION
TECHNICIAN.......................$ 24.25 3%+6.87
SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).
WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.
ELEV0010-001 01/01/2009
Rates Fringes
ELEVATOR MECHANIC................$ 36.07 18.285+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
IRON0005-005 06/01/2009
Rates Fringes
IRONWORKER, ORNAMENTAL AND
STRUCTURAL.......................$ 28.83 13.295
IRON0201-006 05/01/2009
Rates Fringes
IRONWORKER, REINFORCING..........$ 25.20 14.33
LABO0657-015 06/01/2009
Rates Fringes
LABORER: Skilled................$ 20.22 5.25
FOOTNOTE: Potmen, power tool operator, small machine operator, signalmen, laser beam operator, waterproofer, open caisson, test pit, underpinnig, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any machine that does the same general type of work, carpenter tenders, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline, builders of trestle scaffolds over one tier high and sand blasters, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper, structural demolition.
MARB0002-004 05/01/2009
http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=Davis-Bacon&docid=DC20080004[8/12/2009 3:16:00 PM]
MARBLE/STONE MASON...............$ 32.63 12.99
INCLUDES pointing, caulking and cleaning of All types of masonry, brick, stone and cement structures
MARB0003-006 05/01/2008
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 25.76 8.82
MARB0003-007 05/01/2008
Rates Fringes
TERRAZZO FINISHER................$ 20.15 7.97
MARB0003-008 05/01/2008
Rates Fringes
TILE SETTER......................$ 25.01 8.82
MARB0003-009 05/01/2008
Rates Fringes
TILE FINISHER....................$ 20.15 7.97
PAIN0051-014 06/01/2008
Rates Fringes
GLAZIER
Contracts $2 million and under.......................$ 25.12 7.46 Contracts over $2 million...$ 27.84 7.46
PAIN0051-015 06/01/2009
Rates Fringes
PAINTER
Brush, Roller, Spray and Drywall Finisher............$ 24.64 7.86
PLAS0891-005 07/01/2009
Rates Fringes
PLASTERER........................$ 27.00 5.82
PLAS0891-006 05/01/2008
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.15 6.47
PLAS0891-007 07/01/2008
Rates Fringes
FIREPROOFER
Handler.....................$ 11.50 3.93 Mixer/Pump..................$ 14.00 3.93 Sprayer.....................$ 19.00 3.93
Spraying of all Fireproofing materials. Hand application of Fireproofing materials. This includes wet or dry, hard or soft. Intumescent fireproofing and refraction work, including, but not limited to, all steel beams, columns, metal decks, vessels, floors, roofs, where ever fireproofing is required. Plus any installation of thermal and acoustical insulation. All that encompasses setting up for Fireproofing, and taken down. Removal of fireproofing materials and protection. Mixing of all materials either by hand or machine following manufactures standards.
PLUM0005-008 08/01/2008
http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=Davis-Bacon&docid=DC20080004[8/12/2009 3:16:00 PM]
PLUMBER
Apartment Buildings over 4 stories (except hotels).....$ 22.31 8.61+a ALL Other Work..............$ 36.24 13.37+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.
PLUM0602-008 08/01/2008
Rates Fringes
PIPEFITTER, Including HVAC Pipe Installation................$ 35.12 14.47+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.
ROOF0030-016 05/01/2009
Rates Fringes
ROOFER...........................$ 25.80 8.26
SFDC0669-002 04/01/2009
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 30.45 15.30
* SHEE0100-015 07/01/2009
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 33.19 12.76
SUDC2009-003 05/19/2009
Rates Fringes
LABORER: Common or General......$ 13.06 2.80
LABORER: Mason Tender - Cement/Concrete..................$ 15.40 2.85
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=Davis-Bacon&docid=DC20080004[8/12/2009 3:16:00 PM] be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
GENERAL DECISION: DC20080001 07/31/2009 DC1
Date: July 31, 2009
General Decision Number: DC20080001 07/31/2009
Superseded General Decision Number: DC20070001
State: District of Columbia
Construction Types: Heavy (Heavy and Sewer and Water Line) and Highway
County: District of Columbia Statewide.
HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines);
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 02/08/2008
1 04/18/2008
2 05/02/2008
3 05/09/2008
4 05/30/2008
5 06/06/2008
6 07/04/2008
7 07/18/2008
8 07/25/2008
9 08/15/2008
10 09/05/2008
11 09/12/2008
12 09/19/2008
13 11/07/2008
14 12/19/2008
15 02/20/2009
16 03/20/2009
17 05/01/2009
18 05/29/2009
19 06/05/2009
20 06/12/2009
21 06/19/2009
22 06/26/2009
23 07/03/2009
24 07/10/2009
25 07/31/2009
ASBE0024-001 10/01/2008
Asbestos Worker/Heat and
Frost Insulator
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems..........$ 29.18 14.18
ASBE0024-002 10/01/2008
HAZARDOUS MATERIAL HANDLER
Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 17.85 6.60
ASBE0024-005 10/01/2008
Fire Stop Technician.............$ 22.85 6.59
Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.
BOIL0193-001 10/01/2008
Boilermakers:....................$ 36.61 15.46
BRDC0001-001 05/04/2009
Bricklayer......................$ 26.31 7.11
CARP0132-001 05/01/2009
Carpenter/Lather.................$ 26.38 7.00
Piledriver.......................$ 24.48 7.70
CARP1831-001 04/01/2009
Carpenters:
Millwrights.................$ 29.39 6.55
CARP2311-002 05/01/2009
DIVER TENDER.....................$ 24.48 7.80
DIVER............................$ 36.13 7.80
ELEC0026-001 11/03/2008
Electricians.....................$ 36.65 11.45+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Jr.'s
Birthday, Inauguration Day, Memorial Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, the day after
Thanksgiving and Christmas Day or days designated as legal holidays by the Federal Government.
ELEC0026-008 07/01/2003
Motor Repairmen
Removal and reinstallation of electrical motors........$ 23.69 7.73+3%+a
a. PAID HOLIDAYS:
New Year's Day, Martin Luther King Jr.'s Birthday, Inauguration Day, Memorial Day, Fourth of July,Labor Day, Veterans Day,Thanksgiving Day, the day after Thanksgiving and Christmas Day or days designated as legal holidays by the Federal Government.
ELEC0070-001 09/02/2007
Line Construction:
Cable Splicers..............$ 30.29 19.75%+4.81
Equipment Mechanic..........$ 21.82 19.75%+4.81
Equipment Operators.........$ 25.78 19.75%+4.81
Groundman/Truck Driver......$ 15.34 19.75%+4.81
Line Truck with Auger.......$ 20.09 19.75%+4.81
Linemen.....................$ 28.86 19.75%+4.81
ENGI0077-001 05/01/2009
Power equipment operators:
(HEAVY AND HIGHWAY
CONSTRUCTION)
GROUP 1.....................$ 30.89 7.52+a+b
GROUP 2.....................$ 29.89 7.52+a+b
GROUP 3.....................$ 29.43 7.52+a
GROUP 4.....................$ 28.72 7.52+a
GROUP 5.....................$ 26.69 7.52+a
GROUP 6.....................$ 22.15 7.52+a
GROUP 7.....................$ 31.26 7.52+a
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Tower Cranes and Cranes 100 ton and over.
GROUP 2: 35 ton cranes & above, tower & climbing cranes, derricks, concrete boom pump, drill rigs (equivalent to L &
Double L), mole.
GROUP 3: Backhoes, cableways, cranes, cherry pickers, elevating graders, hoists, paving mixers, power shovels,tunnel shovels. batch plants, shields, tunnel mining machines, gradalls, front end loaders, 3 1/2 cu.
yds. and above, power driven wheel scoops and scrapers (50
cu. yds. struck capacity or above), rail tamper, draglines, boomcat, mucking machines, graders in tunnels, pile driving engines.
GROUP 4: Front end loaders below 3 1/2 cu. yds, boom trucks, hydraulic backhoes 1/2 yds. capacity or below rubber or track mounted, tug boats, power driven wheel scoops & scrapers, blade graders, motor graders, bulldozers, trenching machines, concrete mixer, speed swing pettibone, ballast regulator, concrete pump, mechanic, welder, mechanic welder, shotcrete machines, Hoeram, locomotive
(standard, narrow gauge), tuggers.
GROUP 5: High lifts above 10 feet, boilers (skelton), asphalt spreaders, bullfloat finishing machines, concrete finishing machines, concrete spreaders, fine graders, air compressors, welding machines, pumps, generators, well points, deep wells, hydraulic pumps, elevators, freeze uniits, tunnel motorman or dinky operator, roller, conveyors, well drilling machines, grout pump, fireman.
GROUP 6: Fork lifts, ditch witch, bobcat 1/3 cu. yd. and below, space heaters, sweepers, assistant engineers, oilers.
GROUP 7: Master mechanic.
a. PAID HOLIDAYS: New Years Day, Inaugural Day, Decoration
Day, Independence Day, Labor Day, Martin Luther King's
Birthday, Veterans' Day, Thanksgiving Day, Friday after
Thanksgiving and Christmas Day.
b. PREMIUM PAY:
Tower crane and cranes 100-ton and over to receive $1.00 per hour premium over Group One.
ENGI0077-002 06/01/2009
(PAVING AND INCIDENTAL
GRADING)
GROUP 1.....................$ 24.53 6.00
GROUP 2.....................$ 21.60 6.00
GROUP 3.....................$ 18.54 6.00
GROUP 4.....................$ 16.85 6.00
GROUP 5.....................$ 25.05 5.80
GROUP 1: Gradall operator, Crane.
GROUP 2: Boom Truck, Milling Machine, Excavator, Rubber Tire
Backhoe, Asphalt Paver, Asphalt Plant Engineer, Motor
Grader, Track Loader, Rubber Tire Loader, Track Dozer, Concrete Paver.
GROUP 3: Broom Truck, Asphalt Roller.
GROUP 4: Air Compressor, Grade Rollers.
GROUP 5: Mechanic.
ENGI0077-003 07/01/2009
(SEWER, GAS AND WATER LINE
CONSTRUCTION)
GROUP 1.....................$ 22.48 6.12+a
GROUP 2.....................$ 22.08 6.12+a
GROUP 3.....................$ 21.57 6.12+a
GROUP 4.....................$ 21.25 6.12+a
GROUP 5.....................$ 20.43 6.12+a
GROUP 1: Excavators, Cranes, Gradalls.
GROUP 2: Backhoes, Front-end Loaders, Fork alift/Lull, Bulldozers, Motor Graders. Qualified Mechanics, Hydraulic
Tamper and Hoe Pack, Paving Mixers, Pile Driving Engines, Batch Plant, Concrete Pumps, Low-Boy Driver, Lube Truck.
GROUP 3: Trenching Machine, Well Drilling Machines, Concrete
Mixers, Motor Graders, Truck Driver.
GROUP 4. Roller, Air Compressors, Pumps, Welding Machines, Well Points, Firemen.
GROUP 5: Oiler a.PAID HOLIDAYS: New Year's Day, Inaugural Day, Washington's
Birthday, Decoration Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Christmas Day and Martin
Luther King's Birthday.
IRON0005-001 06/01/2009
Ironworkers:
Structural, Ornamental and
Chain Link Fence............$ 28.83 13.295
IRON0201-001 05/01/2009
Ironworkers:
Reinforcing.................$ 25.20 14.33
LABO0657-003 06/01/2009
Laborers: (HEAVY AND HIGHWAY
AND SEWER & WATER LINES
CONSTRUCTION)
GROUP 1.....................$ 21.11 5.25
GROUP 2.....................$ 21.43 5.25
GROUP 3.....................$ 21.60 5.25
GROUP 4.....................$ 21.77 5.25
GROUP 5.....................$ 22.22 5.25
GROUP 6.....................$ 22.78 5.25
GROUP 7.....................$ 23.33 5.25
GROUP 8.....................$ 24.06 5.25
LABORERS CLASSIFICATIONS:
GROUP 1: Carloaders, choker setter, concrete crewman, crushed feeder, demolition laborers, including salvaging all material, loading, cleaning up, wrecking, dumpmen, flagmen, fence erector and installer (other than chain link), including installation and erection of fence, guard rails, medial rails, reference posts, guide posts and right-of-way markers, form strippers, general laborers, railroad track laborers, riprap man, scale man, stake jumper, structure mover, includes foundation, separation, preparation, cribbing, shoring, jacking and unloading of structures, water nozzleman, timber bucker and faller, truck loader, water boys, tool room men.
GROUP 2: Combined air and water nozzleman, cement handler, dope pot fireman (nonmechanical), form cleaning machine, mechanical railroad equipment (includes spiker, puller, tile cleaner, tamper, pipe wrapper, power driven wheelbarrows, operators of hand derricks, towmasters, scootcretes, buggymobiles and similar equipment), tamper or rammer operator, trestle scaffold builders over one tier high, power tool operator (gas, electric or pneumatic), sandblast or gunnite tailhose man, scaffold erector, (steel or wood), vibrator operator (up to 4 feet), asphalt cutter, mortar men, shorer and lagger, creosote material handler, corrosive enamel or equl, paver breaker and jackhammer operators.
GROUP 3: Multi-section pipe layer, non-metallic clay and concrete pipe layer (including caulker, collarman, jointer, rigger and jacker, thermal welder and corrugated metal culvert pipe layer.
GROUP 4: Asphalt block pneumatic cutter, asphalt roller, walker, chainsaw operator with attachment, concrete saw
(walking), high scalers, jackhammer operator (using over 6 feet of steel), vibrator operator (4 feet and over), well point installer, air trac operator.
GROUP 5: Asphalt screeder, big drills, cut of the hole drills
(1 1/2 " piston or larger), down the hole drills (3 1/2" piston or larger) gunnite or sandblaster nozzleman, asphalt raker, asphalt tamper, form setter, demolition torch operator, shotcrete nozzlemen and potman.
GROUP 6: Powderman, master form setters.
GROUP 7: Brick paver (asphalt block paver, asphalt block sawman, asphalt block grinder, hastings block or similar type)
GROUP 8: Licensed powdermen.
LABO0657-004 06/01/2009
Laborers: (HAZARDOUS WASTE
REMOVAL, EXCEPT ON MECHANICAL
SYSTEMS:
Preparation for, removing and encapsulation of hazardous materials from non-mechanical systems)
Skilled Asbestos Abatement
Laborers....................$ 17.45 5.25
Skilled Toxic and
Hazardous Waste Removal
Laborers....................$ 20.46 5.25
LABO0657-005 06/01/2009
Laborers: (TUNNEL, RAISE &
SHAFT (FREE AIR)
FOR HEAVY AND SEWER & WATER
LINES CONSTRUCTION)
GROUP 1.....................$ 21.84 5.25
GROUP 2.....................$ 22.50 5.25
GROUP 3.....................$ 24.18 5.25
GROUP 4.....................$ 24.89 5.25
LABORERS CLASSIFICATIONS:
GROUP 1: Brakeman, Bull Gang, Dumper, Trackmen, Concrete Man.
GROUP 2: Chuck Tender, Powdermen in Prime House, Form Setters and Movers, Nippers, Cableman, Houseman, Groutman, Bell or
Signalman, Top or Bottom Vibrator Operator.
GROUP 3: Miners, Re-Bar Underground, Concrete or Gunnite
Nozzlemen, Powdermen, Timbermen and Re-Timbermen, Wood Steel
Including Liner plate or Other Support, Material Motorman, Caulkers, Diamond Drill Operators, Riggers, Cement Finishers-
Underground, Welders and Burners, Shield Driver, Air Trac
Operator, Shotcrete Nozzlemen and Potman.
GROUP 4: Mucking Machine Operator (Air).
LABO0657-006 06/01/2009
Laborers: (TUNNEL, RAISE AND
SHAFT (COMPRESSED AIR) FOR
HEAVY CONSTRUCTION ONLY
Gauge Pressure Work Period
(Pounds) (Hours)
1-14 7...........$ 27.66 5.25
14-18 6............$ 32.55 5.25
FOOTNOTE: On any requirement for air pressure in excess of 18
PSI, work periods and rates should be negotiated at a pre-bid conference.
LABO0657-007 06/01/2007
Laborers: (PAVING AND
INCIDENTAL GRADING)
Asphalt Raker & Concrete
Saw Operator................$ 17.14 4.30
Asphalt Shoveler............$ 16.59 4.30
Asphalt Tammer & Concrete
Shoveler....................$ 16.84 4.30
Jack Hammer.................$ 17.03 4.30
Laborer.....................$ 16.48 4.30
Sand Setter & Form Setter...$ 17.76 4.30
LABO0657-008 06/01/2009
LABORERS (BRICK MASONRY WORK)
Mason Tenders...............$ 15.06 5.25
Scaffold Builders, Mortarmen...................$ 15.90 5.25
MARB0002-003 05/01/2009
Marble & Stone Mason
Includes Pointing, Caulking and Cleaning of
All Types of Masonry, Brick, Stone and Cement
Structures..................$ 32.63 12.99
MARB0003-001 05/01/2008
Mosaic & Terrazzo Worker, Tile Layer
Marble Mason and Tile Layer.$ 25.01 8.82
Terrazzo Worker.............$ 25.76 8.82
MARB0003-004 05/01/2008
Marble, Tile & Terrazzo
Finisher.........................$ 20.15 7.97
PAIN0051-001 06/01/2009
Painters:
All Industrial Work.........$ 26.68 7.86
Bridges, Heavy Highway, Lead Abatement and
Flame/Thermal Spray.........$ 30.32 7.86
Commercial and Mold
Remediation, Painters, Wallcovers and Drywall
Finishers...................$ 24.64 7.86
Metal Polishing and
Refinishing.................$ 25.64 7.86
PLAS0891-001 05/01/2008
Cement Masons:
HEAVY CONSTRUCTION ONLY.....$ 27.15 6.47
PLAS0891-002 06/01/2007
Cement Masons: (PAVING &
Cement Masons...............$ 17.35 4.35
Concrete Saw Operators......$ 17.35 4.35
Form Setters................$ 17.35 4.35
PLUM0005-001 08/01/2008
Plumbers.........................$ 36.24 13.37+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving
Day and the day after Thanksgiving, Christmas Day, New
Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.
PLUM0602-005 08/01/2008
Steamfitter, Refrigeration &
Air Conditioning Mechanic........$ 35.12 14.47+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and the day after
Thanksgiving and Christmas Day.
* SHEE0100-001 07/01/2009
Sheet Metal Worker...............$ 33.19 12.76
TEAM0639-001 06/01/2009
Truck drivers: (HEAVY &
HIGHWAY CONSTRUCTION)
Tractor trailer, Low Boy....$ 20.00 2.10+a
Truck Drivers...............$ 18.00 2.00+a
a. VACATION: Employees will receive one (1) week's paid vacation after one (1) year of service.
TEAM0639-005 09/01/2006
Truck drivers: (PAVING &
All paving projects where the grading is incidental to the paving...............$ 14.05 3.69
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
| NZP Bridge Repair Amend # 2.pdf |
| DBDC20080004.pdf |
| gpo.gov |
| http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=Davis-Bacon&docid=DC20080004 |
File details come from the government source that posted it. Updated .