Recovery F09SOL00028 NZP, Amend. #2.pdf
PDF 5 MB Posted
- Solicitation number
- F09SOL00028
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Recovery F09SOL00028 NZP, Amend. #3.pdf | ||
| Recovery F09SOL00028 NZP, Amend. #1.pdf | ||
| Recovery F09SOL00028, 0833134-0833135 NZP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
F09SOL00028
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
SMITHSONIAN INSTITUTION
0833135-083313405/15/2009000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/17/2009
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The Solicitation, number cited above in block 9A., for providing all supervision, labor, material and equipment for Removal and Replacement of the Fire Alarm Systems in the Visitor
Center and the Propagation Buildings & Boiler Plant located at the Smithsonian
Institution's National Zoological Park, Washington, DC, is hereby amended as follows:
CONTINUED ON PAGE 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Robert Fraga
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Smithsonian Institution Solicitation No. F09SOL00028, Amendment #000002 Recovery Project: Fire Alarm/Sprinkler @ NZP
14A. ADMINISTRATIVE CHANGES/ CLARIFICATIONS/ADDITIONAL
INFORMATION TO THE SOLICITATION AND/OR ITS DOCUMENTS:
Following are responses to questions received from prospective offerors:
1. A Bid Bond/Offer Guarantee of 20% is required for this solicitation.
2. By no later than 2:30 pm, May 19, 2009, offerors will be expected to provide separately bond copies of the technical proposal (5 copies) and cost proposal (3 copies) to the following address:
Melissa Howard Office of Contracting & Personal Property Management Smithsonian Institution 2011 Crystal Drive, Suite 350 Arlington, VA 22202 (Crystal City)
3. Addendum No. 1 dated May 1, 2009 to the construction documents (Project No. 0833135
Specifications and Drawings) is hereby incorporated and attached hereto. Please notice that this Addendum requires an additional line item (“Add Alternate No. 1”) in your cost proposal.
4. Addendum No. 2 dated May 2, 2009 to the construction documents (Project No. 0833135
Specifications and Drawings) is hereby incorporated and attached hereto.
5. Addendum No. 1 dated May 1, 2009 to the construction documents (Project No. 0833134
Specifications and Drawings) is hereby incorporated and attached hereto.
6. Addendum No. 2 dated May 13, 2009 to the construction documents (Project No.
0833134 Specifications and Drawings) is hereby incorporated and attached hereto.
14B. Except as provided herein, all terms and conditions of the Solicitation remain the same.
(END OF AMENDMENT NO. TWO)
600 Maryland Avenue, S.W. USPS Mail: OEDC Capital Gallery Suite 5001 MRC 511 Washington, D.C. 20024 P.O. Box 37012 Voice: 202.633.6230 Fax: 202.633.6233 Washington, D.C. 20013-7012
Project No: 0833135
Project Title: Fire Protection For Multiple Buildings - Visitor Center
Facility: Smithsonian National Zoological Park
The following addendum shall be attached to and form part of the specifications, and related documents.
Addendum No. 1
A. Section 01000 - Par. 3.1: Contract Time For Completion
Change total contract time from “90” calendar days to “220” calendar days.
B. Section 01000 - Par. 4 : Schedule Of Options For Bid
Change Par. 4.3 to the following:
4.3. Add Alternate No. 1: All work on the second floor shall start not earlier than 6:00 PM, and finish not later than 6:30 AM the following day.
C. Drawing A-0-63
Replace Note S-4 with the following:
Note S-4: Public Work Area No. 1 (which includes the Auditorium) will be closed to the public for a period of twenty eight(28) calendar days. All work in this area will be complete within this duration.
D. Drawing A-0-63
Add the following Note S-11: All work on the second floor shall start not earlier than 6:00 PM, and finish not later than 6:30 AM the following day
All other terms and conditions to remain the same.
You are to acknowledge receipt of this addendum, and to provide a separate price for ADD ALTERNATE NO.1 in your proposal.
May 1, 2009
Smithsonian Institution Addendum
Office of Engineering Design & Construction
Project No: 0833135
Project Title: Fire Protection For Multiple Buildings - Visitor Center
Addendum No. 2
A. Section 08710 - Par. 2.2.E.3: the representative acceptable product referenced, but not included in the specification, is attached below. (LCN 4040SE Series)
B. Drawing C-1-61, and C-1-62: the bamboo along the path of excavation for the new fire service main, not specifically indicated on the drawing,(but included as a general note under the general category of “trees”), is required to be removed and replaced/replanted.
The area of bamboo is approximately 210 square feet. (42’ x 5’ excavation width) All other drawing requirements, regarding replacement of existing plants, trees, shrubs, and mulching, are required.
C. Drawing C-1-61, and C-1-62: there is an existing irrigation system, not shown on the drawings, in a section of the path of excavation for the new fire service main. Contractor to include in his proposal, the removal/replacement of approximately 15 linear feet of 1-1/2” diameter PVC piping, and one(1) 2-1/2” irrigation head during the performance of the fire service piping installation. This is the area just north of Olmstead Walk.
D. Drawing C-1-62: Tree No. 258 has a critical root zone of 42’, and will require air spading, root pruning, and stake straw bales, per General Note 17 (the drawing does not indicate a critical root zone radius - the revised CRZ radius extends into the plane of the fire service main excavation.)
You are to acknowledge receipt of this addendum with your proposal.
May 13, 2009
600 Maryland Avenue, S.W. USPS Mail: OEDC Capital Gallery Suite 5001 MRC 511
LCN CLOSERS
121 W. RAILROAD AVE.
P.O. BOX 100
PRINCETON, IL, USA 61356-0100
PHONE 800-526-2400
FAX 800-248-1460
www.lcn.ingersollrand.com 9/0717
Standard 4040SE series closer shipped with a standard arm, 24V or 120V (please specify) SE track, standard cover, and wood and machine screw pack.
SEL tracks are optional, see 4040SE Series pages 20 & 21 for options.
Non-sized cylinders for interior doors to 4'0".
Hold-open force is adjustable.
Momentary on/off switch board assembly for testing door release also provides over-voltage protection. Field replaceable.
Functions as a full rack and pinion closer when hold-open is not engaged or current is interrupted.
Closer mounts on either push or pull side of the door.
Non-handed for mounting on either right or left hand door.
Concealed or surface wiring.
Interfaces with alarm systems. Consult factory for full details.
Standard or optional custom powder coated finishes on cover and arm.
Optional plated finishes.
The 4040SE SENTRONIC® is a heavy duty, non-handed, non-sized closer/holder designed to provide single point hold-open for fire and smoke barrier doors.
The door is held open until current interruption releases the holding mechanism and the door closes. Single lever (track) arm closer is specifically designed for interior doors. Choice of finishes, track functions, and installation accessories meet virtually all life safety requirements.
The 4040SE and SEL Series is UL listed for smoke barrier or labeled fire doors. cUL listed for self-closing doors without hold-open. Tested and certified under ANSI Standard
A156.15. Conforms to life safety code, NFPA 101.
FEA
TU
RE
S
LCN 4040SE SERIES
110° 95°
PLA
STIC
METAL
HIN
GE (PULL)
SIDE
TOP JAMB (PUSH)
STOP FA
CE (PUSH)
SW
IN
G FR
EE
DOUBLE
EGRESS
CONCEALE
D (FR
AME)
CONCEALE
D (D
OOR)
MOUNTING COVER CYLINDER *ARM FUNCTIONFINISH
NON-S
IZED
HANDED
SIZED
SINGLE
POINTHOLD
-OPEN
MULTI
-POINTHOLD
-OPEN
BYPASS 80
/14
POW
DER COAT
PLA
TED
REG
ULA
R(DOUBLE)
STA
NDARD(SINGLE)
Available Not available
* Maximum hold-open with standard template. See individual closer series for degrees of opening and hold-open per installation.
HINGE (PULL) SIDE MOUNTING
P.O. BOX 100
PRINCETON, IL, USA 61356-0100
PHONE 800-526-2400
FAX 800-248-1460
www.lcn.ingersollrand.com 9/0718
LCN 4040SE SERIES
Butt Hinges should not exceed 5" (127 mm) in width.
Swing Clear Hinges consult factory.
Auxiliary Stop is recommended at hold-open point.
Reveal should not exceed 1/8" (3 mm) for standard arm. Should not exceed 2 11/16" (68 mm) for double egress arm.
Top Rail minimum 3 1/2" (89 mm).
Installation with PLATE, 4040SE-18 requires SPECIAL TEMPLATE and 1 3/4" (44 mm) minimum top rail.
Head Frame requires 2" (51 mm) minimum.
Flush Ceiling with 2" (51 mm) head frame does not require special templating.
Door Width 2'4" (711 mm) minimum for single door with SE.
4'8" (1422 mm) minimum for paired doors with SE.
Clearance of 2 3/8" (60 mm) behind door required for 90° installation.
Wiring Diagram See “FIRE/LIFE SAFETY” section page 19 for typical wiring and electrical diagram.
MO
UN
TIN
GD
ETA
ILS
Options Long (SEL) track.
Handed double egress arm for reveal under 2 11/16” (67 mm).
Metal or Lead Lined cover.
24V or 120V input for SE or SEL, please specify.
Special Templates Customized installation templates or products may be available to solve unusual applications. Contact LCN for assistance.
HINGE (PULL) SIDE MOUNTING
Information applies to 4040 SE unless otherwise specified.
MAXIMUM OPENING
Templating allows 110°.
Hold-open points between 85° and 110° in approximately 3° increments.
Pull side mounting on a double egress frame requires a handed double egress arm.
Maximum hold-open to 95°.
2 11/16” (67 mm) maximum reveal on pull side.
SEL track provides hold-open points between 90° and 120°‚ in approximately 3° increments.
SE, SEL ELECTRICAL OPTIONS
These track assemblies require a single power circuit for the holding solenoid.
SE or SEL holding solenoid is either 24V or 120V input, please specify.
An optional 4040SE-3210 TRANSFORMER reduces 120V AC line voltage to 24V AC.
Circuitry accepts either AC or DC input.
P.O. BOX 100
PRINCETON, IL, USA 61356-0100
PHONE 800-526-2400
FAX 800-248-1460
www.lcn.ingersollrand.com 9/0719
STOP FACE (PUSH SIDE)
MOUNTING
Information applies to 4040 SE closers unless otherwise specified.
MAXIMUM OPENING
Templating allows 110°.
Hold-open points between 85° and 110° in approximately 3° increments.
SEL track provides hold-open points between 90° and 120°‚ in approximately 3° increments.
SE, SEL ELECTRICAL OPTIONS
These track assemblies require a single power circuit for the holding solenoid.
SE or SEL holding solenoid is either 24V or 120V input, please specify.
An optional 4040SE-3210 TRANSFORMER reduces 120V AC line voltage to 24V AC.
Circuitry accepts either AC or DC input.
Butt Hinges should not exceed 5" (127 mm) in width.
Auxiliary Stop is recommended at hold-open point.
Top Rail minimum 5 3/4" (146 mm).
Installation with PLATE, 4040SE-18PA requires SPECIAL TEMPLATE and 2" (51 mm) minimum top rail.
Stop Width 1 1/4" (32 mm) minimum.
Door Width 2'4" (711 mm) minimum for single door with SE.
4'8" (1422 mm) minimum for paired doors with SE.
Wiring Diagram
Options Long (SEL) track.
Metal or lead lined cover.
24V or 120V input for SE or SEL, please specify.
Special Templates Customized installation templates or products may be available to solve unusual applications. Contact LCN for assistance.
LCN 4040SE SERIES
SE WIRING DIAGRAM
P.O. BOX 100
PRINCETON, IL, USA 61356-0100
PHONE 800-526-2400
FAX 800-248-1460
www.lcn.ingersollrand.com 9/0720
CYLINDER
CYLINDER, 4040SE-3071
Standard, non-handed cast iron cylinder assembly.
COVERS
COVER, 4040SE-72
Standard, non-handed plastic cover.
LEAD LINED COVER, 4040SE-72LL
Optional, non-handed cover.
METAL COVER, 4040SE-72MC
Optional, handed cover. Required for plated finishes and custom powder coat finishes.
ARMS
STANDARD ARM, 4040SE-3077T
Non-handed arm, adjustable to select hold-open point.
DOUBLE EGRESS ARM, 4040SE-3077DE
Optional, handed arm for pull side installations on double egress doors and frames. Not required for push side mounting on double egress frames.
TRACKS
SE TRACK, 4040SE-3038
Standard, non-handed track for SE closers. Mounts on either head frame or stop. 24V or 120V AC/DC input for holding solenoid, please specify. Includes test switch assembly with fuse.
SEL TRACK, 4040SEL-3038
Optional, non-handed long track mounts on either head frame or stop. 24V or 120V AC/DC input standard for holding solenoid, please specify. Includes test switch assembly with fuse.
LCN 4040SE SERIES
AC
CE
SS
OR
IES
72LL
2210dps-3071
72MC
3077T
3077DE
SE-3038
SEL-3038
P.O. BOX 100
PRINCETON, IL, USA 61356-0100
PHONE 800-526-2400
FAX 800-248-1460
www.lcn.ingersollrand.com 9/0721
SWITCH
TEST SWITCH, 4040SE-3436
INSTALLATION ACCESSORIES
PLATE, 4040SE-18
Required where top rail is less than 3 1/2" (89 mm).
Plate requires minimum 2" (51 mm) top rail.
Plate installations require a SPECIAL TEMPLATE.
PLATE, 4040SE-18PA
Required where top rail is less than 5 3/4" (146 mm).
Plate requires minimum 2" (51 mm) top rail.
Plate installations require a SPECIAL TEMPLATE.
CONDUIT QUICK-CONNECTOR, 4040SE-81
Two piece connector for use with 1/2” conduit.
TRACK ROLLER, 4040SE-3034
Quiet, low friction roller assembly.
Shoulder dimension “X” = 1/8” (3 mm).
TRACK SLIDER, 4040SE-168
Alloy metal slider for use in SE series tracks only.
TRANSFORMER, 4040SE-3210
Reduces line voltage from 120V to 24V AC.
Mounted on cover for 4" (102 mm) x 4" x 2 1/8" (54 mm) junction box (by others).
18PA
4040SE-3210
LCN 4040SE SERIES
AC
CE
SS
OR
IES
P.O. BOX 100
PRINCETON, IL, USA 61356-0100
PHONE 800-526-2400
FAX 800-248-1460
www.lcn.ingersollrand.com 9/0722
LCN 4040SE SERIES
OR
DE
RIN
GI
NF
OR
MA
TIO
N HOW-TO-ORDER
4040SE SERIES CLOSERS
1. SELECT TRACK
nn SE nn SEL
2. VOLTAGE
nn 24V AC/DC nn 120V AC/DC
3. SPECIFY FINISH.
nn Standard Powder Coat __________
Aluminum, Dark Bronze , Tan, Statuary, Light Bronze, Black, Brass.
TABLE OF SIZES
4040SE series cylinders accommodate interior doors up to 48" (1219 mm) wide.
Closing power of 4040SE Series closers is adjustable through a range of sizes up to size 4.
Minimum door widths:
for SE on paired door, min. width 60” (1524 mm).
for SE, minimum door width 28" (711 mm).
for SEL, minimum door width 30" (762 mm).
Details are listed on the MOUNTING DETAILS pages.
size 3 size 4
4040SE
INTERIOR DOOR WIDTH
28"
711mm 34"
864mm 38"
965m 48"
1219mm
Closer will be shipped with;
– STANDARD CYLINDER,
– STANDARD COVER,
– STANDARD ARM,
– STANDARD TRACK,
– WOOD & MACHINE SCREW PACK,
unless options listed below are selected.
CLOSER OPTIONS
COVER
nn Metal (MC)
(please specify right or left hand) nn Lead Lined (LL)
FINISHES
nn Custom Powder Coat (RAL) ______________
(handed metal cover required) nn Plated Finish, US ___________
(handed metal cover required)
ARM
nn Double Egress (DE)
(please specify right or left hand)
SCREW PACK
nn TB*, Wood & Machine Screw (TBWMS) nn TORX Machine Screw (TORX) nn TB* & TORX Machine Screw (TBTRX)
* Specify door thickness if other than 1 3/4”.
INSTALLATION ACCESSORIES
nn Plate, 4040SE-18 nn Plate 4040SE-18PA nn Transformer, 4040SE-3210
SPECIAL TEMPLATE
nn ST- ________ (if required)
Minimum
SE
door width
1 . T h i s c l o s e r f e a t u r e s t w o m o u n t i n g o p t i o n s . B e f o r e b e g i n n i n g , d e t e r m i n e w h i c h t y p e o f m o u n t i n g b e s t a p p l i e s t o y o u r a p p l i c a t i o n o r h a s b e e n s p e c i f i e d f o r t h e j o b , t h e n b e s u r e t o u s e t h e p r o p e r t e m p l a t e .
2 . T h e v o l t a g e s h o w n o n t h e t r a c k c o v e r p l a t e m u s t m a t c h v o l t a g e s u p p l i e d t o d o o r f r a m e ( 2 4 V o r 1 2 0 V ) . I f c o n c e a l e d w i r i n g i s d e s i r e d , p r e p a r e t h e f r a m e t o s p e c i f i c a t i o n s s h o w n o n t h e c o r r e s p o n d i n g t e m p l a t e ( p u l l s i d e o r p u s h s i d e ) . I f s u r f a c e w i r i n g i s d e s i r e d , b e s u r e t o m o u n t t r a c k o n f r a m e b e f o r e r u n n i n g a n y E M T / c o n d u i t .
3 . D e p e n d i n g o n m o u n t i n g u s e d , i n s e r t p r o p e r t r a c k p l u g s i n t o s i d e o r t o p o f t h e t r a c k . U s i n g f a s t e n e r s p r o v i d e d , m o u n t t r a c k o n f r a m e t o t h e d i m e n s i o n s o f t h e t e m p l a t e b e i n g u s e d . R e m o v e s o l e n o i d c o v e r p l a t e a n d m a k e e l e c t r i c a l c o n n e c t i o n s ( S e e P g . 2 ) . N O T E : S w i t c h h o l e i n c o v e r p l a t e M U S T b e a l i g n e d w i t h t e s t / r e l e a s e s w i t c h w h e n r e - a t t a c h i n g p l a t e t o t r a c k .
4 . B e f o r e m o u n t i n g c l o s e r , t h e s p r i n g p o w e r m a y n e e d a d j u s t i n g . R e f e r t o t h e l a b e l o n t h e c l o s e r s p r i n g t u b e .
T h e 4 0 4 0 S E c o m e s p r e s e t a s a s i z e 3 . T h i s w i l l c o n t r o l a d o o r u p t o 3 8 " w i d e . I f d o o r i s w i d e r t h a n 3 8 " , a d j u s t c l o s e r a s s h o w n ( s e e i l l u s t r a t i o n b e l o w ) u p t o 7 f u l l t u r n s . S t a r t i n g t h e c o v e r s c r e w s a t t h i s p o i n t i s r e c o m m e n d e d . U s i n g f a s t e n e r s p r o v i d e d , m o u n t c l o s e r o n d o o r t o t h e d i m e n s i o n s o f t h e t e m p l a t e b e i n g u s e d .
5 . A R M I N S T A L L A T I O N : P l a c e a r m s p a c e r o v e r t o p s h a f t o f c l o s e r . I n s t a l l a r m a s f o l l o w s :
P u s h s i d e m o u n t i n g : P l a c e a r m h u b o v e r t o p c l o s e r s h a f t , p a r a l l e l w i t h d o o r . P l a c e a w r e n c h o n b o t t o m s h a f t o f c l o s e r a n d r o t a t e a w a y f r o m d o o r . W h e n f l a t s i n a r m h u b l i n e u p w i t h t h e f i r s t a v a i l a b l e f l a t s o f t h e s h a f t , s l i d e a r m h u b o n t o s h a f t . I n s e r t s h a f t s c r e w a n d t i g h t e n s e c u r e l y .
P u l l s i d e m o u n t i n g : P l a c e a r m h u b o v e r t o p c l o s e r s h a f t , p a r a l l e l w i t h d o o r . R o t a t e a r m a w a y f r o m d o o r u n t i l f l a t s i n a r m h u b l i n e u p w i t h f i r s t a v a i l a b l e f l a t s o f s h a f t . S l i d e a r m h u b o n t o c l o s e r s h a f t . I n s e r t s h a f t s c r e w a n d t i g h t e n s e c u r e l y .
6 . L o o s e n t h e s e t s c r e w i n a r m . C o n n e c t a r m t o t r a c k r o l l e r , a n d t i g h t e n s e t s c r e w f i r m l y .
7 . T o a d j u s t h o l d - o p e n p o s i t i o n o f d o o r : R e m o v e s c r e w i n t h e a d j u s t a b l e a r m a n d o p e n d o o r t o d e s i r e d p o s i t i o n . R e - i n s e r t s c r e w a n d t i g h t e n s e c u r e l y .
8 . R E G U L A T I O N : D o n o t a l l o w d o o r t o s l a m i n t o f r a m e . A " n o r m a l " c l o s i n g t i m e f r o m a 9 0 ° p o s i t i o n i s 5 t o 7 s e c o n d s , e v e n l y d i v i d e d b e t w e e n M A I N a n d L A T C H S P E E D . I f a d j u s t m e n t s a r e n e e d e d , u s e s o c k e t s c r e w k e y f u r n i s h e d . T o a d j u s t M A I N S P E E D , t u r n r e g u l a t i n g s c r e w ( s e e i l l u s t r a t i o n ) c l o c k w i s e t o s l o w s p e e d o r c . c . w . t o i n c r e a s e s p e e d . L A T C H S P E E D i s a d j u s t e d i n t h e s a m e w a y . W h e n a d j u s t i n g B A C K C H E C K , u s e l e a s t a m o u n t n e c e s s a r y t o r e t a r d s w i n g o f d o o r s u f f i c i e n t l y . T o a d j u s t B A C K C H E C K , t u r n r e g u l a t i n g s c r e w c l o c k w i s e t o i n c r e a s e t h e a m o u n t o f f o r c e o r c . c . w . t o r e d u c e t h e a m o u n t o f f o r c e . D O N O T U S E A N A B R U P T B A C K C H E C K S E T T I N G O R E X P E C T T H E D O O R C L O S E R T O A C T A S A S T O P !
9 . W i t h t h e d o o r o p e n s l i g h t l y , p l a c e t h e c o v e r o n t h e c l o s e r a n d h o l d i t f i r m l y a g a i n s t t h e d o o r w h i l e t i g h t e n i n g t h e c o v e r s c r e w s s e c u r e l y .
4 0 4 0 - S E I N S T R U C T I O N S H E E T
B A C K C H E C K M A I N S P E E D
L A T C H S P E E D
T O I N C R E A S E P O W E R
M A I N S P E E D
L A T C H S P E E D
B A C K C H E C K
0 5 / 0 4 © 2 0 0 4 S C H L A G E L O C K C o m p a n y . A l l r i g h t s r e s e r v e d . D P # 2 4 2 1 3 R 5
M A X I M U M O P E N I N G F O R C E
= 3 5 f t - l b s 6 2 N 4 8 N - m
1 - 8 0 0 - 5 2 6 - 2 4 0 0
I M P R O P E R I N S T A L L A T I O N O R R E G U L A T I O N M A Y R E S U L T I N
P E R S O N A L I N J U R Y O R P R O P E R T Y D A M A G E . F O L L O W A L L I N S T R U C T I O N S C A R E F U L L Y . F O R
Q U E S T I O N S , C A L L L C N A T 8 0 0 - 5 2 6 - 2 4 0 0
C A U T I O N!
H A Z A R D O U S V O L T A G E
C A N S H O C K A N D
C A U S E S E V E R E I N J U R Y
D is c o n n e c t p o w e r b e fo re m a k in g a n y e le c tr ic a l c o n n e c ti o n s o r p e rf o rm in g m a in te n a n c e
W A R N
IN
G
PU
LL
SID
E
MO
UN
TIN
G
PU
SH
SID
E
MO
UN
TIN
G
TR
AC
K
PL
UG
(TO
P)
EN
D
PL
UG AR
M
AD
JU
ST
SC
RE
W
CO
VE
R
PL
AT
E
SP
AC
ER
CO
VE
R
SC
RE
W
MO
VA
BL
E
CO
VE
R
IN
SE
RT
S
(R .H
. o r L
.H
CL
OS
ER
C
OV
ER
TR
AC
K
SL
ID
E
TR
AC
K P
LU
G (S
ID
E)
SE
TR
AC
K
AS
SE
MB
LY
TR
AC
K
RO
LL
ER
AR
M
SE
T
SC
RE
W
AR
M
SH
AF
T
SC
RE
W
SE
A
RM
AS
SE
MB
LY
SE
NT
RO
NI
C
CL
OS
ER
AS
SE
MB
LY
1.
W ith po we r o n, op en do or co mp let ely . D oo r s ho uld re ma in in op en po sit ion
. If do or do es no t s tay op en
, c he ck el ec tric al inp ut.
2.
Pu sh re lea se te st sw itc h.
Do or sh ou ld clo se im me dia tel y.
Op en th e d oo r to ho ld-op en po sit ion an d l et it r em ain th ere
3.
Sy ste m sh ou ld be ch ec ke d a t fr eq ue nt int erv als
. It is su gg es ted th at ste p 2 be re pe ate d e ve ry da ys
EL
EC
TR
IC
AL
C
HE
CK
OU
T:
HO
LD
O
PE
N
FO
RC
E A
DJ
US
TM
EN
T:
Lo ca te ho ld-op en ad jus tm en t s cre w in dia gra m ab ov e.
Fo r g rea ter ho ld op en fo rce
, in se rt s oc ke t s cre w ke y wr en ch (in clu de d i n s cre wp ac k) an d t urn cl oc kw ise . T o d ec rea se am ou nt of ho ld op en fo rce
, tu rn sc rew co un ter -cl oc kw ise . M ax im um of tur ns
WI
RI
NG
D
IA
GR
AM
- P
OL
AR
ITY
N
OT
IM
PO
RT
AN
T
IN
PU
T V
OL
TA
GE
V A C/
DC
O
R
0V
AC
/D C
(us ua lly fro m ala rm pa ne l o r d ete cto r)
FO
R
V A
C/
DC
w irin g co ns ult fa cto ry
HO
LD
-O
PE
N
FO
RC
E
AD
JU
ST
ME
NT
SC
RE
W
SO
LE
NO
ID
AS
SE
MB
LY
TE
RM
IN
AL
LE
AD
S
GR
OU
ND
TE
RM
IN
AL CO
ND
UI
T
HO
LE
PL
UG
RE
LE
AS
E
TE
ST
SW
ITC
H
TO
EI
TH
ER
TE
RM
IN
AL
OP
TIO
NA
L S
WI
TC
H
TO
EI
TH
ER
TE
RM
IN
AL
HAZARDOUS VOLTAGE
CAN SHOCK AND
CAUSE SEVERE INJURY
Disconnect power before m aking any electrical connections or perform ing m aintenance.
W ARNING!
1 . V o l t a g e s u p p l i e d t o u n i t M U S T m a t c h v o l t a g e s h o w n o n S e n t r o n i c l a b e l .
2 . I f d o o r i s h u n g o n p i v o t s : L o c a t e c l o s e r a n d t r a c k f r o m p i v o t p o i n t o f c e n t e r p i v o t . F o r o f f s e t p i v o t s , l o c a t e f r o m p i v o t p o i n t a n d a d d 3 / 8 " .
3 . F l o o r o r w a l l s t o p s s h o u l d b e u s e d .
4 . I f t h i s d i m e n s i o n i s g r e a t e r t h a n 1 1 5 / 1 6 " , c o n s u l t f a c t o r y .
5 . R e i n f o r c i n g p e r A N S I \ S D I - 1 0 0 i s r e c o m m e n d e d f o r h o l l o w m e t a l d o o r s a n d f r a m e s .
6 . I f s w i n g c l e a r h i n g s a r e b e i n g u s e d , c o n s u l t y f a c t o r y .
D O O R H O L D E R S O L E N O I D D A T A 2 4 V A C - D C N o m i n a l = 1 0 % - 1 5 % @ . 0 9 0 A m p . M a x .
1 2 0 V A C - D C N o m i n a l = 1 0 % - 1 5 % @ . 0 3 0 A m p . M a x .
F o r 1 2 v w i r i n g c o n s u l t f a c t o r y .
8 5 ° t o 1 1 0 ° H O L D O P E N
N o t e s -
HAZARDOUS VOLTAGE
CAN SHOCK AND
CAUSE SEVERE INJURY
Disconnect power before m aking any electrical connections or perform ing m aintenance.
W ARNING!
P U S H S I D E M O U N T I N G
N O T E S - 1 . V o l t a g e s u p p l i e d t o u n i t M U S T m a t c h v o l t a g e s h o w n o n S e n t r o n i c l a b e l .
2 . E l e c t r i c a l c o n n e c t o r i s p r o v i d e d b y L C N .
3 . L o c a t e c l o s e r a n d t r a c k f r o m C o f p i v o t o r s w i n g - c l e a r h i n g e p i n , i f u s e d .
4 . F l o o r o r w a l l s t o p s s h o u l d b e u s e d .
5 . R e i n f o r c i n g p e r A N S I \ S D I - 1 0 0 i s r e c o m m e n d e d f o r h o l l o w m e t a l d o o r s a n d f r a m e s .
L
D O O R H O L D E R S O L E N O I D D A T A 2 4 V A C - D C N o m i n a l = 1 0 % - 1 5 % @ . 0 9 0 A m p . M a x .
1 2 0 V A C - D C N o m i n a l = 1 0 % - 1 5 % @ . 0 3 0 A m p M a x .
F o r 1 2 V w i r i n g c o n s u l t f a c t o r y .
8 5 ° t o 1 1 0 ° H O L D O P E N
Project No: 0833134
Project Title: Fire Protection For Multiple Buildings Phase 2 - Boiler Plant & Propagation Building
Addendum No. 1
A. Section 01000 - Par. 3.1.1: Contract Time For Completion
For Boiler Plant, change total contract time from “45” calendar days to “90” calendar days.
B. Section 01000 - Par. 3.1.2
For Propagation Building, change total contract time from “30” calendar days to “90” calendar days.
C. Section 01000 - Par. 12
Revise Par. 12.1 as follows:
Par. 12.1: All animals will be removed from the Propagation 2nd Floor Area for the period of August 31st through September 13th, for the prosecution of the work. The Zoo staff will disinfect the work area as described in the “Smithsonian National Zoo Safety Procedures for the Prevention of Zoonotic Diseases from Non-Human Primates”. The COTR will notify the contractor’s project superintendent when the work area is safe, and has been properly prepared for construction activities.
D. Drawing A-0-94 (Propagation Building)
Revise Note S-2 as follows:
Note S-2: Work areas on the second floor, and the attic, other than the Genetics Lab, may be only accessed from August 31st through September 13th (fourteen(14) calendar days). For work in these areas, the following items are required at all times: safety glasses, hard hats, masks, work boots, long pants, long sleeved shirt;
no eating, drinking, or smoking are permitted in these areas; wash hands with soap, and water after work is complete in these areas, especially before eating, drinking, or smoking. Gloves are not an appropriate substitute for hand washing.
If soap, and water is not available, clean hands with an alcohol based hand sanitizer.
E. Drawing A-0-94 (Propagation Building)
Delete Note S-12, and Note S-13 (these notes are being deleted, as no animals will be present during the work on the second floor animal holding areas; no work items are specified or required to be installed interior to animal cages)
F. Drawing FA-1-91 (Boiler Plant)
Revise the location of FACP, and TRAN, and Diamond Notes 1, and 5, per attached annotated FA-1-91 drawing.
G. Propagation Buiding - photographs of the 2nd Floor, and Attic areas are attached for reference purposes.
You are to acknowledge receipt of this addendum in your proposal.
May 2, 2009
N ew
FA
C P and
TR
A N installation,and
D Iam ond N otes
1,and to be atthis location.
R em ove installation ofnew
FA
C P and
TR
A N ,and
D iam ond N otes
1,and atthis location.
A D D E N D U M N o.1 manzekd Sticky Note Propagation 2nd Floor Animal Holding Looking North
Propagation 2nd Floor Animal Holding Looking North
Propagation 2nd Floor Animal Holding Looking South
Propagation 2nd Floor Genetics Lab Looking South
Propagation 2nd Floor Naked Mole Rat Looking East
Propagation Attic Looking North
Propagation Attic Looking South
Project No: 0833134
Project Title: Fire Protection For Multiple Buildings Phase 2 - Boiler Plant & Propagation Building
Addendum No. 2
A. Specification Section 016722- Par. 1.06 - Spare Parts, and Special Tools
Revise the quantity of automatic detection devices, manual fire alarm stations, audible, and visual devices, and notification appliances to two(2) of each type to be supplied. (the specification referenced “2%, but not less than 5 of the installed quantity of each type”)
B. Drawing FA-1-91: Diamond note no. 10 identifies “house panel C” (this is a clarification only)
You are to acknowledge receipt of this addendum in your proposal.
May 13, 2009
| Recovery SOL28 0833135 Addendum No 1.pdf |
| Project No: 0833135 |
| UAddendum No. 1 |
| A. Section 01000 - Par. 3.1: Contract Time For Completion |
| Change total contract time from “90” calendar days to “220” calendar days. |
| B. Section 01000 - Par. 4 : Schedule Of Options For Bid |
| C. Drawing A-0-63 |
| D. Drawing A-0-63 |
| All other terms and conditions to remain the same. |
| Office of Engineering Design & Construction |
| Smithsonian Institution Addendum |
| Recovery SOL28 0833135 Addendum No 2.pdf |
| 2009-05-12_0833135_Addendum No. 2 |
| Visitor Center Door Closer |
| Recovery SOL28 0833134 Addendum No 1.pdf |
| 2009-05-02 0833134 Addendum No.1 |
| 2009-05-01 Addendum No. 1 |
| Propagation 2nd Floor Animal Holding Looking North a |
| Propagation 2nd Floor Animal Holding Looking North b |
| Propagation 2nd Floor Animal Holding Looking South |
| Propagation 2nd Floor Genetics Lab Looking South |
| Propagation 2nd Floor Naked Mole Rat Looking East |
| Propagation Attic Looking North |
| Propagation Attic Looking South |
| Recovery SOL28 0833134 Addendum No 2.pdf |
| Project No: 0833134 |
| UAddendum No. 2 |
| A. Specification Section 016722- Par. 1.06 - Spare Parts, and Special Tools |
| Revise the quantity of automatic detection devices, manual fire alarm stations, audible, and visual devices, and notification appliances to two(2) of each type to be supplied. (the specification referenced “2%, but not less than 5 of the installed... |
| All other terms and conditions to remain the same. |
| Office of Engineering Design & Construction |
| Smithsonian Institution Addendum |
File details come from the government source that posted it. Updated .