F. IT Additional terms and Conditions (official).pdf

PDF 459 KB Posted

Attached to
Early Markers of Alzheimer’s Disease: PET Imaging in the Baltimore Longitudinal Study of Aging (BLSA)
Solicitation number
75N95023Q00065
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Language – Baltimore Longitudinal Study of Aging (BLSA) Data Science Consulting Services

Section C - REPORTING REQUIREMENTS

HHS SECURITY AND PRIVACY LANGUAGE FOR INFORMATION

AND IT PROCUREMENTS

INFORMATION AND/OR PHYSICAL SECURITY

A. Assessment and Authorization (A&A)- A valid authority to operate (ATO) certifies that the Contractor's information system meets the contract's requirements to protect the agency data. If the system under this contract does not have a valid ATO, the Contractor (and/or any subcontractor) must work with the agency and supply the deliverables required to complete the ATO within the specified timeline(s) within three (3) months after contract award. The Contractor must conduct the A&A requirements in accordance with HHS IS2P, NIST SP 800-37, Guide for Applying the Risk Management Framework to Federal Information Systems: A Security Life Cycle Approach (latest revision).

For an existing ATO, Contracting Officer Representative must make a determination if the existing ATO provides appropriate safeguards or if an additional ATO is required for the performance of the contract and state as such.

NIH acceptance of the ATO does not alleviate the Contractor's responsibility to ensure the system security and privacy controls are implemented and operating effectively.

B. A&A Package Deliverables - The Contractor (and/or any subcontractor) must provide an A&A package within 30 days of contract award to the CO and/or COR. The following A&A deliverables are required to complete the A&A package.

C. System Security Plan (SSP) - due within 30 days after contract award. The SSP must comply with the NIST SP 800-18, Guide for Developing Security Plans for Federal Information Systems, the Federal Information Processing Standard (FIPS) 200, Recommended Security Controls for Federal Information Systems, and NIST SP 800-53, Security and Privacy Controls for Federal Information Systems and Organizations applicable baseline requirements, and other applicable NIST guidance as well as HHS and NIH policies and other guidance. The SSP must be consistent with and detail the approach to IT security contained in the Contractor's bid or proposal that resulted in the award of this contract. The SSP must provide an overview of the system environment and security requirements to protect the information system as well as describe all applicable security controls in place or planned for meeting those requirements. It should provide a structured process for planning adequate, cost-effective security protection for a system. The Contractor must update the SSP at least annually thereafter.

D. Security Assessment Plan/Report (SAP/SAR) - due 30 days after the contract award. The security assessment must be conducted by the assessor and be consistent with NIST SP 800-53A, NIST SP 800-30, and HHS and NIH policies. The assessor will document the assessment results in the SAR.

The NIH should determine which security control baseline applies and then make a determination on the appropriateness/necessity of obtaining an independent assessment. Assessments of controls can be performed by Contractor, government, or third parties, with third party verification considered the strongest. If independent assessment is required, include statement below.

Thereafter, the Contractor, in coordination with the NIH shall conduct/assist in the assessment of the security controls and update the SAR at least annually.

E. Independent Assessment - due 90 days after the contract award. The Contractor (and/or subcontractor) must have an independent third-party validate the security and privacy controls in place for the system(s). The independent third party must review and analyze the Security Authorization package, and report on technical, operational, and management level deficiencies as outlined in NIST SP 800-53. The Contractor must address all "high" deficiencies before submitting the package to the Government for acceptance. All remaining deficiencies must be documented in a system Plan of Actions and Milestones (POA&M).

F. Plan of Actions and Milestones (&M) - due 30 days after contract award. The POA&M must be documented consistent with the HHS Standard for Plan of Action and Milestones and NIH policies.

All findings/weaknesses must be documented in the POA&M and remediated/mitigated from the date the weaknesses are formally identified and documented by the timelines below:

• Critical within 30 days;

• High within 60 days;

• Medium within 1 year; and

• Low within 1 year.

The NIH will determine the risk rating of vulnerabilities. Identified risks stemming from deficiencies related to the security control baseline implementation, assessment, continuous monitoring, vulnerability scanning, and other security reviews and sources, as documented in the SAR, must be documented and tracked by the Contractor for mitigation in the POA&M document. Depending on the severity of the risks, NIH may require designated POAM weaknesses to be remediated before an ATO is issued. Thereafter, the POA&M must be updated at least quarterly.

G. Contingency Plan and Contingency Plan Test - due 60 days after contract award. The Contingency Plan must be developed in accordance with NIST SP 800-34, Contingency Planning Guide for Federal Information Systems, and be consistent with HHS and NIH policies. Upon acceptance by the System Owner, the Contractor, in coordination with the System Owner, must test the Contingency Plan and prepare a Contingency Plan Test Report that includes the test results, lessons learned and any action items that need to be addressed. Thereafter, the Contractor must update and test the Contingency Plan at least annually.

H. E-Authentication Questionnaire - The contractor (and/or any subcontractor) must collaborate with government personnel to ensure that an E-Authentication Threshold Analysis (E-auth TA) is completed to determine if a full E-Authentication Risk Assessment (E-auth RA) is necessary. System documentation developed for a system using E-auth TA/E-auth RA methods must follow OMB 04- 04 and NIST SP 800-63, Rev. 2, Electronic Authentication Guidelines.

Based on the level of assurance determined by the E-Auth, the Contractor (and/or subcontractor) must ensure appropriate authentication to the system, including remote authentication, is in-place in accordance with the assurance level determined by the E-Auth (when required) in accordance with HHS policies.

I. POSITION SENSITIVITY DESIGNATIONS

All Contractor (and/or any subcontractor) employees must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR). To determine the designation, the Position Designation Tool (PDT) discussion is found at: https://www.ors.od.nih.gov/ser/dpsac/resources/Pages/investigation-requirements-for-your-position.aspx and the link to access the tool is found at: https://pdt.nbis.mil/ .

The following position sensitivity designation levels apply to this solicitation/contract:

[ ] Tier 5: Critical Sensitive and Special Sensitive National Security, including Top Secret, SCI, and "Q" access eligibility.

[ ] Tier 5SR: Reinvestigation.

[ ] Tier 4: High Risk Public Trust (HRPT).

[ ] Tier 4SR: Reinvestigation.

[ ] Tier 3: Non-Critical Sensitive, National Security, including Secret and "L" access eligibility.

[ ] Tier 3SR: Reinvestigation.

[X] Tier 2S with Subject Interview: Moderate Risk Public Trust (MRPT).

[ ] Tier 2SR: Reinvestigation.

[ ] Tier 1: Low Risk, Non-Sensitive, including HSPD-12 Credentialing.

J. HOMELAND SECURITY PRESIDENTIAL DIRECTIVE (HSPD)-12

Roster-

The Contractor (and/or any subcontractor) must submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s). The roster must be submitted to the COR and/or CO within fourteen (14) calendar days after the effective date of this contract. Any revisions to the roster as a result of staffing changes must be submitted within seven (7) calendar days of the change. The COR will notify the Contractor of the appropriate level of investigation required for each staff member. An electronic template, "Roster of Employees Requiring Suitability Investigations," is available for contractor use at: https://oamp.od.nih.gov/nih-document-generation-system/dgs-workform-information/attachment-files-section-j

a. If the Contractor is filling a new position, the Contractor must provide a position description and the Government will determine the appropriate suitability level. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.

b. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor must complete and submit the required forms within 30 days of the notification.

c. The Contractor must notify the Contracting Officer in advance when any new personnel, who are subject to a background check/investigation, will work under the contract and if they have previously been the subject of national agency checks or background investigations.

https://www.ors.od.nih.gov/ser/dpsac/resources/Pages/investigation-requirements-for-your-position.aspx https://www.ors.od.nih.gov/ser/dpsac/resources/Pages/investigation-requirements-for-your-position.aspx https://pdt.nbis.mil/ https://oamp.od.nih.gov/nih-document-generation-system/dgs-workform-information/attachment-files-section-j https://oamp.od.nih.gov/nih-document-generation-system/dgs-workform-information/attachment-files-section-j

d. All contractor and subcontractor employees must comply with the conditions established for their designated position sensitivity level prior to performing any work under this contract. Contractors may begin work after the fingerprint check has been completed.

e. Investigations are expensive and may delay performance, regardless of the outcome of the investigation. Delays associated with rejections and consequent re-investigations may not be excusable in accordance with the FAR clause, Excusable Delays - see FAR 52.249-14. Accordingly, the Contractor must ensure that any additional employees whose names it submits for work under this contract have a reasonable chance for approval.

f. Typically, the Government investigates personnel at no cost to the Contractor. However, multiple investigations for the same position may, at the Contracting Officer's discretion, justify reduction(s) in the contract price of no more that the cost of the additional investigation(s).

g. The Contractor must include language similar to this "HHS Controlled Facilities and Information Systems Security" language in all subcontracts that require subcontractor personnel to have the same frequency and duration of (1) physical access to an HHS-controlled facility; (2) logical access to an HHS-controlled information system; (3) access to sensitive HHS data/information, whether in an HHS-controlled information system or in hard copy; or (4) any combination of circumstances (1) through (3).

h. The Contractor must direct inquiries, including requests for forms and assistance, to the Contracting Officer or designee.

i. Within 7 calendar days after the Government's final acceptance of the work under this contract, or upon termination of the contract, the Contractor must return all identification badges to the Contracting Officer or designee.

K. CONTRACT INITIATION AND EXPIRATION

a. General Security Requirements - The Contractor (and/or any subcontractor) must comply with information security and privacy requirements, Enterprise Performance Life Cycle (EPLC) processes, HHS Enterprise Architecture requirements to ensure information is appropriately protected from initiation to expiration of the contract. All information systems development or enhancement tasks supported by the Contractor must follow the HHS EPLC framework and methodology or and in accordance with the HHS Contract Closeout Directive (2018) located at:

https://oamp.od.nih.gov/sites/default/files/DGS/contracting-forms/HHS-Closeout-Directive- 2018.pdf . HHS EA requirements located at: https://www.hhs.gov/sites/default/files/eplc-policy-dec-2016.pdf and NIH EA requirements are located at: https://ocio.nih.gov/PM/Pages/EPLC.aspx

b. System Documentation - Contractors (and/or any subcontractors) must follow and adhere to HHS System Development Life Cycle requirements, at a minimum, for system development and provide system documentation at designated intervals ( specifically, at the expiration of the contract) within the EPLC that require artifact review and approval.

c. Sanitization of Government Files and Information - As part of contract closeout and at expiration of the contract, the Contractor ( and/ or any subcontractor) must provide all required documentation in accordance with the NIH Media Sanitization and Disposal Policy to the CO and/ or COR to certify that, at the government's direction, all electronic and paper records are appropriately disposed of and all devices and media are sanitized in accordance with NIST SP 800- 88, Guidelines for Media Sanitization.

d. Notification - The Contractor ( and/ or any subcontractor) must notify the CO and/ or COR and system ISSO within fifteen days before an employee stops working under this contract.

https://oamp.od.nih.gov/sites/default/files/DGS/contracting-forms/HHS-Closeout-Directive-2018.pdf https://oamp.od.nih.gov/sites/default/files/DGS/contracting-forms/HHS-Closeout-Directive-2018.pdf https://oamp.od.nih.gov/sites/default/files/DGS/contracting-forms/HHS-Closeout-Directive-2018.pdf https://www.hhs.gov/sites/default/files/eplc-policy-dec-2016.pdf https://www.hhs.gov/sites/default/files/eplc-policy-dec-2016.pdf https://ocio.nih.gov/PM/Pages/EPLC.aspx

e. Contractor Responsibilities Upon Physical Completion of the Contract- The Contractor ( and/ or any subcontractors) must return all government information and IT resources ( i.e., government information in non- government- owned systems, media, and backup systems) acquired during the term of this contract to the CO and/ or COR. Additionally, the Contractor must provide a certification that all government information has been properly sanitized and purged from Contractor- owned systems, including backup systems and media used during contract performance, in accordance with HHS and/ or NIH policies.

f. The Contractor ( and/or any subcontractor) must perform and document the actions identified in the NIH Contractor Employee Separation Checklist https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Emp-sep-checklist.pdf when an employee terminates work under this contract within 2 days of the employee's exit from the contract. All documentation must be made available to the CO and/ or COR upon request.

g. Contractor Non- Disclosure Agreement (NDA)- Each Contractor ( and/ or any subcontractor) employee having access to non- public government information under this contract shall complete the NIH non- disclosure agreement: https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/ Nondisclosure.pdf , as applicable. A copy of each signed and witnessed NDA must be submitted to the Contracting Officer ( CO) and/ or CO Representative ( COR) prior to performing any work under this acquisition.

h. Vulnerability Scanning Reports - The Contractor must report the results of the required monthly special vulnerability scans no later than 10 days following the end of each reporting period. If required monthly, this report may be included as part of the Technical Progress Report. Otherwise, this report must be submitted under a separate cover on monthly basis.

i. Government Access for Security Assessment. In addition to the Inspection Clause in the contract, the Contractor (and/or any subcontractor) must afford the Government access to the Contractor's facilities, installations, operations, documentation, information systems, and personnel used in performance of this contract to the extent required to carry out a program of security assessment ( to include vulnerability testing), investigation, and audit to safeguard against threats and hazards to the confidentiality, integrity, and availability of federal data or to the protection of information systems operated on behalf of HHS, including but are not limited to:

i. At any tier handling or accessing information, consent to and allow the Government, or an independent third party working at the Government's direction, without notice at any time during a weekday during regular business hours contractor local time, to access contractor and subcontractor installations, facilities, infrastructure, data centers, equipment (including but not limited to all servers, computing devices, and portable media), operations, documentation (whether in electronic, paper, or other forms), databases, and personnel which are used in performance of the contract. The Government includes but is not limited to the U.S. Department of Justice, U.S. Government Accountability Office, and the HHS Office of the Inspector General (OIG). The purpose of the access is to facilitate performance inspections and reviews, security and compliance audits, and law enforcement investigations. For security audits, the audit may include but not be limited to such items as buffer overflows, open ports, unnecessary services, lack of user input filtering, cross site scripting vulnerabilities, SQL injection vulnerabilities, and any other known vulnerabilities.

ii. At any tier handling or accessing protected information, fully cooperate with all audits, inspections, investigations, forensic analysis, or other reviews or requirements needed to carry out requirements presented in applicable law or policy. Beyond providing access, full cooperation also includes, but is not limited to, disclosure to investigators of information https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Emp-sep-checklist.pdf https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Emp-sep-checklist.pdf https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Nondisclosure.pdf https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Nondisclosure.pdf https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Nondisclosure.pdf sufficient to identify the nature and extent of any criminal or fraudulent activity and the individuals responsible for that activity. It includes timely and complete production of requested data, metadata, information, and records relevant to any inspection, audit, investigation, or review, and making employees of the contractor available for interview by inspectors, auditors, and investigators upon request. Full cooperation also includes allowing the Government to make reproductions or copies of information and equipment, including, if necessary, collecting a machine or system image capture.

iii. Segregate Government protected information and metadata on the handling of Government protected information from other information. Commingling of information is prohibited. Inspectors, auditors, and investigators will not be precluded from having access to the sought information if sought information is commingled with other information.

iv. Cooperate with inspections, audits, investigations, and reviews.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

HHS SECURITY AND PRIVACY LANGUAGE FOR INFORMATION

AND IT PROCUREMENTS

ARTICLE H. INFORMATION SECURITY AND/OR PHYSICAL ACCESS SECURITY

A. Baseline Security Requirements

a. Applicability. The requirements herein apply whether the entire contract or order (hereafter

"contract"), or portion thereof, includes either or both of the following:

i. Access (Physical or Logical) to Government Information: A Contractor (and/or any subcontractor) employee will have or will be given the ability to have, routine physical (entry) or logical (electronic) access to government information.

ii. Operate a Federal System Containing Information: A Contractor (and/or any subcontractor) will operate a federal system and technology containing data that supports the HHS mission. In addition to the Federal Acquisition Regulation (FAR) Subpart 2.1 definition of "information technology" (IT), the term as used in this section includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources.

b. Safeguarding Information and Information Systems. All government information and information systems must be protected in accordance with HHS/NIH policies and level of risk. At a minimum, the Contractor (and/or any subcontractor) must:

i. Protect the:

Confidentiality, which means preserving authorized restrictions on access and disclosure, based on the security terms found in this contract, including means for protecting personal privacy and proprietary information;

Integrity, which means guarding against improper information modification or destruction, and ensuring information non-repudiation and authenticity; and

Availability, which means ensuring timely and reliable access to and use of information.

ii. Categorize all information owned and/or collected/managed on behalf of HHS/NIH and information systems that store, process, and/or transmit HHS information in accordance with FIPS 199 and National Institute of Standards and Technology (NIST) Special Publication (SP) 800-60, Volume II: Appendices to Guide for Mapping Types of Information and Information Systems to Security Categories . Based on information provided by the ISSO, CISO, OpDiv SOP, or other representative, the impact level for each Security Objective (Confidentiality, Integrity, and Availability) and the Overall Impact Level, which is the highest watermark of the three factors of the information or information system are the following:

Confidentiality: [X] Low [ ] Moderate [ ] High Integrity: [ ] Low [X] Moderate [ ] High Availability: [X] Low [ ] Moderate [ ] High Overall Risk Level: [ ] Low [X] Moderate [ ] High http://csrc.nist.gov/publications/nistpubs/800-60-rev1/SP800-60_Vol2-Rev1.pdf http://csrc.nist.gov/publications/nistpubs/800-60-rev1/SP800-60_Vol2-Rev1.pdf http://csrc.nist.gov/publications/nistpubs/800-60-rev1/SP800-60_Vol2-Rev1.pdf

iii. Based on the agreed-upon level of impact, implement the necessary safeguards to protect all information systems and information collected and/or managed on behalf of HHS/NIH regardless of location or purpose.

iv. Report any discovered or unanticipated threats or hazards by either the agency or contractor, or if existing safeguards have ceased to function immediately after discovery, within one (1) hour or less, to the government representative(s).

v. Adopt and implement all applicable policies, procedures, controls, and standards required by the HHS/NIH Information Security Program to ensure the confidentiality, integrity, and availability of government information and government information systems for which the Contractor is responsible under this contract or to which the Contractor may otherwise have access under this contract. Obtain all applicable security and privacy policies by contacting the CO/COR or HHS/NIH security and/or privacy officials.

c. Privacy Act. Comply with the Privacy Act requirements (when applicable), and tailor FAR and HHSAR clauses as needed.

d. Privacy Compliance. Comply with the E-Government Act of 2002, NIST SP 800-53, and applicable HHS/OpDiv privacy policies, and complete all the requirements below:

i. Per the Office of Management and Budget (OMB) Circular A-130, Personally Identifiable Information (PII), is "information that can be used to distinguish or trace an individual's identity, either alone or when combined with other information that is linked or linkable to a specific individual." Examples of PII include, but are not limited to the following: Social Security number, date and place of birth, mother's maiden name, biometric records, etc.

ii. Based on information provided by the ISSO, system/ data owner, or other security or privacy representative, it has been determined that this solicitation/ contract involves:

[ ] No PII [X] PII

iii. The Contractor must support the agency with conducting a Privacy Threshold Analysis ( PTA) for the information system and/ or information handled under this contract to determine whether or not a full Privacy Impact Assessment ( PIA) needs to be completed.

• If the results of the PTA show that a full PIA is needed, the Contractor must support the agency with completing a PIA for the system or information within 60 days after completion of the PTA and in accordance with HHS policy and OMB M-03-22, Guidance for Implementing the Privacy Provisions of the E- Government Act of 2002.

• The Contractor must support the agency in reviewing the PIA at least every three years throughout the system development lifecycle (SDLC)/information lifecycle, or when determined by the agency that a review is required based on a major change to the system, or when new types of PII are collected that introduces new or increased privacy risks, whichever comes first.

e. Controlled Unclassified Information (CUI). Executive Order 13556 defines CUI as "information that laws, regulations, or Government-wide policies require to have safeguarding or dissemination controls, excluding classified information." The Contractor (and/or any subcontractor) must comply with Executive Order 13556, Controlled Unclassified Information, (implemented at 3 CFR, part 2002) when handling CUI. 32 C.F.R. 2002.4(aa) As implemented the term " handling " refers to "…any use of CUI, including but not limited to marking, safeguarding, transporting, disseminating, re-using, and disposing of the information." 81 Fed. Reg. 63323. The requirements below apply only to nonfederal systems that process, store, or transmit CUI, or that provide security protection for such components. All sensitive information that has been identified as CUI by a regulation or statute, handled by this solicitation/contract, must be:

i. Marked appropriately;

ii. Disclosed to authorized personnel on a Need-To-Know basis;

iii. Protected in accordance with NIST SP 800-53, Security and Privacy Controls for Information

Systems and Organizations applicable baseline if handled by a Contractor system operated on behalf of the agency, or NIST SP 800-171, Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations if handled by internal Contractor system; and

iv. Returned to HHS control, destroyed when no longer needed, or held until otherwise directed. Information and/or data must be disposed of in accordance with NIST SP 800-88, Guidelines for Media Sanitization .

f. Protection of Sensitive Information. For security purposes, information is or may be sensitive because it requires security to protect its confidentiality, integrity, and/or availability. The Contractor (and/or any subcontractor) must protect all government information that is or may be sensitive by securing it with a solution that is validated with current FIPS 140 validation certificate from the NIST CMVP.

g. Confidentiality and Nondisclosure of Information. Any information provided to the contractor (and/or any subcontractor) by HHS or collected by the contractor on behalf of HHS must be used only for the purpose of carrying out the provisions of this contract and must not be disclosed or made known in any manner to any persons except as may be necessary in the performance of the contract. The Contractor assumes responsibility for protection of the confidentiality of Government records and must ensure that all work performed by its employees and subcontractors must be under the supervision of the Contractor. Each Contractor employee or any of its subcontractors to whom any HHS records may be made available or disclosed must be notified in writing by the Contractor that information disclosed to such employee or subcontractor can be used only for that purpose and to the extent authorized herein.

The confidentiality, integrity, and availability of such information must be protected in accordance with HHS and NIH policies. Unauthorized disclosure of information will be subject to the HHS/NIH sanction policies and/or governed by the following laws and regulations:

i. 18 U.S.C. 641 (Criminal Code: Public Money, Property or Records);

ii. 18 U.S.C. 1905 (Criminal Code: Disclosure of Confidential Information); and

iii. 44 U.S.C. Chapter 35, Subchapter I (Paperwork Reduction Act).

h. Internet Protocol Version 6 (IPv6). All procurements using Internet Protocol must comply with

OMB Memorandum M-05-22, Transition Planning for Internet Protocol Version 6 (IPv6).

i. Information and Communications Technology (ICT). ICT products and services from prohibited entities/sources must not be used/acquired in compliance with Public Law 115-232, Section 889 Parts A and B, FAR 4.21, FAR 52.204.23, FAR 52.204.24, and FAR 52.204.25. The contractor (and/or any subcontractor) must notify the government if they identify prohibited ICT products and/or services are used during the contract performance.

j. Government Websites. All new and existing public-facing government websites must be securely configured with Hypertext Transfer Protocol Secure (HTTPS) using the most recent version of Transport Layer Security (TLS). In addition, HTTPS must enable HTTP Strict Transport Security (HSTS) to instruct compliant browsers to assume HTTPS at all times to reduce the number of insecure redirects and protect against attacks that attempt to downgrade connections to plain

HTTP. For internal-facing websites, HTTPS is not required, but it is highly recommended. Consult the HHS Policy for Internet and Email Security for additional information.

k. Contract Documentation. The Contractor must use provided templates, policies, forms and other agency documents. NIH will specify which documents/forms will be provided to comply with contract deliverables as appropriate.

l. Standard for Encryption. The Contractor (and/or any subcontractor) must:

i. Comply with the HHS Standard for Encryption of Computing Devices and Information to prevent unauthorized access to government information.

ii. Encrypt all sensitive federal data and information (i.e., PII, protected health information

[PHI], proprietary information, etc.) in transit (i.e., email, network connections, etc.) and at rest (i.e., servers, storage devices, mobile devices, backup media, etc.) with encryption solution that is validated with current FIPS 140 validation certificate from the NIST CMVP.

iii. Secure all devices (i.e.: desktops, laptops, mobile devices, etc.) that store and process government information and ensure devices meet HHS and NIH-specific encryption standard requirements. Maintain a complete and current inventory of all laptop computers, desktop computers, and other mobile devices and portable media that store or process sensitive government information (including PII).

iv. Verify that the encryption solutions in use have been validated under the Cryptographic Module Validation Program to confirm compliance with current FIPS 140 validation certificate from the NIST CMVP. The Contractor must provide a written copy of the validation documentation to the COR within 15 days of the validation.

v. Use the Key Management system on the HHS personal identification verification (PIV) card or establish and use a key recovery mechanism to ensure the ability for authorized personnel to encrypt/decrypt information and recover encryption keys http://csrc.nist.gov/publications/ . Encryption keys must be provided to the COR upon request and at the conclusion of the contract.

m. Contractor Non-Disclosure Agreement (NDA). Each Contractor (and/or any subcontractor) employee having access to non-public government information under this contract must complete the OpDiv non-disclosure agreement, https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Nondisclosure.pdf , as applicable. Contractors (and/or subcontractors) must submit a copy of each signed and witnessed NDA to the Contracting Officer (CO) and/or CO Representative (COR) prior to performing any work under this acquisition.

2. Training Requirements

a. Mandatory Training for All Contractor Staff. All Contractor (and/or any subcontractor) employees assigned to work on this contract shall complete the applicable HHS/NIH Contractor Information Security Awareness, Privacy, and Records Management training course at http://irtsectraining.nih.gov/ before performing any work under this contract. Thereafter, the employees shall complete NIH Information Security Awareness, Privacy, and Records Management training at least annually, during the life of this contract. All provided training shall be compliant with HHS training policies.

b. Role-based Training. All Contractor (and/or any subcontractor) employees with significant security responsibilities (as determined by the program manager) must complete role- based training annually commensurate with their role and responsibilities in accordance with HHS policy and the HHS Role- Based Training (RBT) of Personnel with Significant Security Responsibilities http://csrc.nist.gov/publications/ http://csrc.nist.gov/publications/ https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Nondisclosure.pdf https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Nondisclosure.pdf http://irtsectraining.nih.gov/ http://irtsectraining.nih.gov/

Memorandum. Read further guidance about the NIH Role-based Training at: https://www.hhs.gov/about/agencies/asa/ocio/cybersecurity/security-awareness-training/index.html .

c. Training Records. The Contractor (and/or any subcontractor) shall maintain training records for all its employees working under this contract in accordance with HHS policy. A copy of the training records shall be provided to the CO and/or COR within 30 days after contract award and annually thereafter or upon request.

3. Rules of Behavior

a. The Contractor (and/or any subcontractor) must ensure that all employees performing on the contract comply with the HHS Information Technology General Rules of Behavior, HHS Rules of Behavior for Privileged Users.

b. All Contractor employees performing on the contract must read and adhere to the Rules of Behavior before accessing Department data or other information, systems, and/or networks that store/process government information, initially at the beginning of the contract and at least annually thereafter, which may be done as part of annual NIH Information Security Awareness Training. If the training is provided by the Contractor, the signed ROB must be provided as a separate deliverable to the CO and/or COR per defined timelines above.

4. Incident Response

a. The Contractor (and/or any subcontractor) must respond to all alerts/Indicators of Compromise

(IOCs) provided by HHS Computer Security Incident Response Center (CSIRC)/NIH IRT teams within 24 hours, whether the response is positive or negative.

FISMA defines an incident as "an occurrence that (1) actually or imminently jeopardizes, without lawful authority, the integrity, confidentiality, or availability of information or an information system; or (2) constitutes a violation or imminent threat of violation of law, security policies, security procedures, or acceptable use policies. In accordance with OMB M-17-12, Preparing for and Responding to a Breach of Personally Identifiable Information (PII) , an incident is "an occurrence that (1) actually or imminently jeopardizes, without lawful authority, the integrity, confidentiality, or availability of information or an information system; or (2) constitutes a violation or imminent threat of violation of law, security policies, security procedures, or acceptable use policies" and a privacy breach is "the loss of control, compromise, unauthorized disclosure, unauthorized acquisition, or any similar occurrence where (1) a person other than an authorized user accesses or potentially accesses personally identifiable information or (2) an authorized user accesses or potentially accesses personally identifiable information for an other than authorized purpose." For additional information on the HHS breach response process, please see the HHS Policy and Plan for Preparing for and Responding to a Breach of Personally Identifiable Information (PII)."

b. In the event of a suspected or confirmed incident or breach, the Contractor (and/or any subcontractor) must:

i. Protect all sensitive information, including any PII created, stored, or transmitted in the performance of this contract, with encryption solution that is validated with current FIPS 140 validation certificate from the NIST CMVP.

ii. NOT notify affected individuals unless so instructed by the Contracting Officer or designated representative. If so instructed by the Contracting Officer or representative, the Contractor must send NIH approved notifications to affected individuals in accordance with https://www.hhs.gov/about/agencies/asa/ocio/cybersecurity/security-awareness-training/index.html https://www.hhs.gov/about/agencies/asa/ocio/cybersecurity/security-awareness-training/index.html https://wiki.ocio.nih.gov/wiki/index.php/US-CERT_Federal_Incident_Notification_Guidelines https://wiki.ocio.nih.gov/wiki/index.php/US- CERT_Federal_Incident_Notification_Guidelines

iii. Report all suspected and confirmed information security and privacy incidents and breaches to the OpDiv Incident Response Team (IRT) via email at IRT@mail.nih.gov , COR, CO, OpDiv SOP (or his or her designee), and other stakeholders, including breaches involving PII, in any medium or form, including paper, oral, or electronic, as soon as possible and without unreasonable delay, no later than one (1) hour, and consistent with the applicable OpDiv and HHS policy and procedures, NIST standards and guidelines, as well as US-CERT notification guidelines. The types of information required in an incident report must include at a minimum: company and point of contact information, contact information, impact classifications/threat vector, and the type of information compromised. In addition, the Contractor must:

Cooperate and exchange any information, as determined by the Agency, necessary to effectively manage or mitigate a suspected or confirmed breach;

Not include any sensitive information in the subject or body of any reporting e-mail;

and Encrypt sensitive information in attachments to email, media, etc.

iv. Comply with OMB M-17-12, Preparing for and Responding to a Breach of Personally Identifiable Information, and HHS/NIH and NIH privacy breach response policies when handling PII breaches.

v. Provide full access and cooperate on all activities as determined by the Government to ensure an effective incident response, including providing all requested images, log files, and event information to facilitate rapid resolution of sensitive information incidents. This may involve disconnecting the system processing, storing, or transmitting the sensitive information from the Internet or other networks or applying additional security controls.

This may also involve physical access to contractor facilities during a breach/incident investigation within an hour of discovery.

5. Position Sensitivity Designations All Contractor (and/or any subcontractor) employees must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR). The following position sensitivity designation levels apply to this solicitation/contract:

[ ] Tier 5: Critical Sensitive and Special Sensitive National Security, including Top Secret, SCI, and "Q" access eligibility.

[ ] Tier 5SR: Reinvestigation.

[ ] Tier 4: High Risk Public Trust (HRPT).

[ ] Tier 4SR: Reinvestigation.

[ ] Tier 3: Non-Critical Sensitive, National Security, including Secret and "L" access eligibility.

[ ] Tier 3SR: Reinvestigation.

[X] Tier 2S with Subject Interview: Moderate Risk Public Trust (MRPT).

[ ] Tier 2SR: Reinvestigation.

[ ] Tier 1: Low Risk, Non-Sensitive, including HSPD-12 Credentialing.

https://wiki.ocio.nih.gov/wiki/index.php/US-CERT_Federal_Incident_Notification_Guidelines mailto:IRT@mail.nih.gov

6. Homeland Security Presidential Directive (HSPD)-12 The Contractor (and/or any subcontractor) and its employees must comply with Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors; OMB M-05-24; OMB M-19-17; FIPS 201, Personal Identity Verification (PIV) of Federal Employees and Contractors; HHS HSPD-12 policy; and Executive Order 13467, Part 1 §1.2.

For additional information, see HSPD-12 policy at: https://www.dhs.gov/homeland-security-presidential-directive-12

7. Roster

The Contractor (and/or any subcontractor) must submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s). The roster must be submitted to the COR and/or CO within fourteen (14) calendar days of the effective date of this contract. Any revisions to the roster as a result of staffing changes must be submitted within seven (7) calendar days of the change. The COR will notify the Contractor of the appropriate level of investigation required for each staff member. An electronic template, "Roster of Employees Requiring Suitability Investigations," is available for Contractor use at: https://oamp.od.nih.gov/nih-document-generation-system/dgs-workform-information/attachment-files-section-j If the employee is filling a new position, the Contractor must provide a position description and the Government will determine the appropriate suitability level. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.

8. Contract Initiation and Expiration

a. General Security Requirements. The Contractor (and/or any subcontractor) must comply with information security and privacy requirements, Enterprise Performance Life Cycle (EPLC) processes, HHS Enterprise Architecture requirements to ensure information is appropriately protected from initiation to expiration of the contract. All information systems development or enhancement tasks supported by the Contractor must follow the HHS EPLC framework and methodology and in accordance with the HHS Contract Closeout Directive (2018) located at: https://oamp.od.nih.gov/sites/default/files/DGS/contracting-forms/HHS-Closeout-Directive- 2018.pdf . HHS EA requirements are located at: https://www.hhs.gov/web/governance/digital-strategy/it-policy-archive/hhs-policy-for-enterprise-architecture.html and NIH EA requirements are located at: https://ocio.nih.gov/PM/Pages/EPLC.aspx .

b. System Documentation. Contractors (and/or any subcontractors) must follow and adhere to HHS System Development Life Cycle requirements, at a minimum, for system development and provide system documentation at designated intervals (specifically, at the expiration of the contract) within the EPLC that require artifact review and approval.

c. Sanitization of Government Files and Information. As part of contract closeout and at expiration of the contract, the Contractor (and/or any subcontractor) must provide all required documentation in accordance with the NIH Media Sanitization and Disposal Policy to the CO and/or COR to certify that, at the government's direction, all electronic and paper records are appropriately disposed of and all devices and media are sanitized in accordance with NIST SP 800- 88, Guidelines for Media Sanitization.

https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12 https://oamp.od.nih.gov/nih-document-generation-system/dgs-workform-information/attachment-files-section-j https://oamp.od.nih.gov/nih-document-generation-system/dgs-workform-information/attachment-files-section-j https://oamp.od.nih.gov/sites/default/files/DGS/contracting-forms/HHS-Closeout-Directive-2018.pdf https://oamp.od.nih.gov/sites/default/files/DGS/contracting-forms/HHS-Closeout-Directive-2018.pdf https://www.hhs.gov/web/governance/digital-strategy/it-policy-archive/hhs-policy-for-enterprise-architecture.html https://www.hhs.gov/web/governance/digital-strategy/it-policy-archive/hhs-policy-for-enterprise-architecture.html

d. Notification. The Contractor (and/or any subcontractor) must notify the CO and/or COR and system ISSO within fifteen days before an employee stops working under this contract.

e. Contractor Responsibilities upon Physical Completion of the Contract. The Contractor (and/or any subcontractors) must return all government information and IT resources (i.e., government information in non-government-owned systems, media, and backup systems) acquired during the term of this contract to the CO and/or COR. Additionally, the Contractor must provide a certification that all government information has been properly sanitized and purged from Contractor-owned systems, including backup systems and media used during contract performance, in accordance with HHS and/or NIH policies.

f. The Contractor (and/or any subcontractor) must perform and document the actions identified in the NIH Employee Separation Checklist https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Emp-sep-checklist.pdf when an employee terminates work under this contract within 2 days of the employee's exit from the contract. All documentation must be available to the CO and/or COR upon request.

9. Records Management and Retention

a. The Contractor (and/or any subcontractor) must maintain all information in accordance with

Executive Order 13556 -- Controlled Unclassified Information, National Archives and Records Administration (NARA) records retention policies and schedules and HHS Policy for Records Management and NIH policies and must not dispose of any records unless authorized by HHS/NIH.

b. In the event that a contractor (and/or any subcontractor) accidentally disposes of or destroys a record without proper authorization, he/she must document and report the incident in accordance with HHS/ NIH policies.

10. High Value Asset (HVA)

If a system is identified as HVA,[23] the Contractor must comply with the HHS Policy for the High Value Asset (HVA) Program and the DHS HVA Control Overlay[24] in addition to the above requirements.

ARTICLE H. PRIVACY ACT

It has been determined that this contract is subject to the Privacy Act of 1974, because this contract provides for the design, development, or operation of a system of records on individuals.

The System of Records Notice (SORN) that is applicable to this contract is: [ Insert SORN number if one exists. If there is no SORN, indicate that a SORN will be developed ].

The design, development, or operation work the Contractor is to perform is: [ Insert description of design, development, and/or operation work; see definitions in the FAR at 24.101 - Definitions ].

The SORN describing the types of information contained in the records, the legal authority for collecting and maintaining the records, how the records are used within HHS, and the purposes (referred to as "routine uses") for which HHS may disclose the records to non-HHS parties without the individual record subject's consent is found at: https://www.hhs.gov/foia/privacy/sorns/nih-sorns.html.

The Contractor and any Subcontractor must follow disposition to be made of the Privacy Act records upon completion of contract performance shall be in accordance with Section C of the contract, and by direction of the Contracting Officer/Contracting Officer Representative.

https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Emp-sep-checklist.pdf https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Emp-sep-checklist.pdf https://www.hhs.gov/foia/privacy/sorns/nih-sorns.html https://www.hhs.gov/foia/privacy/sorns/nih-sorns.html

ARTICLE H. GOVERNMENT INFORMATION PROCESSED ON GOCO OR COCO SYSTEMS

1. SECURITY REQUIREMENTS FOR GOVERNMENT-OWNED/CONTRACTOR-OPERATED (GOCO )AND

CONTRACTOR-OWNED/CONTRACTOR-OPERATED (COCO) RESOURCES

a. Federal Policies- The Contractor (and/or any subcontractor) shall comply with applicable federal laws that include, but are not limited to, the HHS Information Security and Privacy Policy (IS2P), Federal Information Security Modernization Act (FISMA) of 2014, (44 U.S.C. 101); National Institute of Standards and Technology (NIST) Special Publication (SP) 800-53, Security and Privacy Controls for Federal Information Systems and Organizations; Office of Management and Budget (OMB) Circular A-130, Managing Information as a Strategic Resource; and other applicable federal laws, regulations, NIST guidance, and Departmental policies.

b. Assessment and Authorization (A&A)- A valid authority to operate (ATO) certifies that the Contractor's information system meets the contract's requirements to protect the agency data. If the system under this contract does not have a valid ATO, the Contractor (and/or any subcontractor) shall work with the agency and supply the deliverables required to complete the ATO within the specified timeline(s) within three (3) months after contract award.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .