F-5 Fuel Tanks CDRLs Combined.pdf
PDF 433 KB Posted
- Attached to
- F-5N/F Aircraft 275 Gallon Fuel Tanks
- Solicitation number
- N0042124R0030
About this file
This document is a Contract Data Requirements List (CDRL) that outlines three data items the contractor must provide for a federal contract to produce F-5 275 Gallon Fuel Tanks. The first item is a monthly Integrated Master Schedule capturing production and delivery details. The second item is a monthly status report, and the third is meeting minutes to be provided within 5 days of each meeting. The distribution and submission instructions are provided for each data item.
The related federal contract opportunity is for up to 25 F-5N/F 275 Gallon Fuel Tanks, to be awarded as a Firm Fixed Price, Single Award Indefinite Delivery/Indefinite Quantity contract. The planned ordering period is 28 months. This will be a full and open competition, evaluated based on Lowest Price Technically Acceptable. The proposal submission deadline is May 3, 2024, and questions are due by April 17, 2024. The applicable NAICS code is 336413 with a 1,250 employee size standard, and the PSC is 1680.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0042124R0030 Amendment 0002.pdf | ||
| N0042124R0030 Amendment 0002 Conformed.pdf | ||
| Amendment 0001 RFP QA.pdf | ||
| N0042124R0030 Amendment 0001 Amendment.pdf | ||
| N0042124R0030 Amendment 0001 Conformed.pdf | ||
| Attachment P1 Solicitation Question Form.xlsx | XLSX spreadsheet | |
| N0042124R0030 RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188 OMB Approval Expires 20221130
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
F-5 275 Gallon Fuel Tanks
E. CONTRACT/PR NO.
N00421-24-RFP-PMA-226-0047
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Contractor's Progress and Status Report
3. SUBTITLE
Production Schedule
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81928 (see blk 16)
5. CONTRACT REFERENCE
SECTION C
6. REQUIRING OFFICE
PMA-226
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
Block 16
10. FREQUENCY
MTHLY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A (see blk 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft
Final
Reg Repro
16. REMARKS
Block 4: The Contractor shall generate, maintain, and deliver an Integrated Master Schedule (IMS) to capture the complete production and delivery for all agreed upon fuel tanks. At a minimum, the IMS shall capture tasking for any quality reports or testing requirements, production long-lead items, and delivery. The IMS shall be event-driven and contain complete predecessor and successor logic so that it is capable of calculating the project’s critical path from Contract Award to successful full tank deliveries.
Block 8: Government shall provide comments within ten (10) days of initial submittal. Contractor shall resubmit with corrections within ten (10) days of receiving comments from the Government.
Block 9: DISTRIBUTION STATEMENT C. Distribution authorized to US Government Agencies and their Contractors (Administrative or Operational Use) (11 December 2023). Other requests for this document shall be referred to the Program Specialized And Proven Aircraft Program Office, PMA-226, Building 4033, Cherry Point, NC 28533.
Block 12: Thirty (30) days after contract award
Block 13: Subsequent reports due not later than the 5th of every month.
Block 14: Distribution shall be via Email. Email notification shall be delivered to the addressees listed in Block 16. COR (gina.m.behan.civ@us.navy.mil), F-5 APML (bruce.a.jones.civ@us.navy.mil), F-5 Class Desk (jesse.r.steel.civ@us.navy.mil), F-5 engineering (angel.arzola-gomez.civ@us.navy.mil) and PMA-226 F-5 IPTL (boyd.n.forysthe.civ@us.navy.mil)
PMA-226 1
15.TOTAL
G. PREPARED BY
Gina Behan - PMA226 Program Analyst
BEHAN.GINA.M.1367288791 Digitally signed by BEHAN.GINA.M.1367288791 Date: 2023.12.11 11:05:12 -05'00'
H. DATE I. APPROVED BY
Boyd Forsythe - F-5 IPTL
FORSYTHE.BOYD.N.1041234233 Digitally signed by FORSYTHE.BOYD.N.1041234233 Date: 2023.12.11 14:05:20 -05'00'
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Form Approved OMB No. 0704-0188 OMB Approval Expires 20221130
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
F-5 275 Gallon Fuel Tanks
E. CONTRACT/PR NO.
N00421-24-RFP-PMA-226-0047
A002
CONTRACTOR’S PROGRESS AND STATUS REPORT
3. SUBTITLE
Monthly Status Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81928 (see blk 16)
5. CONTRACT REFERENCE
SECTION C
6. REQUIRING OFFICE
PMA-226
7. DD 250 REQ
LT
MTHLY
12. DATE OF FIRST SUBMISSION
8. APP CODE
A (see blk 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Contractor format acceptable using MS Office tools.
Block 12: Thirty (30) days after contract award
Block 13: Subsequent reports due not later than the 5th of every month.
Block 14: Distribution shall be via Email. Email notification shall be delivered to the addressees listed
Class Desk (jesse.r.steel.civ@us.navy.mil), F-5 engineering (angel.arzola-gomez.civ@us.navy.mil) and
G. PREPARED BY
Gina Behan - PMA226 Program Analyst
BEHAN.GINA.M.1367288791 Digitally signed by BEHAN.GINA.M.1367288791 Date: 2023.12.11 11:01:43 -05'00'
H. DATE I. APPROVED BY
Boyd Forsythe - F-5 IPTL
FORSYTHE.BOYD.N.1041234233 Digitally signed by FORSYTHE.BOYD.N.1041234233 Date: 2023.12.11 14:06:15 -05'00'
Form Approved OMB No. 0704-0188 OMB Approval Expires 20221130
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
F-5 275 Gallon Fuel Tanks
E. CONTRACT/PR NO.
N00421-24-RFP-PMA-226-0047
A003
CONTRACTOR’S PROGRESS AND STATUS REPORT
3. SUBTITLE
Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81928 (see blk 16)
5. CONTRACT REFERENCE
SECTION C
6. REQUIRING OFFICE
PMA-226
7. DD 250 REQ
LT
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
N/A
Reg Repro
16. REMARKS
Block 4: Contractor format acceptable using MS Office tools.
Block 12: Five (5) days after meeting
Block 14: Distribution shall be via Email. Email notification shall be delivered to the addressees listed
Class Desk (jesse.r.steel.civ@us.navy.mil), F-5 engineering (angel.arzola-gomez.civ@us.navy.mil) and
G. PREPARED BY
Gina Behan - PMA226 Program Analyst
BEHAN.GINA.M.1367288791 Digitally signed by BEHAN.GINA.M.1367288791 Date: 2023.12.11 11:01:58 -05'00'
H. DATE I. APPROVED BY
Boyd Forsythe - F-5 IPTL
FORSYTHE.BOYD.N.1041234233 Digitally signed by FORSYTHE.BOYD.N.1041234233 Date: 2023.12.11 14:07:35 -05'00'
File details come from the government source that posted it. Updated .