Extra 300 Statement of Work.pdf
PDF 365 KB Posted
- Attached to
- USNTPS Extra 300 Series Aircraft Flight Hours
- Solicitation number
- 1300902729
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Fill-in Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Encl (1)
Performance Based Statement of Work For U. S. Naval Test Pilot School
USNTPS QUALITATIVE EVALUATION
1.0 Introduction: The U. S. Naval Test Pilot School (USNTPS) is acquiring flight demonstration flight support of its Qualitative Evaluation flight exercise.
2.0 Background: The USNTPS trains engineering flight test pilots and flight test engineers for the Department of Defense, Department of Homeland Security, and international flight test organizations. The Qualitative Evaluation (QE) Program institutionalized within the USNTPS is a major facet of the curriculum that provides a wide variety of aircraft with differing flying qualities and performance characteristics to the students. The training augments and rounds the education received in aircraft that are organic to USNTPS.
3.0 Scope:
3.1. The contractor shall provide up to 18 demonstration flight hours per period in an Extra 300 series aircraft to USNTPS student and instructor personnel to support the U.S. Naval Test Pilot School Qualitative Evaluation Program. Exact number of flight hours during a specific period will be agreed upon between the contractor and QE monitor prior to contract award or utilization of a contract option, not to exceed 18 hours per period. The expected number of flight hours for the base period is 14 hours. The typical flight duration will be planned as 1.0 hour flight time per student/staff member. Flight time will be logged IAW CNAF-3710.7.
3.2. Flight demonstrations shall take place at Naval Air Station (NAS) Patuxent River, MD. The total of up to 18.0 flight hours per period does not include the ferry time required for transporting the aircraft to and from NAS Patuxent River. Ferry time for one flight from the contactor’s location to Patuxent River and a return flight to the contractor’s location per period will be priced at a fixed rate. Travel expenses for the contractor personnel will be costed separately and will be in accordance with (IAW) Joint Travel Regulations.
3.3. Prior to participation in the QE Program at USNTPS, an inspection of the contractor’s equipment, maintenance practices, and flight discipline must be completed. This inspection is conducted by USNTPS staff personnel at the contractor’s place of business or at an agreed-upon location. All discrepancies noted in the inspection must be fixed and documented at the time of proposal submission.
4.0 Applicable Documents. The contractor is responsible for review and adherence to the following applicable documents, as they apply to this contract:
4.1. SECNAVINST 3770.1 Series: Use of Department of the Navy Aviation Facilities by Other Than United States Department of Defense Aircraft
4.2. CNAF-M 3710.7 Series: NATOPS General Flight and Operating Procedures
4.3. UNSTPSINST 3710.2 Series: Visiting Aircraft Standard Operating Procedures
4.4. USNTPSINST 3710.3 Series: Qualitative Evaluation Program
2 Encl (1)
5.0 Period of Performance. The period of performance for this qualitative evaluation is 15 February 2021 – 30 September 2023, with exact flight dates set by the QE Monitor. This period will include a base period and up to 5 six-month option periods.
6.0 Aircraft Requirements.
6.1. At least one fully-operational Extra 300 series aircraft required to complete up to
18.0 hours per period of student/instructor flight demonstration exercises.
6.1.1. Aircraft is to be configured with dual flight controls (capable of being flown from either seat).
6.1.2. The aircraft must meet applicable FAA standards for the appropriate category and class.
6.1.3. Satisfies all scheduled and required maintenance periods such that the aircraft will be available throughout the contracted flight hour period and calendar duration for each demonstration/evaluation period.
6.1.4. Required to operate in day VMC within controlled airspace requiring a Mode 3C transponder and VHF communications.
7.0 Safety Pilot Requirements. A contractor or contractor-approved pilot-in-command (hereafter referred to as the safety pilot) is required. The safety pilot is to be FAA Certified Commercial Pilot rated in the Extra 300 series aircraft. In addition to all applicable Federal Aviation Regulations, the minimum qualifications for the contractor furnished safety pilot are:
7.1. A minimum of 500 flight hours.
7.2. A minimum of 250 flight hours first pilot time in airplanes.
7.3. A minimum of 50 hours in the Extra 300 series, with not less than 5 hours in the Extra 300 series within the previous 60 days prior to flight operations at Patuxent River, MD.
7.4. Must have a current FAA Commercial pilot certificate with current medical qualifications and required aircraft certifications.
7.5. FAA Certified Flight Instructor certificate is desired.
7.6. An initial safety pilot qualification flight and NAS Patuxent River local area familiarization will be completed prior to student flights, these flight are executed concurrent with hours specified in paragraph 6.1 at cost specified in paragraph
9.0. If the safety pilot has flown demonstration flights with USNTPS within the preceding year, the initial safety pilot qualification flight is not required.
8.0 Performance Requirements. During the flights, the flying qualities, performance characteristics and onboard systems will be evaluated throughout the aircraft operating envelope.
The safety pilot shall be in the aircraft for all flights and shall act as the pilot-in-command.
Contractor support services shall include:
8.1. At least one Extra 300 series aircraft as described in paragraph 6.0.
8.2. A thorough briefing for all USNTPS personnel covering aircraft systems, limitations, procedures, and safety.
8.2.1. Contractor shall provide additional briefings if required due to personnel scheduling conflicts.
8.3. A contractor provided safety pilot to act as the pilot-in-command for all flights.
3 Encl (1)
8.3.1. Records of safety pilot(s) to be furnished to USNTPS QE Monitor to include scans or photos of FAA pilot certificate, FAA instructor certificate, medical certificate, and Pilot History Form (attachment 1).
8.4. Maintenance, oil, special equipment, and any other support services associated with the operation of the aircraft (logistics and maintenance support).
8.4.1. The contractor shall comply with Federal regulations for all hazardous material as found in the Code of Federal Regulations (CFR), Title 40, Parts 260-265, 270, 300 and state regulations for hazardous wastes found in the Code of Maryland Regulations (COMAR), Title 10, Subtitle 26. The contractor shall be responsible for transportation, accumulation, and turn-in of regulated and hazardous waste, waste oils/fuels if not previously agreed to. Material safety data sheets for all hazardous materials brought on station will be mailed to USNTPS, Hazardous Waste Program Manager, Code 55TP91A, at least two weeks prior to arrival.
8.5. Any flight gear specific to the aircraft type.
8.6. Access to the aircraft and associated maintenance records and logs for inspection by USNTPS during the period of performance.
8.6.1. Provide scans or photos of aircraft’s maintenance logs, registration, FAA
Airworthiness certificate, and Operating Limitations (if applicable) to USNTPS QE Monitor.
8.7. Demonstration flight(s) for each USNTPS student/staff member not to exceed 1.0 flight hour per member and not to exceed total flight hours as stated in paragraph 3.0.
9.0 During demonstration flights, USNTPS will pay the ‘dry” flight hour rate for actual flight time. Actual flight time for reporting purposes is defined in CNAF-M 3710.7 Series. The “dry” rate includes all costs for the airplane usage and maintenance. Daily rates for pilots and maintenance personnel (if applicable) will be costed separately. USNTPS will provide fuel during the demonstration flight only. Flight hour costs for the ferry time to NAS Patuxent River will be based on contractor provided fuel. USNTPS will provide fuel for the first leg of the ferry flight from NAS Patuxent River after contract actions are completed. USNTPS will provide hangar and flight line space for the duration of the demonstration flight period. In the event the aircraft requires extended maintenance, hangar space will be provided for up to two additional weeks. It remains the responsibility of the contractor to provide the maintenance of the aircraft.
Government provided maintenance personnel will assist with aircraft movement into and out of the hangar. At the discretion of the USNTPS Maintenance Officer, limited maintenance assistance may be provided for routine maintenance tasks; however, USNTPS will not be held liable for their actions.
10.0 The contractor maintains liability for any damage or loss of the aircraft and third party liability.
10.1. Current insurance, permitting requirements, and necessary forms are defined by
SECNAVINST 3770.1 Series. Requirements and forms can be obtained via the following website:
http://www.navfac.navy.mil/products_and_services/am/products_and_services/af l/getting_started.html
10.2. Note that when DD Form 2400 states a Combined Single Limit amount and then follows it with the phrase "sublimited to $100,000 per passenger", the stated
4 Encl (1) amount (e.g. $1,000,000) is the total coverage and the $100,000 per passenger is within the $1,000,000, not in addition to it. This would mean that the coverage would not meet the minimum requirement. As an example, for a small aircraft with 3 passenger seats, the minimum is $500,000 bodily injury plus $500,000 property damage plus $300,000 for passenger seats, for a total of $1,300,000.
Bodily Injury
PLUS
Property Damage
PLUS
Per
Passenger Seat
Minimum
Aircraft less than 12,500 lbs MGTOW
$500,000 PLUS $500,000 PLUS $100,000
$1,000,000 PLUS
$100,000 per passenger seat
Aircraft 12,500 lbs and greater
MGTOW
$1,000,000 PLUS $1,000,000 PLUS $100,000
$2,000,000 PLUS
$100,000 per passenger seat (1)
(1) A percentage reduction applies
10.3 Minimum insurance requirements and landing permits must be received and verified prior to transit to and landing at NAS Patuxent River. Either mail, fax, or e-mail blue - ink signed copies of insurance certifications and civil aircraft landing permit applications to:
Qual/Eval Program Monitor
USNTPS
22783 Cedar Point Rd.
Patuxent River, MD 20670
(V) (301) 757-5041
(F) (301) 342-5003 Derek.marchlewicz@navy.mil (Or the current QE Monitor, which can be found by calling the phone number listed above)
10.3.1 The following is a list of required documents to attain a civil landing permit:
1) DD2400, Civil Aircraft Certificate of Insurance
2) DD2401, Civil Aircraft Landing Permit Application
3) DD2402, Civil Aircraft Hold Harmless
4) LLC Affidavit (if applicable)
10.4 Once all required safety pilot, aircraft, and landing permit documents have been submitted and confirmed, USNTPS Flight Operations will issue the Prior Permission Required authorization number to the contractor. For PPR questions, contact TPS operations at:
US Naval Test Pilot School Operations Ms. Crystal Brensinger
(V) (301) 757-5040
(F) (301) 342-5940 Crystal.bresinger@navy.mil
5 Encl (1)
10.5 The USNTPS Fixed Wing QE Program Manager is:
Lt Col Derek Marchlewicz
(W) (301) 757-5026 Derek.marchlewicz@navy.mil
11.0 Standards of Quality and Timeliness
PBSOW
Paragraph Performance
Objective Performance
Standard Acceptable Quality
Level Method of
Surveillance
8.1 Flight Briefings Thorough 1 hr briefing
covering aircraft systems limitations, procedures and safety.
Thorough briefing provided to government aircrew prior to flight demonstration.
Government Observation & Analysis
8.2 Safety Pilot
provided to act as Pilot-in-Command
Safety Pilot must meet minimum qualifications as specified in Paragraph 7.0.
Safety Pilot meets 100% of requirements.
Government Observation & Analysis of applicable documents
8.3 Maintenance, oil, special equipment, and other support services
All services required to maintain aircraft to execute the flight demonstrations.
100% of services provided
Government Observation & Analysis
8.4 Provide any flight
gear specific to the aircraft type
All required flight gear provided.
100% of gear provided
Government Observation & Analysis
8.5 Fully Operational
Extra 300 series aircraft
Provided aircraft must meet applicable FAA standards for the appropriate category and class, and as stated in paragraph 6.0.
Aircraft meets 100% of applicable FAA standards.
Government Observation & Analysis
8.6 Maintenance Logs
and Inspections
Accessibility for USNTPS to review aircraft logs, maintenance records, and perform an aircraft inspection (as required).
Full compliance Government Observation & Analysis
8.7 Demonstration
Flight Hours
Provide flight hours as specified in paragraph 3.0.
Flight hours provided.
Government Observation & Analysis
11.0 Contract Line Item Number (CLIN) Description:
11.1. CLIN 1 (Ferry Flight): The contractor will ensure the aircraft is on station and ready for all flight events. One ferry flight round-trip from the aircraft home station to NAS Patuxent River, MD is expected per performance period. The aircraft is expected to remain on station during the entire performance period until all flight hours are complete. Prior coordination with the QE monitor is required to fly the aircraft off station during the performance period (i.e. a weekend
6 Encl (1) airshow). Any aircraft relocation that does not support USNTPS will not accrue an additional ferry flight.
11.2. CLIN 2 (Flight Hours): “Dry” flight hour rate, including all costs for aircraft operation and maintenance. The expected sortie duration will be 1 hour per member, for a total of up to 18.0 hours per performance period. Sortie completion determination will be the responsibility of the QE monitor. If a sortie does not meet the training objectives due to an aircraft failure or non-performance of the safety pilot, the hours for that flight will not be accrued towards the total contract. If a sortie does not meet training objectives because it returned early due to a weather recall initiated by the USNTPS, then any hours completed will be accrued. Flight hours will be calculated in accordance with CNAF-M 3710.7 (takeoff to landing, plus 5 minutes) as entered in FIST post flight and will be billed in increments of 0.1 hour.
11.3. CLIN 3 (Pilot Days): Covers daily cost of the safety pilot(s) while supporting the
QE program at NAS Patuxent River. In order to receive credit for pilot days, the contractor shall provide at least one safety pilot with the ability to instruct students and staff in ground and flight operations. One pilot day will be accrued for any day in which a safety pilot is on time and ready to complete the event up to the maximum budgeted amount.
11.4. CLIN 4 (Maintainer Days): Covers daily cost of the aircraft maintainer while supporting the QE program at NAS Patuxent River. In order to receive credit for maintainer days, the contractor shall provide at least one maintainer fully capable of maintaining the aircraft in a condition in which the Qual/Eval mission can be completed. One maintainer day will be accrued for any day in which a maintainer is on time and ready to carry out his/her duties up to the maximum budgeted amount.
11.5. CLIN 5 (Travel): Travel expenses cover the cost of lodging, rental vehicles, and per diem IAW Joint Travel Regulations. Travel expenses will be charged for up to one day prior to the first scheduled flight to one day after the last flight is completed.
File details come from the government source that posted it. Updated .