This draft request for proposal from the U.S. Army seeks to install an additional Digital Air Ground Integration Range at Fort Knox, Kentucky. Key features to be provided include IT equipment utilizing the Digital Range Training System Live Training Transformation software, an After Action Review system, vehicle and dismounted player units, and a radio communication system. The anticipated award date is the fourth quarter of fiscal year 2022. Questions regarding the draft RFP are due by May 6, 2022.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SFAE-STRI-PMST-LTS
6. REQUIRING OFFICE
SOW PARA 3.2
5. CONTRACT REFERENCE
DI-MGMT-81928
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
CPSMR
CONTRACTORS PROGRESS AND STATUS REPORT
2. TITLE OF THE DATA ITEM
A001
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-22-D-XXXX Knox
E. CONTRACT/PR NO.
DRTS
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBIT
A. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13. DATE OF SUBSEQUENT
SUBMISSION
See block 16
11. AS OF DATE
12. DATE OF FIRST
MNTHLY
10. FREQUENCY
Repro Reg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
08-DEC-2021
J. DATE
Todd, James
I. APPROVED BY
29-SEP-2021
H. DATE
G. PREPARED BY
Steib, Nicole
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) TO THE TECHNICAL OFFICE
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
3. BLOCK 12: SHALL BE DUE 15 CALENDAR DAYS AFTER THE END OF THE
CONTRACTORS SECOND FULL ACCOUNTING MONTH FOLLOWING AWARD.
4. BLOCK 13: SHALL BE DUE 15 CALENDAR DAYS AFTER THE END OF THE
CONTRACTOR'S ACCOUNTING MONTH THROUGH THE LIFE OF THE CONTRACT.
5. THE GOVERNMENT WILL HAVE 10 CALENDAR DAYS TO ACCEPT/REJECT EACH
SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO RESPOND TO THE
GOVERNMENT'S COMMENTS AND RESUBMIT.
16. REMARKS
1 DRTS APM
1 0 0 15. TOTAL
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.2.3
DI-MGMT-81861A
Integrated Program Management Report (IPMR)
A002
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
MNTHLY
01-OCT-2021
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
3. BLOCK 12: SHALL BE DUE 15 CALENDAR DAYS AFTER THE END OF THE
CONTRACTORS SECOND FULL ACCOUNTING MONTH FOLLOWING AWARD.
4. BLOCK 13: SHALL BE DUE 15 CALENDAR DAYS AFTER THE END OF THE
CONTRACTOR'S ACCOUNTING MONTH THROUGH THE LIFE OF THE CONTRACT.
5. THE GOVERNMENT SHALL HAVE 10 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF THE SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
8. THE SCHEDULE SHALL INCLUDE, AT A MINIMUM, THE FOLLOWING MILESTONES:
- COMPLETION OF MATERIAL ORDERING
- MATERIALS RECEIVED
- START OF IN-HOUSE ASSEMBLY
- START OF ON-SITE INTEGRATION
- COMPLETION OF INSTALLATION
- TEST READINESS REVIEW
- START OF SYSTEM OPERATIONAL TEST
- NEW EQUIPMENT TRAINING
- COMPLETION OF TRANSITION PERIOD
- COMPLETION OF DOCUMENTATION
- PERIOD OF PERFORMANCE
9. TAILOR DI-MGMT-81861A AS FOLLOWS: CONTENT SHALL BE IN ACCORDANCE
WITH FORMAT 6.
1 0 0 15. TOTAL
Page 2 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.2.4
DI-FACR-80966
Site Survey Report
Trainer Facilities Report (TFR)
A003
TM OTHER FACR
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
SEE BLOCK 16
1TIME/R
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 13 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
3. BLOCK 12: SHALL BE DUE 15 CALENDAR DAYS AFTER THE COMPLETION OF
EACH SITE SURVEY.
4. BLOCK 13: REVISIONS, AS REQUIRED, THROUGH THE LIFE OF THE CONTRACT.
5. THE GOVERNMENT SHALL HAVE 14 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH TFR SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
8. TAILOR DID TO INCLUDE THE FOLLOWING CONTENT:
A. Title page. The title page shall contain the following information:
I) Title.
II) Contract data requirements list (CDRL) data item number.
III) Site name.
IV) Identification of project.
V) Contract number.
VI) Date.
B. Table of Contents. The Table of Contents shall identify all paragraphs and the corresponding page number.
C. Introduction. The Introduction shall contain the following information:
I) Purpose.
II) Location.
III) Dates of survey.
IV) Personnel in attendance.
D. Results. The Results section shall be the main body of the report. It shall
1 DRTS LOG
1 DRTS LEAD ENG
3 0 0 15. TOTAL See continuation sheet...
Page 3 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
16. REMARKS (Continued) include a summary of all anticipated minor construction required, document any required changes to the system baseline, and document any findings with regards to cabling, power connections, target pit preparations, and any other tasks required to support the transition of the range into the final configuration. This section shall fully document and explain any other findings concerning on-site conditions.
E. Conclusions and recommendations. This section shall summarize the results of the survey and present conclusions. The conclusion shall also identify any discrepancies between the contract and survey results. This section shall contain any recommendations that contractor has based on the survey. Any actions required from the Government by the contractor shall be noted here.
TM OTHER FACR
Page 4 of 35 Pages DD FORM 1423-1, FEB 2001
SOW PARA 3.2.8
DI-SESS-80640D
Request for Variance (RFV)
A004
TM OTHER SESS
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
A
ASREQ
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER SUBMITTING
THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS
REQUIRED FOR EVERY DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT
SUBMISSIONS) TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES AND CHARTS SHALL READABLE USING
MICROSOFT OFFICE 2013. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY MAILED OR
DELIVERED VIA DOD SAFE (URL: SAFE.APPS.MIL) TO THE APM.
2. BLOCK 8: GOVERNMENT APPROVAL IS REQUIRED VIA CONFIGURATION
CONTROL BOARD (CCB) PRIOR TO ANY VARIATION BEING IMPLEMENTED.
3. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 13 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
4. BLOCK 12: SHALL BE DUE SUBMITTED WITHIN 14 CALENDAR DAYS OF
DETERMINATION OF NEED.
5. BLOCK 13: SUBSEQUENT SUBMISSIONS, AS REQUIRED, THROUGH THE LIFE
OF THE CONTRACT.
6. THE GOVERNMENT SHALL HAVE 60 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
7. THE CONTRACTOR SHALL HAVE 14 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
8. CONTRACTOR FORMAT IS ACCEPTABLE. THE RFV SHALL CONTAIN ALL THE
INFORMATION IN DD FORM 1694.
3 0 0 15. TOTAL
Page 5 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SFAE-STRI-ST-LTS
SOW PARA 3.3.1
DI-MGMT-81024
SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP)
A005
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
30-SEP-2021
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
3. BLOCK 12: SHALL BE DUE 60 CALENDAR DAYS AFTER CONTRACT AWARD.
4. BLOCK 13: REVISIONS AS REQUIRED THROUGH LIFE OF THE CONTRACT.
5. THE GOVERNMENT WILL HAVE 10 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 5 CALENDAR DAYS TO INCORPORATE GOVERNMENT
COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
2 0 0 15. TOTAL
Page 6 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.3.1
DI-MGMT-82133
See Block 16
A006
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
2TIME/R
Block 2: REQUIREMENTS TRACEABILITY VERIFICATION MATRIX (RTVM)
REPORT IN WIDE AREA WORKFLOW (WAWF) TO THE TECHNICAL OFFICE
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
3. BLOCK 12: SHALL BE DUE 60 CALENDAR DAYS AFTER CONTRACT AWARD.
4. BLOCK 13: SECOND SUBMISSION SHALL BE DUE 30 CALENDAR DAYS PRIOR
TO THE START OF IN-PLANT TESTING. REVISIONS, AS REQUIRED,
THROUGHOUT THE LIFE OF THE CONTRACT.
5. THE GOVERNMENT WILL HAVE 20 CALENDAR DAYS TO REVIEW AND ACCEPT OR
REJECT EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
Page 7 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.3.3
DI-IPSC-81432A
System/Subsystem Design Description (SSDD)
A007
TM OTHER IPSC
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
1TIME
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
3. BLOCK 12: SHALL BE DUE 14 CALENDAR DAYS PRIOR TO TECHNICAL DESIGN
REVIEW (TDR).
4. THE GOVERNMENT SHALL HAVE 20 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF THE SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
6. CONTRACTOR FORMAT IS ACCEPTABLE.
Page 8 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.3.4
DI-IPSC-81442A
Software Version Description (SVD)
A008
TM OTHER IPSC
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
3. BLOCK 12: SHALL BE DUE 14 CALENDAR DAYS AFTER SYSTEM OPERATIONAL
TEST. FINAL SVD SHALL REPRESENT THE "SITE FIELDING" SW
CONFIGURATION OF THE SYSTEM.
4. THE GOVERNMENT SHALL HAVE 20 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF THE SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 14 CALENDAR DAYS TO INCORPORATE COMMENTS.
Page 9 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.3.4
DI-MCCR-80700
Computer Software Product End Items
A009
TM OTHER MCCR
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
3. BLOCK 12: SHALL BE DUE 14 CALENDAR DAYS AFTER SYSTEM OPERATIONAL
TEST. FINAL COMPUTER SOFTWARE PRODUCT END ITEMS SHALL REPRESENT
THE "SITE FIELDING" SW CONFIGURATION.
4. THE COMPUTER SOFTWARE PRODUCT END ITEMS SHALL CONSIST OF ALL
DOCUMENTATION, SOURCE CODE, OBJECT, SITE SPECIFIC DATA AND
EXECUTABLE PRODUCTS AND AFFILIATED SOFTWARE MODULES.
ANY COTS SOFTWARE SHALL BE DELIVERED IN ITS NATIVE MEDIA.
5. THE GOVERNMENT SHALL HAVE 20 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF THE SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 14 CALENDAR DAYS TO INCORPORATE COMMENTS.
Page 10 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.3.6.1
DI-MISC-80711A
RF Coverage
Scientific and Technical Reports
A010
TM OTHER MISC
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-TRADE, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
3. BLOCK 12: SHALL BE DUE 15 CALENDAR DAYS PRIOR TO THE TECHNICAL DESIGN
REVIEW.
4. THE GOVERNMENT WILL HAVE 10 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
Page 11 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.3.8
DI-QCIC-81794
QUALITY ASSURANCE PROGRAM PLAN
A011
TM OTHER QCIC
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-TRADE, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
3. BLOCK 12: SHALL BE DUE 60 CALENDAR DAYS AFTER CONTRACT AWARD.
4. BLOCK 13: REVISIONS SHALL BE DUE, AS REQUIRED, THROUGH THE LIFE
OF THE CONTRACT.
5. THE GOVERNMENT WILL HAVE 20 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
Page 12 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.3.9
DI-SESS-80639D
Engineering Change Proposal (ECP)
A012
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
ASREQ
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
3. BLOCK 12: SHALL BE DUE 20 CALENDAR DAYS AFTER IDENTIFYING A
CHANGE TO ANY ESTABLISHED BASELINE.
4. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE, AS REQUIRED,
THROUGH THE LIFE OF THE CONTRACT.
5. THE GOVERNMENT SHALL HAVE 30 CALENDAR DAYS FOR REVIEW AND
APPROVAL OR REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
Page 13 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.3.10
DI-SAFT-80102C
SAFETY ASSESSMENT REPORT
A013
TM OTHER SAFT
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO THE START
OF ANY TESTING. GOVERNMENT RE-APPROVAL WILL BE REQUIRED PRIOR TO
THE START OF ANY TESTING FOLLOWING ANY CHANGE TO THE TECHNICAL BASELINE.
3. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
4. BLOCK 12: SHALL BE DUE 14 CALENDAR DAYS AFTER COMPLETION OF THE
TECHNICAL DESIGN REVIEW.
5. BLOCK 13: REVISIONS AS REQUIRED THROUGH THE LIFE OF THE CONTRACT.
7. THE SAFETY ASSESSMENT REPORT SHALL HAVE A COMPREHENSIVE SAFETY
ASSESSMENT, RISK HAZARDS ANALYSIS AND RISK MITIGATION DUE TO
ENVIRONMENTAL HEALTH HAZARDS, HUMAN FACTORS ENGINEERING, AND
SYSTEM SAFETY DESIGN.
6. THE GOVERNMENT WILL HAVE 20 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
7. THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
8. CONTRACTOR FORMAT IS ACCEPTABLE.
Page 14 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.3.10
DI-SAFT-80106C
HEALTH HAZARD ASSESSMENT REPORT (HHAR)
A014
TM OTHER SAFT
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO THE
START OF ANY TESTING.
3. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
4. BLOCK 12: SHALL BE DUE 14 CALENDAR DAYS AFTER COMPLETION OF THE
TECHNICAL DESIGN REVIEW.
5. THE GOVERNMENT WILL HAVE 20 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION.
6. THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
Page 15 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.3.11
Technical Design Review (TDR)
A015
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
3. BLOCK 12: SUBMISSION SHALL BE DUE 15 CALENDAR DAYS PRIOR TO THE
TECHNICAL DESIGN REVIEW.
4. THE GOVERNMENT WILL HAVE 5 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR WILL HAVE 5 CALENDAR DAYS TO INCORPORATE GOVERNMENT
COMMENTS.
Page 16 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.4
DI-NDTI-80566A
Test Plan
A016
TM OTHER NDTI
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 8: GOVERNMENT APPROVAL IS REQUIRED 30 CALENDAR DAYS PRIOR
TO THE START OF IN-PLANT TESTING.
3. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
4. BLOCK 12: SUBMISSION DUE 20 CALENDAR DAYS AFTER COMPLETION OF THE
TECHNICAL DESIGN REVIEW.
5. BLOCK 13: REVISIONS AS REQUIRED THROUH THE LIFE OF THE CONTRACT.
6. THE GOVERNMENT WILL HAVE 20 CALENDAR DAYS TO REVIEW AND ACCEPT OR
REJECT EACH SUBMISSION.
7. THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE
GOVERNMENT COMMENTS.
8. CONTRACTOR FORMAT IS ACCEPTABLE.
Page 17 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.4.4 & 3.4.5
DI-NDTI-80603A
Test Procedure
A017
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
3TIME/R
30-NOV-2021
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO THE
START OF TESTING.
3. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 11 MAY 2020.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S. ARMY
PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND
INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-PMST-LTS, 12211
SCIENCE DR., ORLANDO, FL 32826-3224.
4. BLOCK 12: COMPREHENSIVE TEST PRODCEDURE DRAFT DUE 45 CALENDAR
DAYS PRIOR TO TRR FOR IN-PLANT TESTING.
5. BLOCK 13: SECOND SUBMISSION DUE 30 CALENDAR DAYS PRIOR TO TRR FOR
SYSTEM TECHNICAL TEST. FINAL SUBMISSION DUE 30 CALENDAR DAYS PRIOR
TO TRR FOR SYSTEM OPERATIONAL TEST. REVISIONS, AS REQUIRED,
THROUGH THE LIFE OF THE CONTRACT.
6. CONTRACTOR FORMAT IS NOT ACCEPTABLE. THE CONTRACTOR SHALL USE
THE GOVERNMENT PROVIDED TEST PROCEDURE TEMPLATE IN LIEU OF THE DID FORMAT.
7. THE GOVERNMENT WILL HAVE 20 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE GOVERMENT
COMMENTS.
Page 18 of 35 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001
SOW PARA 3.4.4 & 3.4.5
DI-NDTI-80809B
Test/Inspection Report
A018
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the
2TIME/R
30-NOV-2021
RESPONSIBLE FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6,
AND AS DELINEATED BY BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO
CREATE FIGURES, TABLES AND CHARTS SHALL BE READABLE USING
MICROSOFT OFFICE 2016. IF, DUE TO FILE SIZE, THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF, A COVER PAGE SHALL BE SUBMITTED VIA
WAWF AND THE DELIVERABLE SHALL BE ELECTRONICALLY DELIVERED VIA DOD
SAFE (HTTPS://SAFE.APPS.MIL) TO THE TECHNICAL OFFICE RESPONSIBLE
FOR THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, AND AS
DELINEATED BY BLOCK 14. THE CONTRACTOR WILL NEED TO REQUEST A
DROP-OFF VIA DOD SAFE FOR EACH DELIVERABLE THAT THE CONTRACTOR IS
UNABLE TO SUBMIT VIA WAWF.
2. BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO
ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .