Exhibit R Master TICS Table.xlsx
XLSX spreadsheet 433 KB Posted
- Attached to
- X1DB--Coldwater CBOC
- Solicitation number
- 36C25023R0104
About this file
This document contains a Tenant Improvements Cost Summary (TICS) template for estimating construction costs for a federal facility project located in Bloomington, Indiana.
The TICS template requires information on the project such as agency, location, and ABOA square footage. It includes cost estimates in 32 construction divisions for both tenant improvement (TI) and shell costs. TI costs cover finishes and fixtures to make a warm shell into usable space. Shell costs cover base building elements. The template auto-populates totals and costs per square foot from the input division estimates. It also includes instructions on using the template and defining shell work. A related federal contract opportunity is for solicitation number 36C25023R0104 for a Coldwater CBOC project with the Department of Veterans Affairs. No further details are provided on products or services required for that opportunity.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TICS
| TENANT IMPROVEMENTS COST SUMMARY (TICS) | ||||
| for | 36C25023R0004 | ABOA SF= | - 0 | |
| Agency: | VHA 583 | TIA PER ABOA SF= | $ - 0 | |
| December 31, 1899 | Location: | Bloomington, IN | TOTAL TIA | $ - 0 |
| RU Factor | ERROR:#DIV/0! | RSF= | - 0 | |
| Masterformat CSI | System Elements | TI* | SHELL** | |
| Div 1 | General Requirements | $ - 0 | $ - 0 | |
| Div 2 | Site work & Demolition | $ - 0 | $ - 0 | |
| Div 3 | Concrete | $ - 0 | $ - 0 | |
| Div 4 | Foundations / Masonry | $ - 0 | $ - 0 | |
| Div 5 | Metals | $ - 0 | $ - 0 | |
| Div 6 | Woods & Plastics | $ - 0 | $ - 0 | |
| Div 7 | Thermal & Moisture | $ - 0 | $ - 0 | |
| Div 8 | Doors & Windows | $ - 0 | $ - 0 | |
| Div 9 | Finishes | $ - 0 | $ - 0 | |
| Div 10 | Specialties | $ - 0 | $ - 0 | |
| Div 11 | Equipment | $ - 0 | $ - 0 | |
| Div 12 | Furnishings | $ - 0 | $ - 0 | |
| Div 13 | Special Construction | $ - 0 | $ - 0 | |
| Div 15 | General Construction | $ - 0 | $ - 0 | |
| Div 21 | Fire Suppression | $ - 0 | $ - 0 | |
| Div 22 | Plumbing | $ - 0 | $ - 0 | |
| Div 23 | HVAC | $ - 0 | $ - 0 | |
| Div 26.1 | Electrical | $ - 0 | $ - 0 | |
| Div 26.2 | Lighting | $ - 0 | $ - 0 | |
| Div 27 | Communications, Security & Other Elec. Systems | $ - 0 | $ - 0 | |
| Div 28.1 | Electrical safety & Security | $ - 0 | $ - 0 | |
| Div 28.2 | Security | $ - 0 | $ - 0 | |
| Div 32 | Exterior | $ - 0 | $ - 0 | |
| Subtotal | Trade Costs | $ - 0 | $ - 0 | |
| General Contractor Fee | Percent | $ - 0 | $ - 0 | |
| Subtotal | Construction Costs | $ - 0 | $ - 0 | |
| Architectural & Engineering Fees (NIC DID costs) | lump sum | $ - 0 | $ - 0 | |
| Other Lessor Costs Established Under the Lease | $ - 0 | $ - 0 | ||
| Subtotal | Lessor's Costs: | $ - 0 | $ - 0 | |
| Lessor's Project Management Fee | Percent | $ - 0 | ||
| Total | Price to Government: | GRAND TOTAL | $ - 0 | |
| Cost per ABOA SF | ERROR:#DIV/0! | ERROR:#DIV/0! | ||
| Notes: | Cost per RSF | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| * | Include all subcontractors' costs. | |||
| ** | Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the SHELL DEFINITIONS tab, and the lease for further information. |
&"Arial,Bold"
Page &P
Impact
HIGH IMPACT PERCENTAGE COST ANALYSIS
| Cost Impact Description | Calculation | |
| Approximate | Resulting | |
| % Impact | Cost Impact | |
| Structure | ERROR:#REF! | |
| Structural Upgrades | 33.0% | ERROR:#REF! |
| foundation work | ERROR:#REF! | |
| New Constr Additions (e.g.In-fill) | ERROR:#REF! | |
| Exterior | ERROR:#REF! | |
| Façade Upgrade & Reconditioning | ERROR:#REF! | |
| Window repair | ERROR:#REF! | |
| Window replacement | ERROR:#REF! | |
| Roof | ERROR:#REF! | |
| Repair | ERROR:#REF! | |
| Replacement | ERROR:#REF! | |
| Interior | ERROR:#REF! | |
| Vacant space recapture | ERROR:#REF! | |
| Lobby upgrades | ERROR:#REF! | |
| Tenant Fitout | ERROR:#REF! | |
| Common Areas/lobbies | ERROR:#REF! | |
| Elevator | ERROR:#REF! | |
| Shaft Upgrades | ERROR:#REF! | |
| Machinery | ERROR:#REF! | |
| Cabs | ERROR:#REF! | |
| Plumbing | ERROR:#REF! | |
| Central Equipment | 10.0% | ERROR:#REF! |
| Piping | ERROR:#REF! | |
| Fixtures | ERROR:#REF! | |
| HVAC | ERROR:#REF! | |
| Upgrades (Chillers, Boilers, Air Handlers) | 10.0% | ERROR:#REF! |
| Replacements | ERROR:#REF! | |
| Ductwork | ERROR:#REF! | |
| Piping systems | ERROR:#REF! | |
| Electrical | ERROR:#REF! | |
| Transformers | ERROR:#REF! | |
| Switchgear | ERROR:#REF! | |
| Panels | ERROR:#REF! | |
| Bus duct & Wiring | ERROR:#REF! | |
| Fire Protection | ERROR:#REF! | |
| sprinklers | 5.0% | ERROR:#REF! |
| alarm/detection | ERROR:#REF! | |
| Standpipe | ERROR:#REF! | |
| Sitework | ERROR:#REF! | |
| Roadways | ERROR:#REF! | |
| Parking repairs/upgrades | ERROR:#REF! | |
| Plaza repairs/upgrades | ERROR:#REF! | |
| Historic Restoration | 5.0% | ERROR:#REF! |
| Security/Blast/Glass Frag. | ERROR:#REF! | |
| ADA | 10.0% | ERROR:#REF! |
| Seismic | ERROR:#REF! | |
| Energy | ERROR:#REF! | |
| Hazmat | 7.0% | ERROR:#REF! |
| Asbestos | 20.0% | ERROR:#REF! |
| Lead | ERROR:#REF! | |
| PCB's | ERROR:#REF! | |
| Other Special Requirements | ERROR:#REF! | |
| Balance Not Accounted for >>> | ERROR:#REF! | ERROR:#REF! |
| ECCA | 100.0% | ERROR:#REF! |
Class
PROJECT CLASSIFICATION
| The following cost assignments proportion estimated total project costs to reflect |
| project focus and character. Entries are based upon the primary purpose behind |
| work item development. |
CATEGORY COST
1. General Repair $0.00
2. FireSafety
3. Asbestos
4. Seismic Safety
5. Historic Preservation
6. Accessibility
7. Courts Space
8. Energy Conservation
Estimated Total Project Cost: $0.00
| Date Prepared: | |
| ERROR:#REF! | ERROR:#REF! |
Code
| New Construction | 2 |
| Repair and Alterations |
INPUT PROJECT INFO
| INFORMATION NEEDED TO COMPLETE TICS TABLE | FALSE | ||
| TRUE | |||
| LEASE GS-XXX-XXXXX or Project | 36C25023R0004 | FALSE | |
| Agency | VHA 583 | TRUE | |
| Location: City, State | Bloomington, IN | TRUE | |
| FALSE | |||
| ABOA SF = | General contractor fee, A/E Fee and Lessor's Project Management Fee fields are structured to allow you to choose percentage or a lump sum. | ||
| TENANT IMPROVEMENT ALLOWANCE PER ABOA SF = | |||
| RSF= | |||
| DATE: |
| Tenant Improvement General Contractor Fee | percent | ||
| Shell General Contractor Fee | percent | ||
| Tenant Improvement A/E Fees (per Lease) | lump sum | For A/E fees established as a cost per ABOA sf, convert rate to lump sum. | |
| Shell A/E Fees | lump sum | ||
| Lessor's TI Project Management Fee (per Lease) | percent | percent | |
| Other Lessor Costs Established Under the Lease | lump sum |
TI Shell
TOTAL $ - 0 $ - 0
INSTRUCTIONS
INSTRUCTIONS
Read and understand SHELL DEFINITION tab.
Input project specific information as appropriate in the INPUT PROJECT INFO worksheet, in order to auto-populate the TICS worksheet. This includes ANSI-BOMA Office Area (ABOA) square footage, General Contractor Fee, Lessor's Project Management Fee, and A/E Fees. Note that some of these fees are already established under the lease agreement and must be used when completing this worksheet.
Fill in each line for all Shell and TI items in the corresponding division tabs included in the Tenant Improvement Cost Summary (TICS). Include all subcontractors' soft costs. Example shown below.
| Material | |
| Description Accurately describe each item being priced. | |
| Quantity List the quantity e.g., 1,2, 3, etc. | |
| Unit (Example) LS,EA,GAL,LF, SF, etc. | |
| Cost Amount | |
| Total Total cost of all material. | |
| Labor | |
| Hours | Time projected to perform the task. |
| Labor Rate | Cost per hour of labor. |
| Total Cost of labor. | |
| TOTAL Combines overall materials and labor. | |
| Shell |
1. Fill out light green fields titled (SHELL), inputting only cost associated with shell as defined in the SHELL DEFINITION'S tab.
2. Fill each division tab 1-32 as needed for the construction to be preformed under the (SHELL) cost as indicated above.
Tenant Improvements (TI)
TIs include the finishes and fixtures that take space from the shell condition to a finished, usable condition.
1. Fill out fields titled (TI), inputting only costs associated with (TI).
2. Fill each division tab 1-32 as needed for the construction to be performed under the (TI) costs as indicated above.
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | January 0, 1900 | ||||||
| DIVISION 9 - FINISHES (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| XYZ Paint | 1 | GAL. | $25.00 | $25.00 | 2.5 | $36.25 | $90.63 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| Total | $25.00 | Total | $90.63 | ||||
| TOTAL | $115.63 | ||||||
| DIVISION 9 - FINISHES (SHELL) | |||||||
| ABC Paint | 10 | GAL. | $27.00 | $270.00 | 6.0 | $36.25 | $217.50 |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| Total | $270.00 | Total | $217.50 | ||||
| TOTAL | $487.50 |
SHELL DEFINITIONS
Per GSA Pricing Desk Guide, 4th Edition.
GSA Pricing Desk Guide's reference to minimum power distribution of 7 watts per USF is outdated; lease requirement is minimum of 4 watts per ABOA SF
COST SUMMARY
| CONSTRUCTION COST ESTIMATE | Materials | ||
| TI | Shell | ||
| DIVISION 1 GENERAL REQUIREMENTS | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 2 SITE WORK AND DEMOLITION | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 3 CONCRETE | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 4 MASONRY | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 5 METALS | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 6 WOOD AND PLASTICS | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 7 THERMAL & MOISTURE | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 8 DOORS AND WINDOWS | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 9 FINISHES | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 10 SPECIALTIES | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 11 EQUIPMENT | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 12 FURNISHINGS & EQUIPMENT | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 13 SPECIAL CONSTRUCTION | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 15 GEN CONSTRUCTION | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 21 FIRE SUPPRESSION SYSTEMS | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 22 PLUMBING | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 23 HEATING VENTILATION AND AIR CONDITIONING | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 26.1 ELECTRICAL | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 26.2 LIGHTING | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 27 COMMUNICATIONS | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 28.1 ELECTRONIC, SAFETY | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 28.2 SECURITY | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 32 EXTERIOR | $ - 0 | $ - 0 | $ - 0 |
TOTAL $ - 0 $ - 0 $ - 0
Div 1 - GENERAL REQUIREMENTS
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 1 - GENERAL REQUIREMENTS (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 1 - GENERAL REQUIREMENTS (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 2 - SITE WORK AND DEMO
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 2 - SITE WORK AND DEMOLITION (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 2 - SITE WORK AND DEMOLITION (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 3 - CONCRETE
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 3 - CONCRETE (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 3 - CONCRETE (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 4 - MASONRY
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 4 - MASONRY (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 4 - MASONRY (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 5 - METAL
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 5 - METALS (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 5 - METALS (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 6 - WOOD & PLASTICS
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 6 - WOOD AND PLASTICS (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 6 - WOOD AND PLASTICS (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 7 - THERMAL & MOISTURE
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 7 - THERMAL & MOISTURE (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 7 - THERMAL & MOISTURE (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 8 - DOORS & WINDOWS
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 8 - DOORS & WINDOWS (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 8 - DOORS & WINDOWS (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 9 - FINISHES
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 9 - FINISHES (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 9 - FINISHES (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 10 - SPECIALTIES
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 10 - SPECIALTIES (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 10 - SPECIALTIES (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 11 - EQUIPMENT
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 11 - EQUIPMENT (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 11 - EQUIPMENT (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 12 - FURNISHINGS & EQUIP
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 12 - FURNISHINGS & EQUIPMENT (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 12 - FURNISHINGS & EQUIPMENT (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 13 - SPECIAL CONSTRUCTION
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 13 - SPECIAL CONSTRUCTION (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 13 - SPECIAL CONSTRUCTION (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 15 - GEN CONSTRUCTION
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 15 - GENERAL CONSTRUCTION (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 15 - GENERAL CONSTRUCTION (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 21 - FIRE SUPPRESSION
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 21 - FIRE SUPPRESSION SYSTEMS (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 21 - FIRE SUPPRESSION SYSTEMS (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 22 - PLUMBING
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 22 - PLUMBING (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 22 - PLUMBING (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 23 - HVAC
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 23 - HVAC (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 23 - HVAC (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 26.1 - ELECTRICAL
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 26.1 - ELECTRICAL (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 26.2 - ELECTRICAL (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 26.2 - LIGHTING
| DATE PREPARED | ||||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | |||||||
| DIVISION 26.2 - LIGHTING (TI) | ||||||||
| MATERIAL | LABOR | |||||||
| DESCRIPTION | QUAN. | UNIT | COST | INC. O & P | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| TOTAL | $0.00 | TOTAL | $0.00 | |||||
| DIVISION 26.2 - LIGHTING (SHELL) | TOTAL | $0.00 | ||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||
| TOTAL | $0.00 | TOTAL | $0.00 | |||||
| TOTAL | $0.00 |
Div 27 - COMMUNICATIONS
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 27 - COMMUNICATIONS (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 27 - COMMUNICATIONS (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 28.1 - ELECTRIC, SAFETY
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 28.1- ELECTRICAL SAFETY (TI), | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 28.1 - ELECTRICAL, SAFETY (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 28.2 - SECURITY
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 28.2 - SECURITY (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 28.2 - SECURITY (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Div 32 - EXTERIOR
| DATE PREPARED | |||||||
| CONSTRUCTION COST ESTIMATE | December 31, 1899 | ||||||
| DIVISION 32 - EXTERIOR (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 32 - EXTERIOR (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
image1.jpeg image2.jpeg image3.png
File details come from the government source that posted it. Updated .