EXHIBIT J - P683 FacilityFinal Submission - Specs Cover Sheet sw.pdf
PDF 654 KB Posted
- Solicitation number
- N6945026R0005
About this file
This is a Work Order issued by Naval Facilities Engineering Systems Command (NAVFAC) FEC Southeast for design and engineering services related to the P683 Engine Repair Facility at Naval Air Station Jacksonville, Florida.
Work Order No. 1817922 is issued under Task Order N69450-24-F0508 and NAVFAC Contract No. N62473-19-D1212. The work was prepared by Michael Baker International (100 Airside Drive, Moon Township, PA 15108) with Don Dasher, PE serving as Project Manager and Hans Probst, PE, CQM-C as QC Manager. The multidisciplinary design team includes Rebecca Schwartz, RA (Architectural); Joseph Williams, PE (Civil); Jon Ward, SE, PE (Structural); Ray Paff (Plumbing); Jason Dillow, PE (Mechanical); Benjamin Roemer, PE (Electrical); Nick Ware, RCDD (Telecommunications); and Kristopher Kyes, PE (Fire Protection). The work order was submitted on January 12, 2026, and approved by NAVFAC Commander on January 28, 2026. This document represents the formal authorization and project team assignment for design development of the engine repair facility infrastructure improvements at the Jacksonville naval installation.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
nancy.wroten Line
| Com_Name: [FEC SOUTHEAST] |
| Work_Ord: 1817922 |
TASK ORDER: N69450-24-F0508
| Contr_txt: NAVFAC CONTRACT NO. |
| Contr_No: N62473-19-D1212 |
| PROJ_TITLE: P683 Engine Repair Facility |
| PROJ_LOC: Naval Air Station |
Jacksonville, Florida
| STAT_PROJ: |
| PREP_FIRM: Michael Baker International |
100 Airside Drive Moon Township, PA 15108 AE_CONTR: Project Manager: Don Dasher, PE QC Manager: Hans Probst, PE, CQM-C
| Arch_prep: Rebecca Schwartz, RA | |
| Civil_prep: Joseph Williams, PE | |
| Struc_prep: Jon Ward, SE, PE | |
| Geot_prep: Ray Paff | |
| Mech_prep: Jason Dillow, PE | |
| Elec_prep: Benjamin Roemer, PE | |
| Fire_prep: Nick Ware, RCDD | |
| Add_prep: Kristopher Kyes, PE | |
| Add_disc: Plumbing: | |
| Add_disc3: Telecommunications: | |
| Add_disc2: Fire Protection: | |
| 2026-01-12T13:51:43-0500 | |
| WALDROFF.SCOTT.DOUGLAS.1631370035 |
| Date_sub: 01/12/2026 | |
| 2026-01-28T07:16:11-0500 | |
| CRAFT.ROBERT.C.1407806294 |
Date_sign: 01/28/2026
File details come from the government source that posted it. Updated .