EXHIBIT M - P683 Parking Garage_Final Specifications.pdf

PDF 6 MB Posted

Attached to
P683 Aircraft Engine Repair Facility, NAS Jacksonville, FL
Solicitation number
N6945026R0005
Issued by

About this file

This document is a comprehensive technical specification for the construction of a P683 Parking Garage Facility at Naval Air Station Jacksonville, Florida, prepared by NAVFAC Southeast. The specification details the complete design requirements and construction standards across 49 divisions of work, encompassing structural, architectural, mechanical, electrical, and site infrastructure systems. Work Order No. 1817922 serves as the project identifier, with the facility designed to support military operations through a modern multi-level parking structure incorporating concrete construction, metal railings, roofing systems, fire suppression, plumbing, HVAC, electrical distribution, lighting controls, telecommunications, and comprehensive security and safety systems. The design team includes architects, structural engineers, and mechanical/electrical specialists from NAVFAC Southeast, with acceptance authority vested in Robert Craft as Design Production Director. Key construction materials specified include reinforced cast-in-place concrete with specific compressive strength requirements (4000 psi minimum), precast prestressed concrete members, steel doors and frames, aluminum-framed entrances, modified bituminous membrane roofing, and extensive electrical and mechanical systems requiring UL listings and FM Global approvals. The specification emphasizes quality assurance through third-party testing and inspection, manufacturer certifications, field testing protocols, and performance warranties extending to 20 years for roofing and flashing systems. All submittals require government approval, with specific classifications identifying drawings, product data, test reports, and certifications needed before fabrication and installation proceed.

View the file

Other files

File Type Posted
P683 Amendment 0007 Drawings.pdf PDF
P683 Amendment 0007 Specs.pdf PDF
P683 Amendment 0007 Continuation Sheet.pdf PDF
Solicitation Amendment N6945026R00050006 SF 30.pdf PDF
P683 Amendment 0006 Specs 07 42 13 23.pdf PDF
Solicitation Amendment N6945026R00050006 SF 30_PIEE CNFMN.pdf PDF
AMEND 05 - CIVIL_638 Parking Structure.pdf PDF
Solicitation Amendment N6945026R00050005 SF 30.pdf PDF
P683 Amendment 0003 Continuation Sheet.pdf PDF
P-402.pdf PDF
41369201FA001_FA001.PDF PDF
41369201FA111_FA111.PDF PDF
41369201ET111_ET111.PDF PDF
41369201ET110_ET110.PDF PDF
41369201E-001_E-001.PDF PDF
41369201E-605_E-605.PDF PDF
41369201LP110_LP111.PDF PDF
41369201LP110_LP110.PDF PDF
41369201-A601_A-601.PDF PDF
41369201-A112_A-112.PDF PDF
41369201-A130_A-130.PDF PDF
32 31 13.53 Amend 02.pdf PDF
41369201S-101_S-101.PDF PDF
41369201S-001_S-001.PDF PDF
P-110.pdf PDF
M-501.pdf PDF
41369201E-603_E-604.PDF PDF
41369201FA601_FA601.PDF PDF
41369201FA110_FA110.PDF PDF
41369201E-603_E-603.PDF PDF
41369201EG111_EG111.PDF PDF
41369201EP110_EP110.PDF PDF
41369201-AD102_AD-102.PDF PDF
41369201-AD103_AD-103.PDF PDF
41369201G-000_G-000.PDF PDF
41369201-A301_A-301.PDF PDF
41369201-A501_A-501.PDF PDF
Solicitation Amendment N6945026R00050001 SF 30.pdf PDF
N6945026R0005-P683 Aircraft ENG Rpr Facility_SiteVisitRstr.PDF PDF
EXHIBIT L - P683 Parking Garage_Final Drawings.pdf PDF
EXHIBIT F - P683 - Engine-Drawings-VOL1.pdf PDF
EXHIBIT C - G-003 - COVER SHEET VOLUME 2.pdf PDF
EXHIBIT D - G-006 - COVER SHEET VOLUME 3.pdf PDF
EXHIBIT A - Construction Schedule.pdf PDF
Attachment J - P683 Site Visit Map.pptx PPTX presentation
Attachment D- Historical Small Business Utilization.docx DOCX document
EXHIBIT J - P683 FacilityFinal Submission - Specs Cover Sheet sw.pdf PDF
EXHIBIT G - P683 - Engine-Drawings-VOL2d.pdf PDF
Attachment G - ProjNet How To Guide.pdf PDF
Attachment A - Construction Experience Project Data Sheet.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK ORDER NO. 1817922

APPROPRIATION: MCON

PARKING

At

NAS Jacksonville, FL

SUBMITTED BY:

NAVFAC Southeast, Planning Design and Construction P.O. Box 30, Building 903 NAS Jacksonville, FL 32212

PREPARED BY:

Architectural: Robert Lopez, R.A., NAVFAC SE, DC Interior Design: Misty Sieracki, RID NAVFAC SE, DC Structural: Juan Tablada, P.E., NAVFAC SE, DC Mechanical: NAVFAC SE, DC Electrical: NAVFAC SE, DC Fire Protection: NAVFAC SE, DC Civil: NAVFAC SE, DC Landscape Arch:

, P.E., Santiago Santamaria, Jesse Rodak, P.E., Andre Gandionco, P.E., Judd Lee, PLA NAVFAC SE, DC

Design Manager (DM):

David Walter, P.E. Date:

ACCEPTED BY:

For Commander, NAVFAC Southeast: ___________________________________

Robert Craft, R.A.

Design Production Director, PDC4A Date: , 2025

CRAFT.ROBERT.C.1

407806294

Digitally signed by

CRAFT.ROBERT.C.1407806294

Date: 2025.12.16 08:31:26 -05'00'

WALTER.DAVID.C.14

02520635

Digitally signed by

WALTER.DAVID.C.1402520635

Date: 2025.12.16 08:09:10 -05'00'

P683 Parking Garage Facility eProject No. 1817922 NAS Jacksonville, FL

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 02/24 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 02/24 SUMMARY OF WORK

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 9: 08/24 CAST-IN-PLACE CONCRETE

03 45 33 05/16, CHG 1: 11/21 PRECAST PRESTRESSED STRUCTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 05 23.16 08/18 STRUCTURAL WELDING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 52 00 08/23 METAL RAILINGS

05 52 20 08/23 BARRIER CABLE SYSTEMS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 14 00 08/23 FLUID-APPLIED WATERPROOFING

07 17 00 02/16 BENTONITE WATERPROOFING

07 18 00 03/17 TRAFFIC COATINGS

07 22 00 08/23 ROOF AND DECK INSULATION

07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS

07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 08/23 FLASHING AND SHEET METAL

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/23 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL LOUVERS

DIVISION 09 - FINISHES

DOCUMENT PROJECT Page 1

09 22 00 08/24 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/24 GYPSUM BOARD

09 90 00 02/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE

10 44 16 11/19 FIRE EXTINGUISHERS

10 53 13.00 25 07/12 OVERHEAD SUPPORTED CANOPIES

DIVISION 14 - CONVEYING EQUIPMENT

14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 12 00 05/11 STANDPIPE SYSTEMS

21 13 16 08/20 DRY PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 05/24 PLUMBING, GENERAL PURPOSE

22 14 29.00 02/23 SUMP PUMPS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 02/25 HVAC AIR DISTRIBUTION

23 81 00 05/24 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 08/24 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS

DIVISION 26 - ELECTRICAL

26 05 13 08/25 MEDIUM-VOLTAGE CABLES

26 05 13.00 10 11/23 MEDIUM-VOLTAGE CABLES

26 05 73 08/23 POWER SYSTEM STUDIES

26 08 00 11/22 APPARATUS INSPECTION AND TESTING

26 12 19 05/24 PAD-MOUNTED, LIQUID-FILLED,

MEDIUM-VOLTAGE TRANSFORMERS

26 13 00 05/21, CHG 1: 05/22 SF6/HIGH-FIREPOINT FLUIDS INSULATED

PAD-MOUNTED SWITCHGEAR

26 20 00 05/25 INTERIOR DISTRIBUTION SYSTEM

26 24 13 08/21 SWITCHBOARDS

26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING

26 32 15 05/24 ENGINE-GENERATOR SET STATIONARY

DOCUMENT PROJECT Page 2

15-2500 KW, WITH AUXILIARIES

26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND

BY-PASS/ISOLATION SWITCH

26 41 00 08/23 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 05/25 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 70 08/20 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 08/23 EARTHWORK

31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK

31 10 00 02/21 SITE CLEARING

31 11 00 11/18 CLEARING AND GRUBBING

31 31 16.13 08/22, CHG 1: 11/23 CHEMICAL TERMITE CONTROL

31 32 19.16 02/21 GEOTEXTILE SOIL STABILIZATION

31 63 16 11/20 AUGERED CAST-IN-PLACE PILES

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 16.71 11/22 COLD MILLING ASPHALT PAVING

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 20 05/22 BASE COURSE FOR RIGID AND SUBBASE FOR

FLEXIBLE PAVING

32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE

PAVING

32 12 13 05/24 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 15 00 05/17 AGGREGATE SURFACING

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 32 23.13 02/20 SEGMENTAL CONCRETE BLOCK RETAINING WALL

32 84 24 08/11, CHG 1: 05/17 IRRIGATION SPRINKLER SYSTEMS

32 92 23 04/06, CHG 1: 08/21 SODDING

32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 01 30.16 11/21, CHG 1: 02/24 TV INSPECTION OF SEWER LINES

33 11 00 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 40 00 11/21 STORMWATER UTILITIES

33 52 10 11/18, CHG 1: 11/20 FUEL SYSTEMS PIPING (SERVICE STATION)

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 49 -

DOCUMENT PROJECT Page 3

49 99 99 ATTACHMENTS

-- End of Project Table of Contents --

DOCUMENT PROJECT Page 4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 76 PAGES

P683 Parking Garage Facility

01 11 00 SD-01 Preconstruction Submittals

1.8 GSalvage Plan

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

GDeconstruction Plan 1.11Existing Conditions

SD-07 Certificates

1.7 GNotification

SD-11 Closeout Submittals Receipts

03 30 00 SD-01 Preconstruction Submittals Concrete Curing Plan

1.6.5 GQuality Control Program

1.6.6 GQuality Control Personnel

Certifications 1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

3.3.10Maturity Method Data

SD-02 Shop Drawings 1.6.2.1Formwork

1.6.2.2 GReinforcing Steel

SD-03 Product Data

2.4.5 SJoint Sealants

2.4.4 SJoint Filler

2.1Formwork Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 76 PAGES

03 30 00 SRecycled Aggregate Materials

2.3.1 SCementitious Materials

2.4.6Vapor Retarder 2.4.1Concrete Curing Materials

2.6 SReinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers 2.3.4Admixtures 2.6.2Mechanical Reinforcing Bar

Connectors 2.2.2Waterstops

1.8.1 SLocal/Regional Materials

2.2.3Biodegradable Form Release

Agent Pumping Concrete Finishing Plan

2.4.2Nonshrink Grout SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash 1.6.4.1Pozzolan 1.6.4.2Slag Cement 1.6.4.3Aggregates

3.14.3.3 GCompressive Strength Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 76 PAGES

03 30 00 3.14.3.5Unit Weight of Structural Concrete

Chloride Ion Concentration 3.14.3.4Air Content 3.14.3.1Slump Tests 2.3.2Water

SD-07 Certificates 2.6.1Reinforcing Bars 1.9Welder Qualifications 1.6.3.1VOC Content for Form Release

Agents, Curing Compounds, and Concrete Penetrating Sealers

1.6.3.2Safety Data Sheets 1.8.2Forest Stewardship Council

(FSC) Certification 1.6.6.2Field Testing Technician and

Testing Agency SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5 SJoint Sealants

2.4.1Curing Compound

03 45 33 SD-02 Shop Drawings

2.1.1.2 GDrawings of Precast Members

2.1.1.2 GDrawings of Precast Prestressed

Concrete Members

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 76 PAGES

03 45 33 SD-03 Product Data 2.2.9.1Inserts 2.2.10Bearing Pads

SD-05 Design Data

2.1.1.2 GDesign Calculations

1.4.3 GConcrete Mix Design

SD-06 Test Reports

1.4.3 GConcrete Mix Design

2.2.2.1Fly Ash 2.2.2.2Pozzolan 2.2.2.4Ground Granulated

Blast-Furnace Slag 2.2.4Aggregates

Concrete and Aggregate Quality Control Testing

SD-07 Certificates 2.3Quality Control Procedures

3.12 GConstruction Records

Erector's Post Audit Declaration SD-11 Closeout Submittals

1.4.4Batch Ticket

2.2.1 SRecycled Content for Fly Ash and

Pozzolan

2.2.1 SRecycled Content for Ground Iron

Blast-Furnace Slag 2.2.1Recycled Content for Silica Fume

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 76 PAGES

04 20 00 SD-02 Shop Drawings

3.3.2.1 GCut CMU

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

GCement

2.4.1.1 GCementitious Materials

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

3.2.5 GBracing Calculations

SD-06 Test Reports Field Testing of Mortar

3.6.1.1Field Testing of Grout Prism Tests

SD-07 Certificates 1.3.1Special Masonry Inspector

Qualifications 2.2.2.2Concrete Masonry Units (CMU)

Precast Concrete Units 2.4.1.1Cementitious Materials 2.4.1.3Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar

Positioners 2.6.3Joint Reinforcement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 76 PAGES

04 20 00 SD-08 Manufacturer’s Instructions 2.4.1.3Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance Data

3.8Take-Back Program 05 05 20 SD-01 Preconstruction Submittals

1.5.1.1 GInstaller Qualifications

1.5.1.2 GPost-Installed Anchor Special

Inspector Qualifications SD-03 Product Data

2.1.1.3 GMechanical Anchors in Concrete

2.1.1.4 GAdhesive Anchor System in

Concrete

3.1.3 GNon-Shrink, Non-Metallic Grout

SD-06 Test Reports

3.3.4 GPost-Installed Anchor Special

Inspections Report SD-07 Certificates

2.1.1.1 GPost-Installed Anchor

Certification

SD-08 Manufacturer’s Instructions

2.1.1.2 GManufacturer's Printed

Installation Instructions

3.1.3 GNon-Shrink, Non-Metallic Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 76 PAGES

05 05 20 1.5Manufacturer's Material Safety Data Sheets

05 05 23.16 SD-01 Preconstruction Submittals

3.2 GWelding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification 1.3.2Previous Qualifications

1.3.3 GPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports 3.3Nondestructive Testing 3.2Weld Inspection Log

SD-07 Certificates 1.3.1Certified Welding Procedure

Specifications (WPS) 1.3.1Certified Brazing Procedure

Specifications (BPS) 1.3.1Certified Procedure Qualification

Records (PQR) 1.3.1Certified Welder Performance

Qualifications (WPQ) 1.3.1Certified Brazer Performance

Qualifications (BPQ) 1.3.5Certified Welding Inspector

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 76 PAGES

05 05 23.16 1.3.5Nondestructive Testing Personnel

05 50 13 SD-02 Shop Drawings

2.4 GExpansion Joint Covers

2.5 GBollards/Pipe Guards

2.6 GAngles and Plates

SD-03 Product Data Corner Guards

2.4 GExpansion Joint Covers

GDownspout Terminations

2.1 SRecycled Content

SD-04 Samples

2.4Expansion Joint Covers SD-07 Certificates

2.1 GCertificates of Compliance

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

1.5.1 GFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips SD-03 Product Data

2.2.6 GConcrete Inserts

2.2.7 GMasonry Anchorage Devices

2.1.3 GProtective Coating

2.2.9 GSteel Railings and Handrails

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 76 PAGES

05 52 00 2.2.10 GAluminum Railings and Handrails SD-05 Design Data

GDesign Calculations For Connections

SD-07 Certificates

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions 3.2Installation Instructions

05 52 20 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

1.5.1 GFabrication Drawings

GSteel Shapes, Plates, Bars and Strips

SD-03 Product Data GConcrete Inserts GMasonry Anchorage Devices

Hardware Data Sheets (see D. Hardware Data Sheets note below) G

2.1.1 GProtective Coating

1.2.1 GAnchorage and Fastening

Systems SD-05 Design Data

GDesign Calculations For Connections

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 76 PAGES

05 52 20 GMill Test Reports SD-08 Manufacturer’s Instructions

3.2Installation Instructions Operation and Maintenance Manual

06 10 00 SD-03 Product Data 1.8Fire-retardant Treatment 2.3.2Adhesives

SD-06 Test Reports 1.4.2Preservative-treated

SD-07 Certificates 1.10.1Certificates of Grade 1.7Preservative Treatment

07 14 00 SD-03 Product Data 2.1Fluid-Applied Membrane 2.2Membrane Primer 2.8Elastomeric Sheet 2.10Flexible Foam-Backed

Elastomeric Sheet 3.3Solvent 3.4.1Moisture Meter 2.11Protection Board 2.7Bond Breaker

SD-06 Test Reports

3.4.3 GFlood Testing

GElectronic Leak Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 76 PAGES

07 14 00 SD-11 Closeout Submittals 1.6Warranty 3.6Information Card 3.5Maintenance and Repair Training

07 17 00 SD-03 Product Data

2.1 GBentonite Materials

2.1.3 GBentonite Panels

1.3 GAccessories

SD-08 Manufacturer’s Instructions 3.2Application 3.3Protection

3.5 GCorrections

07 18 00 SD-02 Shop Drawings 2.2Traffic Coating

SD-03 Product Data 2.2Traffic Coating

SD-04 Samples 2.2Traffic Coating

SD-08 Manufacturer’s Instructions 3.5Traffic-Coating Application

SD-09 Manufacturer’s Field Reports

3.6.2Traffic Coating Inspection Report SD-10 Operation and Maintenance Data

2.2Traffic Coating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 76 PAGES

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

SD-03 Product Data

2.1 GInsulation

1.4 GCover Board

2.4 GFasteners

2.1.3 SRecycled Content For Insulation

SD-05 Design Data

1.7 GWind Resistance

SD-06 Test Reports

1.8.1 GFlame Spread Rating

SD-07 Certificates

1.6 GInstaller Qualifications

1.6 GCertificates Of Compliance For

Felt Materials SD-08 Manufacturer’s Instructions

2.4 GFasteners

2.1 GInsulation

07 42 13 SD-01 Preconstruction Submittals

1.5.3 GQualification of Manufacturer

1.5.4 GQualification of Installation

Contractor

1.8 GWarranty

SD-02 Shop Drawings

1.5.1.1 GInstallation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 76 PAGES

07 42 13 2.1Recycled Content;

2.2.1 GWall Panels

2.2.2Factory Color Finish 1.5.5Closure Materials 2.5.4.4Pressure Sensitive Tape 2.5.4.1Sealants and Caulking 1.5.3.1Galvanizing Repair Paint 1.5.3.1Enamel Repair Paint

Aluminized Steel Repair Paint 1.5.5Accessories 2.5Accessories

SD-04 Samples

2.2.1 GWall Panels

1.5.3.1 GFasteners

2.5.3 GMetal Closure Strips

GColor chart SD-05 Design Data

1.5.1.2 GWind load design analysis

SD-06 Test Reports

3.7.2 GLeakage Tests

1.3.2 GWind Load Tests

2.2.2.6 GCoating

2.2.2.6 GChalking

SD-07 Certificates

1.5.3.1 GCoil Stock

1.5.3.1 GFasteners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 76 PAGES

07 42 13 1.5.3.1 GGalvanizing Repair Paint

1.5.3.1 GEnamel Repair Paint

SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-09 Manufacturer’s Field Reports

3.8.1 GManufacturer's Field Reports

SD-11 Closeout Submittals

1.8 GWarranty

1.5.6 GMaintenance Instructions

1.8.120 year 'No Dollar Limit' warranty for labor and material 07 52 00 SD-02 Shop Drawings

1.4.6 GRoof Plan

1.4.6Field Inspection and Existing

Conditions Report SD-03 Product Data

2.2 GModified Bitumen Sheets

2.4 GCold-Applied Membrane

Adhesive

2.6 GPrimer

2.8 GFasteners And Plates

1.8 GWarranty

SD-05 Design Data

1.4.5 GWind Uplift Calculations

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 76 PAGES

07 52 00 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator 1.4.3Qualification of Engineer of

Record

1.4.5 GWind Uplift Resistance

1.4.4 GFire Resistance

SD-08 Manufacturer’s Instructions

3.3.5 GModified Bitumen Membrane

Application

3.3.6 GFlashing

3.3.3.1 GCold Adhesive Applied Modified

Bitumen Membrane 2.6Primer 2.8.1Fasteners

1.6 GCold Weather Installation

SD-11 Closeout Submittals 1.8Warranty 3.8Information Card 3.7Instructions To Government

Personnel 07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.13 GGutters

3.1.14 GDownspouts

3.1.20 GExpansion Joints

3.1.17 GSplash Pans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 76 PAGES

07 60 00 GBase Flashing

3.1.9 GCounterflashing

3.1.21 GFlashing at Roof Penetrations

and Equipment Supports

2.2.11 GReglets

3.1.15 GScuppers

3.1.22 GCopings

3.1.12 GDrip Edges

3.1.16 GConductor Heads

3.1.18 GEave Flashing

2.1 SRecycled Content

SD-03 Product Data

2.2.8 GCool Roof

SD-04 Samples

1.4.2 GFinish Samples

SD-07 Certificates

2.2.7.1 GWarranty on Finishes

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

SD-10 Operation and Maintenance Data

1.4.3 GCleaning and Maintenance

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 76 PAGES

07 84 00 SD-06 Test Reports

3.3 GInspection

SD-07 Certificates 1.5.2Inspector Qualifications 2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBackstops

3.1 GField Adhesion

SD-07 Certificates

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.4 GFrames

2.4 GFrames

2.2Accessories

SD-03 Product Data

2.1 GDoors

2.4 GFrames

2.2Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 76 PAGES

08 41 13 SD-01 Preconstruction Submittals

1.2.1 GSample Warranty

1.2.1 GList of Product Installations

SD-02 Shop Drawings

3.3 GInstallation Drawings

2.2 GFabrication Drawings

SD-03 Product Data

1.2.1 GManufacturer's Catalog Data

2.2.3 GFinish

2.1.1.2 SRecycled Content of Aluminum

Material SD-04 Samples

1.2.1 GFinish and Color Samples

SD-06 Test Reports

1.2.1 GCertified Test Reports

3.4.2Deflection

SD-08 Manufacturer’s Instructions 3.3Manufacturer's Instructions

SD-11 Closeout Submittals 3.6Manufacturer's Product Warranty

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.5 GHardware Schedule

2.3.7 GKeying System

SD-03 Product Data

2.3 GHardware Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 76 PAGES

08 71 00 SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting 08 81 00 SD-02 Shop Drawings

Drawings showing complete details of the proposed setting methods, mullion details, edge blocking, size of openings, frame details, materials, and types and thickness of glass.

SD-03 Product Data Performance Documentation for all glass types

1.3Glazing Accessories 2.3.3.1Sealants

SD-04 Samples 2.3.2Glazing Compound 2.3.6Tape

Sealant SD-08 Manufacturer’s Instructions

2.3Setting and Sealing Materials 3.2Glass Setting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 76 PAGES

08 91 00 SD-02 Shop Drawings 1.4Wall Louvers

SD-03 Product Data 2.2Metal Wall Louvers

Door Louvers SD-04 Samples

1.5 GWall Louver Samples

1.5 GDoor Louver Samples

09 22 00 SD-02 Shop Drawings

2.1 GMetal Support Systems

SD-03 Product Data 2.1Metal Support Systems

09 29 00 SD-03 Product Data 2.1.1Gypsum Board 2.1.1.2Exterior Gypsum Soffit Board 2.1.6Accessories

2.1.1 SRecycled Content for Gypsum

Board SD-07 Certificates

2.1 GAsbestos Free Materials

SD-08 Manufacturer’s Instructions

2.1Safety Data Sheets SD-10 Operation and Maintenance Data

2.1Manufacturer Maintenance Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 76 PAGES

09 90 00 SD-02 Shop Drawings 3.9Piping Identification

SD-03 Product Data

2.1 GCoating

2.1Product Data Sheets

Sealant SD-04 Samples

2.2 GColor

SD-07 Certificates

1.5.4.2 GQualification Testing

SD-08 Manufacturer’s Instructions Application Instructions

2.1Mixing 1.7.1Manufacturer's Safety Data

Sheets SD-10 Operation and Maintenance Data

2.1 GCoatings

10 14 00.10 SD-02 Shop Drawings

3.1 GApproved Detail Drawings

SD-03 Product Data

2.1Modular Exterior Signage System 3.1Installation

1.2 GExterior Signage

1.2.1Wind Load Requirements

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 76 PAGES

10 14 00.10 1.2 GExterior Signage SD-10 Operation and Maintenance Data

3.1.2 GProtection and Cleaning

10 14 00.20 SD-02 Shop Drawings

1.4.2 GDetail Drawings

SD-03 Product Data

2.1 GStair Signage

2.2 GExit Door Tactile Sign

2.3 GDoor Tags

SD-04 Samples

1.4.1 GInterior Signage

GSoftware

2.1 GStair Signage

2.2 GExit Door Tactile Sign

2.3 GDoor Tags

SD-10 Operation and Maintenance Data

3.1 GApproved Manufacturer's

Instructions

3.1.2 GProtection and Cleaning

10 14 53 SD-03 Product Data

2.1Traffic Sign Posts FHWA Acceptance Letter

2.4Traffic Sign Retroreflective Sheeting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 76 PAGES

10 14 53 SD-04 Samples 2.6.2Flexible Posts

10 44 16 SD-02 Shop Drawings

2.1.1 GFire Extinguishers

Part 2 GAccessories Part 2 GCabinets

1.5 GSchedule

SD-03 Product Data

2.1.1 GFire Extinguishers

Part 2 GAccessories Part 2 GCabinets

SD-07 Certificates 2.1.1Fire Extinguishers Certifications 1.4Manufacturer's Warranty with

Inspection Tag 10 53 13.00 25 SD-02 Shop Drawings

1.3.1Shop Drawings 2.2Shop Drawings

SD-03 Product Data 1.3.2Product Data

SD-04 Samples 2.3Finishes

SD-05 Design Data 1.3.3Calculations

SD-07 Certificates 1.3.4Letter of Compliance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 76 PAGES

14 24 23 SD-02 Shop Drawings

2.1 GElevator

1.2.1 GElevator Components

1.2.2 GElevator Components

1.2.1 GElevator Machine

1.2.1 GElevator Controller

1.3.4 GWiring Diagrams

SD-03 Product Data

2.1 GElevator

1.2.1 GElevator Components

1.2.2 GElevator Components

1.2.2 GData Sheets

2.5.2 GElevator Microprocessor

Controller SD-05 Design Data

1.2.3.3Emergency Power Systems 1.2.3.2Heat Loads 1.2.3.1Reaction Loads

SD-07 Certificates

1.3.2 GPrice Lists

1.4Warranty 1.3.1.1Endorsement Letter 1.2.4Welders' Qualifications

2.5.2.3 GElevator Controller Certification

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 76 PAGES

14 24 23 2.1 GElevator

1.2.5 GMaintenance Control Program

(MCP)

2.5.2.2 GSoftware and Documentation

21 12 00 SD-02 Shop Drawings

1.4.4 GStandpipe System

SD-03 Product Data

2.1.1 GPipe and Fittings

2.1.1 GMechanical Couplings

2.1.2 GPipe Hangers and Supports

2.1.3 GValves

2.1.7 GFire Department Connections

2.2.1 GBuried Pipe and Fittings

SD-06 Test Reports

3.7.1 GPreliminary Tests

3.7.2 GAcceptance Tests

SD-07 Certificates

1.6.1 GQualifications of Installer

SD-10 Operation and Maintenance Data

GAlarm Valves GBackflow Preventer

SD-11 Closeout Submittals

1.6.2 GSystem As-Built Drawings

21 13 16 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 76 PAGES

21 13 16 1.2.4 GQualified Fire Protection Engineer (QFPE)

1.4.2.1 GSprinkler System Designer

1.4.2.2 GSprinkler System Installer

1.4.2.3 GNitrogen Generation System

Commissioning Technician SD-02 Shop Drawings

1.2.1.1 GShop Drawing

SD-03 Product Data

2.2.1 GPipe

2.3.1.2 GFittings

2.3.3 GValves

2.10.5 GRelief Valves

2.9 GSprinklers

2.3.2 GPipe Hangers and Supports

2.6.1 GSprinkler Alarm Switch

2.6.3 GValve Supervisory (Tamper)

Switch

2.8 GFire Department Connection

2.7 GBackflow Prevention Assembly

2.7.1 GHose Valve

2.6.2 GHigh/Low-Nitrogen Pressure

Supervisory Switch

1.4.2.3 GNitrogen Generation System

2.1.2 GNameplates

2.4 GDry Pipe Valve

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 76 PAGES

21 13 16 SD-05 Design Data

1.2.1.2 GHydraulic Calculations

SD-06 Test Reports

3.7.1 GTest Procedures

SD-07 Certificates

3.7.2.1 GVerification of Compliant

Installation

3.7.2.2 GRequest for Government Final

Test SD-10 Operation and Maintenance Data

3.9 GOperating and Maintenance

(O&M) Instructions

1.6 GSpare Parts

SD-11 Closeout Submittals

3.9As-built drawings 21 30 00 SD-01 Preconstruction Submittals

1.3Fire Pump Installation Related Submittals

1.7.1 GFire Protection Specialist

SD-02 Shop Drawings

3.3.1 GInstallation Drawings

3.11.2 GAs-Built Drawings

3.3.2 GPiping Layout

3.3.2 GPump Room

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 76 PAGES

21 30 00 2.1 GCatalog Data 1.6Spare Parts 3.8.2Preliminary Tests

3.8 GField Tests

1.7.6 GManufacturer's Representative

3.11.1 GField Training

Army Final Acceptance Test 3.8.3Navy Formal Inspection and

Tests SD-06 Test Reports

3.8.2Preliminary Tests

3.8.3 GNavy Formal Inspection and

Tests SD-07 Certificates

1.7.1Fire Protection Specialist 1.7.2Qualifications of Welders 1.7.3Qualifications of Installer 1.7.4Preliminary Test Certification 1.7.5Final Test Certification

SD-10 Operation and Maintenance Data

3.11.1 GOperating and Maintenance

Instructions

2.14Flow Meter 22 00 00 SD-02 Shop Drawings

3.6.1 GPlumbing System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 76 PAGES

22 00 00 SD-03 Product Data GBackflow Prevention Assemblies

2.7 GPumps

1.6.1Welding

GVibration-Absorbing Features 3.6.1Plumbing System

SD-06 Test Reports 3.6Tests, Flushing and Disinfection

GTest of Backflow Prevention Assemblies

SD-07 Certificates 1.4Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.6.1 GPlumbing System

22 14 29.00 SD-02 Shop Drawings

2.1 GConnection Diagrams

2.1 GControl Diagrams

2.1 GInstallation Drawings

SD-03 Product Data

2.1 GManufacturer's Catalog Data

2.1 GPump Performance Curve

3.3 GSpare Parts List

3.3 GSpecial Tools

2.2.1 GWet-Pit Sump Pumps

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 76 PAGES

22 14 29.00 GSubmersible Pumps GAccessories

2.2.1.10 GFloatless Electrode Level

Controls

SD-06 Test Reports

3.2.2 GHydrostatic Leak

3.2.2 GStatic Heads

3.2.2 GPump Flow Capacity

SD-07 Certificates 2.2.1.6Manufacturer's Certification of

Bearing Life SD-08 Manufacturer’s Instructions

2.1Manufacturer's Installation Instructions

2.1Vibration Specifications 23 05 93 SD-01 Preconstruction Submittals

1.3.3 GRecords of Existing Conditions

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.5.3.1 GTAB Design Review Report

SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms SD-03 Product Data

1.3 GEquipment and Performance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 76 PAGES

23 05 93 1.5.1.3 GTAB Related HVAC Submittals SD-06 Test Reports

3.3.5 GCompleted Pre-Final DALT

Report

3.3.8 GCertified Final DALT Report

1.5.3.2 GPrerequisite HVAC Work

Checkout List

1.5.3.2 GPrerequisite HVAC Work

Checkout List

1.5.3.2 GPrerequisite HVAC Work

Checkout List

3.7 GProportional Balancing

3.7 GSeason 1

3.7 GSeason 2

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.5.3.1 GDALT and TAB Submittal and

Work Schedule

1.5.3.2 GTAB Pre-Field Engineering

Report

1.5.5 GInstrument Calibration

Certificates

3.7 GDALT and TAB Procedures

Summary

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 76 PAGES

23 05 93 3.7 GCompleted Pre-Final DALT Work Checklist

3.3.2 GAdvance Notice of Pre-Final

DALT Field Work

3.7 GProportional Balancing

3.7 GSeason 1

3.7 GSeason 2

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems 3.2Pipe Insulation Systems

Duct Insulation Systems 3.3Equipment Insulation Systems

2.3.1 SRecycled content for insulation

materials SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

GDuct Insulation Systems

3.3 GEquipment Insulation Systems

SD-04 Samples

2.2.1.1 GThermal Insulation

GDisplay Samples SD-07 Certificates

2.2.1 SIndoor air quality for adhesives

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 76 PAGES

23 07 00 2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

GDuct Insulation Systems

3.3 GEquipment Insulation Systems

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-03 Product Data 2.3Refrigerant Piping System

Spare Parts 1.3.1Qualifications 3.5Refrigerant Piping Tests 3.1Verification of Dimensions

SD-06 Test Reports 3.5Refrigerant Piping Tests

SD-07 Certificates 2.1Service Organization

SD-10 Operation and Maintenance Data

1.5 GMaintenance

3.4 GOperation and Maintenance

Manuals

3.4 GDemonstrations

23 30 00 SD-02 Shop Drawings

1.4.2 GDetail Drawings

SD-03 Product Data Duct Connectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 76 PAGES

23 30 00 GGravity Backdraft and Relief Dampers

2.9.4.2Registers and Grilles 2.9.5Louvers 2.10.1.1In-Line Centrifugal Fans

GRoom Fan-Coil Units 1.4.3Test Procedures

1.2.1.2 GDiagrams

2.9.1 SIndoor Air Quality for Duct

Sealants SD-06 Test Reports

3.11 GPerformance Tests

GDamper Acceptance Test

SD-07 Certificates Bolts Ozone Depleting Substances Technician Certification

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions 3.13.2Operation and Maintenance

Training SD-10 Operation and Maintenance Data

3.13.1 GOperation and Maintenance

Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 76 PAGES

23 30 00 2.10.1.1 GIn-Line Centrifugal Fans GRoom Fan-Coil Units

SD-11 Closeout Submittals

3.12 SIndoor Air Quality During

Construction 23 81 00 SD-03 Product Data

3.7.1Spare Parts Posted Instructions

2.5.1Coil Corrosion Protection 3.6System Performance Tests

3.4 GTraining

1.5Inventory 2.2.2.5Environmental Data 2.1Supplied Products 2.2Manufacturer's Standard Catalog

Data Humidifier

SD-06 Test Reports

3.5 GRefrigerant Tests, Charging, and

Start-Up

3.6 GSystem Performance Tests

SD-07 Certificates 3.7.2Service Organizations

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 76 PAGES

23 81 00 GOperation and Maintenance Manuals

SD-11 Closeout Submittals

2.2.2.3 SOzone Depleting Substances

23 82 00.00 20 SD-03 Product Data 2.1Unit Heaters

Infrared Heaters SD-10 Operation and Maintenance Data

2.1Unit Heaters Infrared Heaters

25 05 11 SD-01 Preconstruction Submittals GAccount Lock Exception Request

3.2.3.2 GMultiple Ethernet Connection

Device Request

1.9.1.6 GContractor Computer

Cybersecurity Compliance Statements

1.9.5 GContractor Temporary Network

Cybersecurity Compliance Statements

1.7.2 GCybersecurity Interconnection

Schedule

1.7.1 GProposed STIG and SRG

Applicability Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 76 PAGES

25 05 11 GPre-Construction Control System Inventory Report

SD-02 Shop Drawings

1.7.3 GNetwork Communication, Ports, Protocols and Services Report

1.7.6 GCybersecurity Network (Riser)

Diagram SD-03 Product Data

1.7.8 GControl System Cybersecurity

Documentation

SD-06 Test Reports

3.14.1 GControl System Cybersecurity

Testing Procedures

3.14.3 GControl System Cybersecurity

Testing Report SD-07 Certificates

1.8 GSoftware Licenses

SD-11 Closeout Submittals

3.4.5.5 GPassword Change Summary

Report

3.3.5 GEnclosure Keys

1.7.5 GSoftware and Configuration

Backups

3.5.3 GAuditing Front End Software

3.5.4.1 GDevice Audit Record Upload

Software

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 76 PAGES

25 05 11 3.9 GSystem Maintenance Tool Software

3.11.2 GControl System Scanning Tools

1.7.7 GSTIG, SRG and Vendor Guide

Compliance Result Report GFinal Control System Inventory

Report 26 05 13 SD-01 Preconstruction Submittals

1.4.1 GList of Splices and Terminations

to be Installed by Splicer/Terminator

SD-02 Shop Drawings

3.1.3 GPulling Plan

SD-03 Product Data GMultiple-Conductor Shielded

Cables GMultiple-Conductor Nonshielded

Cables

2.1.2 GSingle-Conductor Shielded

Cables GSingle-Conductor Nonshielded

Cables

2.3.1 GGround Conductors

GCable Cleats GFlexible and Portable Cable

2.5.1 GCable Supports and Fittings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 76 PAGES

26 05 13 3.1.5.3 GCable Grips

2.5.2 GCable Tags

2.5.3 GFireproof Tape

GSplices

2.4.2 GTerminations

GMetal-Clad and Armored Cable GJumper Cables

3.1.8 GCable Identification

SD-05 Design Data

3.1.2 GCable Pulling Calculations

GCleat Manufacturer's Calculations

SD-06 Test Reports

1.6 GFactory Inspection and Tests

3.3 GField Acceptance Testing

3.3.1 GWire And Cable Test Record

Form

3.1.1 GPhase Rotation…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .