Exhibit I Seismic Form C.pdf
PDF 121 KB Posted
- Solicitation number
- 8CA3587
About this file
This is Seismic Form C, a pre-award commitment document that must be completed for either building retrofit or new construction projects. The form has two main parts: Part 1 requires confirmation from an engineer in charge of seismic retrofit that the building will meet the Basic Safety Objective requirements of ASCE/SEI 41 Seismic Rehabilitation of Existing Buildings, along with submission of a Tier 1 report, supporting documents, renovation scope, and retrofit schedule. Part 2 requires confirmation from the engineer in charge of structural design for new construction that the building meets specific building code requirements, including details about building characteristics such as type, height, area, design code, and year of construction.
This form is related to GSA solicitation #8CA3587 for leased office space in Blythe, CA, which requires 1,658 ABOA square feet of office space with 3 surface parking spaces, including pull-through parking for oversized trucks with trailers. The lease term is 10 years (5 years firm with a 5-year option). Space must meet Government requirements for fire safety, accessibility, seismic, and sustainability standards. Offers are due January 31, 2025, with estimated occupancy by October 1, 2025. All offers must be submitted electronically through the RSAP platform at lop.gsa.gov/rsap.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LESSOR: ________ GOVERNMENT: ________ SEISMIC FORM C
SEISMIC FORM C
BUILDING RETROFIT OR NEW CONSTRUCTION
PREAWARD COMMITMENT
PART 1
PREAWARD COMMITMENT TO RETROFIT BUILDING:
Date: __________
This affirms that _________________________ shall serve as the engineer in charge of the seismic retrofit of the building located at ________________________. The retrofit must be designed to meet the Basic Safety Objective, as set forth in ASCE/SEI 41 Seismic Rehabilitation of Existing Buildings.
In accordance with the requirements of this Standard and the seismic paragraph in the Request for Lease Proposals (RLP), our offer includes a commitment to retrofit the building to satisfy all of the Basic Safety Objective requirements of ASCE/SEI 41. The offer includes a Tier 1 report with all supporting documents, a narrative explaining the process, scope of renovations, and a schedule for the seismic retrofit. Documentation shall be provided before award that demonstrates the seismic retrofit will meet the seismic standards and be completed within the time frame required.
PART 2
PREAWARD COMMITMENT TO CONSTRUCT A NEW BUILDING:
Date: __________
This affirms that _________________________ will serve as the engineer in charge of the structural design of the building located at ________________________. The criteria for design must be the ______ edition of the _____________________ building code.
In accordance with the requirements of this code, we prepared a quality assurance plan that included requirements for testing and inspecting critical elements of the structure and also periodic observation by our staff. We reviewed special inspection and testing reports prepared by the inspection agency and contractor submittals. On the basis of this, and to the extent permitted by this level of construction surveillance, it is my opinion that the Building was designed and constructed in conformance with the requirements of the above code.
The building has the following characteristics:
Building Type: Building Height: Approx. Area:
Building Design Code: Year of Design Code: Year of Construction:
OFFEROR
SIGNATURE NAME OF SIGNER
SEISMIC FORM C