Exhibit F Scope of Work JK.pdf

PDF 95 KB Posted

Attached to
Swimming Pool Repairs for the Richmond State Supported Living Center
Solicitation number
HHS0018208
Issued by
Fort Bend County, Texas

About this file

This Scope of Work document outlines pool repair and refinishing services required by the HHS Agency for Building 536, RSSLC Natatorium, located at 2100 Preston, Richmond, Texas 77469. The project encompasses restoration and refinishing of approximately 9,213 square feet of designated pool deck and adjacent concrete areas, including the main pool deck (5,750 sq. ft.), pool coping (260 sq. ft.), foyer area (312 sq. ft.), restrooms (620 sq. ft.), concrete surrounding a splash pad (384 sq. ft.), and bare concrete near the splash pad including sidewalk to gate (1,887 sq. ft.). Work includes mechanical grinding and removal of existing coatings, surface preparation, treatment of cracks with epoxy repair material, application of multi-coat spray-applied textured deck finishes, and renewal of pool perimeter sealant at approximately 268 linear feet and designated deck joints at approximately 1,061 linear feet combined across all areas. The contract term runs from the date of award through August 31, 2027. Contractor performance is required Monday through Friday between 8 a.m. and 5 p.m. Central Time, with a four-hour response time for service calls unless extended by the HHS Agency Contract Manager.

The contractor must possess Multicoat certification, demonstrate a minimum of five years of experience in related services, and maintain a location within 20 miles of the facility. The contractor is responsible for furnishing all labor, supervision, materials, tools, equipment, transportation, and incidentals necessary to complete work in accordance with manufacturer specifications and applicable codes. Before work commences, the contractor must submit a detailed work plan, anticipated schedule, product data sheets, safety data sheets, proposed coating system details, color and texture samples, and warranty terms for facility review and approval. The document does not specify pricing terms, set-asides, incumbent information, or funding sources. Upon completion, all work areas must pass inspection demonstrating uniform coating application, proper joint sealing, and site cleanliness, with the contractor responsible for correcting any deficiencies at no additional cost before final acceptance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit F SOW – Pool Repair

Services to be performed

1. Purpose The purpose of this project is to restore and refinish designated pool deck and adjacent concrete areas. Work includes removal or preparation of existing coatings where specified, treatment of cracks as needed, renewal of designated joints, and application of a compatible textured deck coating system. The contractor shall furnish all labor, supervision, materials, tools, equipment, protection, and incidentals necessary to complete the work safely and in accordance with the manufacturer's written instructions and applicable codes.

2. Work Areas and Measured Quantities The quantities below are based on the measurements provided for planning and bid purposes. Bidders must review the site conditions and identify any discrepancy or clarification needed before submitting a proposal.

Area Estimated Quantity Required Work

A. Main pool deck 5,750 sq. ft. Mechanically grind and remove the existing deck finish/coating to a suitable substrate. Prepare the surface and apply a compatible multi-coat spray-applied deck finish with classic texture. Treat cracks with an appropriate epoxy repair material where required. Remove and replace/renew pool-perimeter sealant at approximately 268 linear feet.

Remove concrete covering the designated 3/4-inch deck joints and install suitable joint mastic at approximately 992 linear feet.

B. Pool coping 260 sq. ft. Mechanically abrade/grind the existing painted coping surface to remove the existing paint and prepare it for recoating. Apply a compatible multi-coat spray deck finish with classic texture over the prepared coping surface.

C. Foyer area 312 sq. ft. Mechanically abrade/grind the existing painted concrete to remove the paint and prepare the surface. Apply a compatible multi-coat spray deck finish with classic texture over the prepared concrete.

D. Restrooms 620 sq. ft. Mechanically abrade/grind the existing painted concrete surface to remove the paint and prepare the substrate. Apply a compatible multi-coat spray deck finish with classic texture over the prepared concrete.

E. Concrete surrounding splash pad

384 sq. ft. Apply a compatible multi-coat spray deck finish with classic texture over the existing concrete after appropriate cleaning and surface preparation.

Remove designated 3/4-inch joints and install suitable joint mastic at approximately 24 linear feet.

F. Bare concrete near splash pad, including sidewalk to gate

1,887 sq. ft. Prepare the existing bare concrete and apply a compatible multi-coat spray deck finish with classic texture. Renew designated 3/4-inch joints with suitable joint mastic at approximately 45 linear feet. The work area includes the sidewalk extending to the gate.

3. General Technical Requirements

• Inspect each work area before starting and confirm the limits of work with the facility representative.

• Protect the pool, pool water, drains, splash-pad equipment, doors, walls, fixtures, landscaping, and adjacent finished surfaces from dust, debris, overspray, and damage. Do not allow coating materials, grinding residue, or joint products to enter the pool or drainage system.

• Use suitable mechanical preparation methods and remove loose, failing, or incompatible material. The finished substrate must be clean, sound, and prepared in accordance with the coating and repair-product manufacturers' instructions.

• Use coating, epoxy crack-treatment material, and joint mastic products that are compatible with the existing substrate and with one another. Submit product data, color/texture samples, and installation instructions for facility review before application.

• Apply the coating system at the manufacturer's specified coverage and thickness, including all required coats, curing times, and environmental conditions. Provide a consistent, uniform textured finish across each designated area.

• Joint work shall use appropriate backer material or joint preparation where required by the selected system and manufacturer. Preserve the function of expansion/control joints; do not bridge joints with rigid coating.

• Maintain a safe work zone, provide appropriate warning signs and barriers, and coordinate access restrictions with the facility. Work shall not resume for public or facility use until materials have cured for the period required by the manufacturer and the area is approved for reopening.

• Remove waste and debris from the site and leave all work areas clean at completion. Dispose of materials in accordance with applicable requirements.

4. Submittals and Coordination

• Before work begins, submit a written work plan, anticipated schedule, product data sheets, safety data sheets, proposed coating system, color/texture information, and warranty terms.

• Coordinate staging, access, noise, dust control, and any temporary closures with the facility representative. Do not begin work until the work plan and materials are approved.

• Notify the facility representative promptly if actual site conditions differ from the stated quantities or scope. Obtain written authorization before performing work outside the approved scope.

• The contractor is responsible for verifying field dimensions and quantities before ordering materials or beginning work.

5. Inspection and Acceptance Upon completion, the contractor and facility representative shall review the work areas. Acceptance requires that the specified areas have been treated, coating is uniform and properly bonded with no visible peeling, missed areas, or significant application defects, designated joints are properly sealed without obstructing their intended movement, and the site is clean and safe for return to service.

Deficiencies attributable to the contractor shall be corrected at no additional cost before final acceptance.

6. Schedule and Warranty The bidder shall identify the proposed project duration and provide written warranty details for workmanship and materials, including coverage period, exclusions, and the process for reporting and correcting defects.

• Total of all listed surface areas: 9,213 sq. ft.

• Pool coping area: 260 sq. ft. (verify whether included in the main pool deck measurement)

• Pool perimeter sealant/joint renewal: 268 linear feet

• Deck joints at main pool deck: 992 linear feet

• Joints around splash pad: 24 linear feet

• Joints near splash pad/sidewalk to gate: 45 linear feet

Quantity note: The six listed surface areas total 9,213 sq. ft. when added together (5,750 + 260 + 312 + 620 + 384 + 1,887). Confirm whether the coping area is measured separately from the main pool deck before finalizing the bid schedule.

Use the area-by-area table as the controlling schedule of quantities unless the facility confirms otherwise.

Location Contractor must complete all repairs to building 536, RSSLC Natatorium.

Located at 2100 Preston Richmond, TX 77469.

Contract Term Date of award – August 31, 2027

Performance schedule Contractor shall perform contracted services, including any minor adjustment call-back services, Monday through Friday between the hours of 8 a.m. and 5 p.m. (Central Time). Contractor shall not interfere with normal flow of HHS Agency business at the service location.

Contractor shall respond to all service calls within four (4) hours of HHS Agency request unless the Response Deadline is extended by the HHS Agency Contract Manager.

Services Outside Regular Business Hours Any services performed outside of regular business hours (8 a.m. to 5 p.m.

Central Time) must be requested and/or approved in writing by the HHS Agency Contract Manager.

Services performed outside of the regular service hours without prior approval will be at Contractor’s own risk and must be billed at the established Regular Business Hours service rate.

Emergencies: The HHS Agency reserves the right to declare any necessary work within the Scope of Services to be an emergency during regular service hours or outside regular service hours and will request emergency services in writing. Contractor shall respond on-site to a request for emergency services within one (1) hour of notification and continue work until the services requested are complete to the satisfaction of the HHS Agency.

Minimum Experience and Qualifications These minimum requirements apply to the contractor and contractor’s personnel and any subcontractor’s personnel.

• Must have Multicoat certification.

• The minimum required experience is 5 years.

• Contractor shall furnish all labor, tools, equipment, transportation, materials/supplies as necessary to perform services/goods as requested.

• Contractor shall comply with all federal, state and local laws, statutes, ordinances, rules, and regulations and the orders and decrees of any court or administrative bodies or tribunals in any matter affecting performance of the contract including, if applicable, workers' compensation laws, minimum and maximum salary and wage statutes and regulations, and licensing laws and regulations.

• The contractor shall be located within 20 miles of the facility located at 2100 Preston Richmond TX 77469.

File details come from the government source that posted it. Updated .